Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
8 views3 pages

Fady Gamal Senior

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 3

Fady Gamal Salama George, PMP®

Civil Project Engineer / Project Control Engineer


Over 9 years of Experience in state of Qatar and Egypt.

Profile:-
- Certified from QATAR Municipality & Urban planning ministry
–– UPDA MMUP Reg. No. 11268.
- Member of Federation of Arab Engineers. No. 16\79549
Contact Number - Member of Egyptian Engineering Syndicate-No. 46\00559.
- Mobile: - Member of Project Management Institute.
002 012 82787854
- Home: - Education & Qualification:-
002 03 4414628
Email Address  BS.C of Civil Engineering – Faculty of Engineering, Alexandria
University – Egypt, Class of 2007 - 2012.
civil.eng.fady.gamal@gmail.com
Graduation Project: - Design of Harbours and offshore
Linked in:- structures.
 PMP - Project Management Professional
certified from PMI, Nov.2020.

Certifications and Technical Studies Expertise:-


 Project management Professional.
 planning and cost control.
 BIM Modelling.
 Internal auditor Training for ISO 9001:2015,
conducted by Quality Austria Gulf- Dec.2017.
 Qatar Petroleum PTW- Certificate for work permits.
Permanent Address
 TOTAL E&P PTW- Certificate for work permits.
211-213 Max Street al wardian –
Alexandria – Egypt  Enterprise development (Marketing – Business
Administration – Finances) (Certified from SHELL petroleum).
Personal Data  ICDL certified from UNISCO.
Date of Birth : 04\08\1990  Safety training Course.
Gender : Male
 Diploma for Site Implementation practices with Consultant
Nationality : Egyptian
Marital Status : Married ,2 Kids Hassan Qandil (100 hours - March 2013).
Military service: Exempted.  English – by American Culture Association.
Languages : Arabic- Native
English-Fluent Software Experience:-
Personnel Skills:-
 Revit Structural levels 1 & 2 Professional 2019.
- Leader
 Primavera P.6
- Work under pressure and
 M S Project
deadlines.
 Power Bi.
- Communication-Skills
 AutoCAD.
- Presentation-Skills
 Microsoft office.
- Technical Writing
 SAP2000.
- Reporting
 Naviswork.
- Following up
- Driving Licence ”Egypt &
Qatar” 1 of 3
Work Experience:-

 MARSEILIA GROUP. Egypt.


Position: Project Control Engineer. “May. 2021- Present”
Project:-
- Construc on of Marseilia Beach 4 Resort “2nd and 3rd stage”, Sidi abd elrahman, North Coast. Egypt.
650.0 No’s of Villas, chalet’s, palaces, including infrastructure and landscape works.
Budget: - 1.000.000.000,0 EGP
Client: - Marseilia Group for investment.
Consultant: UGCE
Main Contractor: Jemeirah Egypt
Key Duties:-
- Acting as an owner Representative.
- Review and approve all Technical submittals.
- Monitor and Control project schedule, detect delays and coordinate Claims & EOT.
- Communicate and liaise between all project disciplines for site Coordination.
- Review and approve all Contractor invoices and control project Cost.

 EHAF Consulting Engineers. Egypt.


Position: Senior Civil Engineer. “Jul. 2020- Apr. 2021”
Project :
- Construction of Bo Island Resorts, Sidi abd elrahman, North Coast. Egypt.
182.o No’s of Villas including all infra-structure and landscape works.
Budget: 568.000.000,0 EGP
Client: Maxim Developments
Consultant: EHAF Consulting Engineers
Main Contractor: Al-shrouk for General Contracting
Key Duties:-
- Supervision of Site execution Activities, Coordinate resolve all technical issues.
- Review and approve Technical submittals, shop drawings, proposals and method statements.
- Monitor and control Quality Activities and quality assurance.
- Control Project Documentations to adhere with quality standards.

 Alexandria Water Company, Egypt.


Position: Project Engineer. “June. 2019- June.2020”
Projects :
- Renovation of Water treatment plant station Marriott 2, K.40, Alex-Cairo desert road.
Budget: 95.000.000,0 EGP
Client: Alexandria Water Company
Main Contractor: AGTI for General Contracting
Key Duties:-
- Supervision of Site execution Activities.
- Review and approve Technical submittals.
- Produce monthly invoices for subcontractors.

 Orientals Enterprises W.l.l. Doha – Qatar.


Position: Project Engineer. “Nov. 2013- Apr.2019”
Projects Participated:
1- Construction of four Nos. of high rise Towers “Mozoon Towers” Doha – Qatar.
23,34,38,42 Floors, including enabling works, Sub structure and Super structure concrete and finishing works
Budget: 1.200.000.000,0 QAR
Client: Qatar General insurance company “GRECO”

2 of 3
Consultant: MZP
Main Contractor: Orientals Enterprises, W.l.l Doha Qatar.
2- Construction of General Takaful commercial building – C Ring Road – Doha – Qatar.
“Fast Track Project, 4 Basements, G.Floor, 4 Floors including finishing ll handing over”
Budget: 80.000.000,0 QAR
Client: Qatar General insurance company “GRECO”
Consultant: Khatib & Alami
Main Contractor: Orientals Enterprises, W.l.l Doha Qatar.
3- Construction of Centralized Industrial Buildings – CIA – Halul island – Qatar;
One office building, workshop, two storages, blasting booth workshop and sea shore line protection
Budget: 220.000.000,0 QAR
Client: Qatar Petroleum QP
Consultant: QP
Main Contractor: Orientals Enterprises, W.l.l Doha Qatar.
4- Civil miscellaneous works in PWT & COD Gas Plant facilities –Halul Island – Qatar.
Gas pipeline foundations and two tanks inside the Gas plant
Budget: 34.000.000,0 QAR
Client: Total E&P Qatar
Consultant: Total E&P Qatar
Main Contractor: Orientals Enterprises, W.l.l Doha Qatar.

Key Achievements:-
- Accomplish above projects on time, Cost, and Required Quality.
- Satisfy all client Requirements and maintain full coordination between stakeholders.
- Resolve all Technical issues with perfect Quality and Minimum cost.
- Monitor and Control Schedule and Cost to ensure Project success and Achieve profit.
- Build strong relationships with clients and Consultants.

 Royal Tents Egypt.


Position: Site Engineer. ”Aug. 2012- Sep.2013”
Projects :
Construction of extension for reef oasis hotel located in sharm el sheikh, Egypt.
Key Duties:
- Execution of finishing work.
- Work to fulfil client requirements.

Internship Experience Prior to Graduation 2009 to 2012:-


• Egyptian Petrochemicals, Alexandria- Egypt: July 2009.
• Alexandria for Petroleum: July 2010.
• El-Salam Inter Build for realstate: August 2010.
• Alexandria for Construction (Talat-Mostafa) Sep. 2010.
• The Arab Contractors (El-mokawlon Al-arab): August 2011.
• Qasr-El-Salam real state – Alexandria Egypt: Jan, 2012
References
• Engr.Adib El-choufani -Orientals Enterprises Qatar | General Manager
P: +974 55809943
E: info@orientalsqatar.com
• Engr.Younes Ayyad -Orientals Enterprises Qatar | Projects Manager
P: +974 66231343
E: y.ayyad@orientalsqatar.com

All Documents are available upon request, Thank you


3 of 3

You might also like