NAME OF WORK- IMPLEMENTATION OF RETROFITTING OF COMPLETED PWSS UNDER JJM

NAME OF PWSS - NEGHERETING PWSS

NAME OF CONTRACTOR - M/S GLOBAL POWER & ENGINEERS

W/O NO. - ACE/PHE/N/PB-86/JC/VOLL-II/20-21/4317/ DT/03-12-2020

1) IS THE SCHEME COMMISSIONED - YES

2) DATE OF COMMISSIONING - 12/3/2020

3) NO. OF HOUSE CONNECTIONS PROVIDED - 316

4) VWSC/USERS COMMITTEE FORMED - YES

5) IS THE BANK ACCOUNT OPENED - YES

6) IS THE COMMITTEE REGISTERED - NO

7) SCHEDULED DATE OF COMPLETION - 9/23/2021

8) FINALISED WORK OEDER VALUE- 97.05 L

JE/AE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
COMPLETION CERTIFICATE

Name of measuring
AA officer Upto date
Work Date of Item of Payment Present Bill
Name of AA No. & Amount Name of Date of MB No. & Bill value
Order No. Commenceme work with already Value (Rs. In
Scheme Date (Rs. In contractor completion Page No. (Rs. In
& Date nt Quantity Name Signature made Lakhs)
Lakh) Lakhs)

PHEE/BKT/TB-128/2020-21/5724-
Chairman/DWSM/GLT/JJM-07/2020-21/7215/

MB No-009 and page N0 30 to 83


GONDHIA GAON PWSS

Sri Olympica Gogoi, JE


Sri KHOGEN GOGOI
A/dt/02-02-2021

-₹ 3,898,065.00
₹ 4,753,383.00

₹ 855,318.00
12/21/2021
2/12/2021
Dt.21/12/2020

AS PER MB
49.00

Say Rs ₹ 3,898,065.00

N.B. - Certified that the work has been physically verified by me and found completed 100% by the aforesaid contractors in all respect as per specification, drawing and tender agreement

Countersigned

Accounts Officer Executive Engineer (PHE) Asstt. Executive Engineer (PHE)


Bokakhat PHE Division Bokakhat Division Dergaon Sub-Division
Bokakhat Bokakhat Dergaon
UTILISATION STATEMENT OF DTW

Name of Contractor : - ZSEE SMART SOLUTION INDIA

W/O No. - SE(PHE)/JOR/TB-192©/2021-21/7330/dtd-20/02/2021

150mm dia UPVC strainner


150mm dia UPVC Pipe

150 mm dia MS clamp


150mm dia MS cone

Bentonite Clay

Pea gravel
Description of materials

Unit RM RM NO MT M³ No
Quantity purchased by contractor 103.5 21 1 3 40 2

Quantity utilised in work 103.5 21 1 3 40 2

Balance Nil Nil Nil Nil Nil Nil


UTILISATION STATEMENT

Name of Work : - Implementation of different Piped water Supply Scheme under Bokakhat (PHE) Division for retrofitting under Jal Jeevan
Mission(JJM) Assam Situation of Work :- At Da-Dhora (Ahom) PWSS.
Name of Contractor : - M/S PURVATTAR ENTERPRISE
Work Order NO:-PHE-34/JJM/PB/2020-21/2923/Dated /05/06/2021
Cement Reinforcement
Sl. No. Item of works No L B H Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.40 2.40 0.10 2.304 13.82 0.629 1.260 14 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.40 2.40 0.45 10.368 86.98 2.590 5.184 to multiply with 1.54
4 3.05 0.25 0.45 0.343 2.88 0.080 0.171
4 2.10 0.45 0.45 1.701 14.26 0.425 0.850
3 Reinforcement
Foundation (12mmØ) 4 29 2.86 331.76 RM 0.89 kg/m 2.95
chair (12mmØ) 4 5 2.10 42.00 RM 0.89 kg/m 0.37
Column (20mmØ) 4 8 3.50 112.00 RM 2.47 kg/m 2.77
Tai Beam (16mmØ) 1 8 15.60 124.80 RM 1.58 kg/m 1.97
Stirupps (8mmØ)
Column 4 68 1.46 397.12 RM 0.39 kg/m 1.55
Beam 4 34 1.25 170.00 RM 0.39 kg/m 0.66
Total 117.94 3.724 7.465 10.27
Total Qnty in dry volume 118 bag 5.734 11.496 10.27

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
UTILISATION STATEMENT
Name of Work : - Retrofitting of KHONGIA PWSS under JJM (ESR footing of 60,000 ltr capacity)
Name of Contractor : - CHIRANJIT BORAH

Cement Reinforcement
Sl. No. Item of works No L B H Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 3.00 3.00 0.10 4.80 28.80 1.300 2.620 59 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.80 2.80 0.45 14.112 118.39 3.520 7.050 to multiply with 1.54
4 2.10 0.45 0.45 1.701 14.27 0.425 0.850
4 3.05 0.30 0.45 1.647 13.81 0.411 0.823
3 Reinforcement
Foundation (12mmØ) 4 29 3.16 1466.24 RM 0.89 kg/m 13.04
chair (12mmØ) 4 5 2.10 42.00 RM 0.89 kg/m 0.37
Column (20mmØ) 4 12 3.50 168.00 RM 2.47 kg/m 4.14
Tai Beam (16mmØ) 1 8 3.95 126.40 RM 1.58 kg/m 1.99
Stirupps (8mmØ)
Column 4 17 1.46 99.28 RM 0.39 kg/m 0.38
Beam 4 34 1.25 127.50 RM 0.39 kg/m 0.49
Total 175.27 5.656 11.343 20.41
Total Qnty in dry volume 176 bag 8.71 17.47 20.41

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
UTILISATION STATEMENT
Name of Work : - Retrofitting of EKORANI PWSS under JJM (ESR footing of 30,000 ltr capacity)
Name of Contractor : - M/S P& P Enterprise, Prop Porag Bhuyan.
W/O No. - SE/PHE/JOR/TB-192(C)/2020-21/4818/dtd-21/11/2020

Cement Reinforcement
Sl. No. Item of works No L B H Qtty Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.20 2.20 0.10 1.94 2.98 11.64 0.812 1.620 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.20 2.20 0.45 8.712 13.41 73.09 3.350 6.700 to multiply with 1.54
4 2.50 0.40 0.40 1.60 2.46 13.42 0.610 1.230
4 3.05 0.25 0.45 1.37 2.10 11.49 0.520 1.050
3 Reinforcement
Foundation (12mmØ) 4 30 2.30 276.00RM 0.617 kg/m 1.7
chair (12mmØ) 4 22 2.30 202.40 RM 0.617 kg/m 1.25
Column (20mmØ) 4 12 2.65 127.20 RM 1.58kg/m 2
Tai Beam (16mmØ) 1 8 3.90 124.80 RM 1.58kg/m 1.97
Stirupps (8mmØ)
Column 4 17 1.64 111.52 RM 0.39 kg/m 0.44
Beam 4 24 1.30 124.80RM 0.39 kg/m 0.48
Total 109.64 5.292 10.600 7.84
10% w + 0.784
Total Qnty in dry volume 110 bags 5.734 11.496 8.624

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
UTILISATION STATEMENT
Name of Work : - Retrofitting of GULUNG DOITAL PWSS under JJM (Brick Boundary Wall)
Name of Contractor : - M/S Purvattar Enterprise

Cement
Sl. No. Item of works Unit Qtty Sand m³ Agg. m³ MB No Remarks
bags
1 PCC (1:3:6) M³ 0.94 4.40 0.604 1.209 14
RCC (M 20) (1:1.5:3)
machine mix
2 M³ 1.56 12.53 0.640 1.289
RCC (M 20) (1:1.5:3) without
machine mix
M³ 5.58 44.68 2.280 4.569
M³ 71.53
3 Brick nogged Wall
112 mm thick (1:5) M² 427.5 11.542
4 Cement Plaster (1:4)
on rough side (15 mm) M² 370.5 6.52 4.979
on fair side (15 mm) M² 481.36 8.4 6.469
Total Qnty in dry volume 88.072 14.97 7.07

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
UTILISATION STATEMENT
Name of Work : - Retrofitting of HAHCHORA KOIBARTA PWSS under JJM (ESR footing of 40,000 ltr capacity)
Name of Contractor : - M/S AGARWALLA & SONS

Cement Reinforcement
Sl. No. Item of works No L B H Qtty Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.20 2.20 0.10 1.94 2.98 11.64 0.812 1.620 58 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.20 2.20 0.45 8.712 13.41 73.09 3.350 6.700 to multiply with 1.54
4 2.50 0.40 0.40 1.60 2.46 13.42 0.610 1.230
4 3.05 0.25 0.45 1.37 2.10 11.49 0.520 1.050
3 Reinforcement
Foundation (12mmØ) 4 30 2.30 276.00RM 0.617 kg/m 1.7
chair (12mmØ) 4 22 2.30 202.40 RM 0.617 kg/m 1.25
Column (20mmØ) 4 12 2.65 127.20 RM 1.58kg/m 2
Tai Beam (16mmØ) 1 8 3.90 124.80 RM 1.58kg/m 1.97
Stirupps (8mmØ)
Column 4 17 1.64 111.52 RM 0.39 kg/m 0.44
Beam 4 24 1.30 124.80RM 0.39 kg/m 0.48
Total 109.64 7.84
10% w + 0.784
Total Qnty in dry volume 110 bags 5.292 10.06 8.624

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon
UTILISATION STATEMENT
Name of Work : - Retrofitting of HANHPANI PWSS under JJM (ESR footing of 20,000 ltr capacity)
Name of Contractor : - UDAY BHASKAR DOLEY
W/O No. - SE/PHE/JOR/TB-192(C)/2020-21/4690/dtd-14/12/2020

Cement
Sl. No. Item of works Qtty Sand m³ Agg. m³ Remarks
bags
1 PCC M-15 (1:1.5:3) 0.78 m³ 4.68 0.035 0.425 For convert the wet volume
to dry volume it is reuired to
2 RCC M-25 (1:1:2) 3.71 m³ 31.12 0.925 1.850 multiply with 1.54

3 Reinforcement 6.52 Qtl - - -

Total Qnty in dry volume 6.52 Qtl 36 bags 0.96 2.275

JE (PHE) Asstt. Executive Engineer (PHE)


Dergaon Sub-Division, Dergaon Dergaon Sub-Division, Dergaon