Utilization of PWSS JJM
Utilization of PWSS JJM
Utilization of PWSS JJM
Name of measuring
AA officer Upto date
Work Date of Item of Payment Present Bill
Name of AA No. & Amount Name of Date of MB No. & Bill value
Order No. Commenceme work with already Value (Rs. In
Scheme Date (Rs. In contractor completion Page No. (Rs. In
& Date nt Quantity Name Signature made Lakhs)
Lakh) Lakhs)
PHEE/BKT/TB-128/2020-21/5724-
Chairman/DWSM/GLT/JJM-07/2020-21/7215/
-₹ 3,898,065.00
₹ 4,753,383.00
₹ 855,318.00
12/21/2021
2/12/2021
Dt.21/12/2020
AS PER MB
49.00
Say Rs ₹ 3,898,065.00
N.B. - Certified that the work has been physically verified by me and found completed 100% by the aforesaid contractors in all respect as per specification, drawing and tender agreement
Countersigned
Bentonite Clay
Pea gravel
Description of materials
Unit RM RM NO MT M³ No
Quantity purchased by contractor 103.5 21 1 3 40 2
Name of Work : - Implementation of different Piped water Supply Scheme under Bokakhat (PHE) Division for retrofitting under Jal Jeevan
Mission(JJM) Assam Situation of Work :- At Da-Dhora (Ahom) PWSS.
Name of Contractor : - M/S PURVATTAR ENTERPRISE
Work Order NO:-PHE-34/JJM/PB/2020-21/2923/Dated /05/06/2021
Cement Reinforcement
Sl. No. Item of works No L B H Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.40 2.40 0.10 2.304 13.82 0.629 1.260 14 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.40 2.40 0.45 10.368 86.98 2.590 5.184 to multiply with 1.54
4 3.05 0.25 0.45 0.343 2.88 0.080 0.171
4 2.10 0.45 0.45 1.701 14.26 0.425 0.850
3 Reinforcement
Foundation (12mmØ) 4 29 2.86 331.76 RM 0.89 kg/m 2.95
chair (12mmØ) 4 5 2.10 42.00 RM 0.89 kg/m 0.37
Column (20mmØ) 4 8 3.50 112.00 RM 2.47 kg/m 2.77
Tai Beam (16mmØ) 1 8 15.60 124.80 RM 1.58 kg/m 1.97
Stirupps (8mmØ)
Column 4 68 1.46 397.12 RM 0.39 kg/m 1.55
Beam 4 34 1.25 170.00 RM 0.39 kg/m 0.66
Total 117.94 3.724 7.465 10.27
Total Qnty in dry volume 118 bag 5.734 11.496 10.27
Cement Reinforcement
Sl. No. Item of works No L B H Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 3.00 3.00 0.10 4.80 28.80 1.300 2.620 59 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.80 2.80 0.45 14.112 118.39 3.520 7.050 to multiply with 1.54
4 2.10 0.45 0.45 1.701 14.27 0.425 0.850
4 3.05 0.30 0.45 1.647 13.81 0.411 0.823
3 Reinforcement
Foundation (12mmØ) 4 29 3.16 1466.24 RM 0.89 kg/m 13.04
chair (12mmØ) 4 5 2.10 42.00 RM 0.89 kg/m 0.37
Column (20mmØ) 4 12 3.50 168.00 RM 2.47 kg/m 4.14
Tai Beam (16mmØ) 1 8 3.95 126.40 RM 1.58 kg/m 1.99
Stirupps (8mmØ)
Column 4 17 1.46 99.28 RM 0.39 kg/m 0.38
Beam 4 34 1.25 127.50 RM 0.39 kg/m 0.49
Total 175.27 5.656 11.343 20.41
Total Qnty in dry volume 176 bag 8.71 17.47 20.41
Cement Reinforcement
Sl. No. Item of works No L B H Qtty Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.20 2.20 0.10 1.94 2.98 11.64 0.812 1.620 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.20 2.20 0.45 8.712 13.41 73.09 3.350 6.700 to multiply with 1.54
4 2.50 0.40 0.40 1.60 2.46 13.42 0.610 1.230
4 3.05 0.25 0.45 1.37 2.10 11.49 0.520 1.050
3 Reinforcement
Foundation (12mmØ) 4 30 2.30 276.00RM 0.617 kg/m 1.7
chair (12mmØ) 4 22 2.30 202.40 RM 0.617 kg/m 1.25
Column (20mmØ) 4 12 2.65 127.20 RM 1.58kg/m 2
Tai Beam (16mmØ) 1 8 3.90 124.80 RM 1.58kg/m 1.97
Stirupps (8mmØ)
Column 4 17 1.64 111.52 RM 0.39 kg/m 0.44
Beam 4 24 1.30 124.80RM 0.39 kg/m 0.48
Total 109.64 5.292 10.600 7.84
10% w + 0.784
Total Qnty in dry volume 110 bags 5.734 11.496 8.624
Cement
Sl. No. Item of works Unit Qtty Sand m³ Agg. m³ MB No Remarks
bags
1 PCC (1:3:6) M³ 0.94 4.40 0.604 1.209 14
RCC (M 20) (1:1.5:3)
machine mix
2 M³ 1.56 12.53 0.640 1.289
RCC (M 20) (1:1.5:3) without
machine mix
M³ 5.58 44.68 2.280 4.569
M³ 71.53
3 Brick nogged Wall
112 mm thick (1:5) M² 427.5 11.542
4 Cement Plaster (1:4)
on rough side (15 mm) M² 370.5 6.52 4.979
on fair side (15 mm) M² 481.36 8.4 6.469
Total Qnty in dry volume 88.072 14.97 7.07
Cement Reinforcement
Sl. No. Item of works No L B H Qtty Qtty Sand m³ Agg. m³ MB No Remarks
bags Qtl
1 PCC M-15 (1:1.5:3) 4 2.20 2.20 0.10 1.94 2.98 11.64 0.812 1.620 58 For convert the wet
volume to dry
2 RCC M-25 (1:1:2) volume it is reuired
4 2.20 2.20 0.45 8.712 13.41 73.09 3.350 6.700 to multiply with 1.54
4 2.50 0.40 0.40 1.60 2.46 13.42 0.610 1.230
4 3.05 0.25 0.45 1.37 2.10 11.49 0.520 1.050
3 Reinforcement
Foundation (12mmØ) 4 30 2.30 276.00RM 0.617 kg/m 1.7
chair (12mmØ) 4 22 2.30 202.40 RM 0.617 kg/m 1.25
Column (20mmØ) 4 12 2.65 127.20 RM 1.58kg/m 2
Tai Beam (16mmØ) 1 8 3.90 124.80 RM 1.58kg/m 1.97
Stirupps (8mmØ)
Column 4 17 1.64 111.52 RM 0.39 kg/m 0.44
Beam 4 24 1.30 124.80RM 0.39 kg/m 0.48
Total 109.64 7.84
10% w + 0.784
Total Qnty in dry volume 110 bags 5.292 10.06 8.624
Cement
Sl. No. Item of works Qtty Sand m³ Agg. m³ Remarks
bags
1 PCC M-15 (1:1.5:3) 0.78 m³ 4.68 0.035 0.425 For convert the wet volume
to dry volume it is reuired to
2 RCC M-25 (1:1:2) 3.71 m³ 31.12 0.925 1.850 multiply with 1.54