Software Engineering Imp Questions
Software Engineering Imp Questions
**
2. Explain with example Decision table…….Prepare decision table for accessing secured
network*
3. Explain following elements of management spectrum: (i) People (ii) Process (iii) Product (iv)
Project………….Describe 4 ‘P’s of management spectrum giving their significance……….Explain
the following 4P’s management spectrum.***
4. List and explain basic principles of project scheduling…………….State and describe any four
basic project scheduling principles.***
5. Distinguish between perspective process model and agile process model.*
6. Describe any four principles of communication for software engineering………….State and
describe any six communication principles.**
7. Draw proper labeled “LEVEL I Data Flow Diagram” (DFD) for student attendance system.
8. State importance of “Function Point (FP)” and “Lines of codes (LOC)” in concerned with
project estimation……….With an example, explain Line of Code (LOC) based estimation.*
9. Describe extreme programming with proper diagram.*
10. List and explain any “four core principles” of software engineering……..Enlist core principles
of Software engineering practice.****
11. Explain RMMM plan with example………Describe RMMM Strategy.****
12. Explain any one project cost estimation approach……………..Describe the Analytical method
of project cost estimation with example……….Describe following project cost estimation
approaches. i) Heuristic ii) Empirical iii) Analytical Empirical……………….Explain Heuristic
method of cost estimation approach.****
13. Prepare time line chart for Library Managements System (five days a week) Consider phases
of SDLC……………..Prepare Macro Timeline chart for 20 days of Hotel Management system (6
days a week) consider broad phase of SDLC.*
14. Differentiate between White box and Black box testing (any six points)……………. Explain the
concept of Black box testing and white box testing.****
15. Describe CMMI. Give significance of each level…………….Explain CMMI in detail with neat
diagram.**
16. Identify and enlist requirement for given modules of employee management software: (i) (ii)
Employee detail Employee salary (iii) Employee performance.*
17. Explain the notations used for preparing a Data Flow diagram.*
18. Explain process framework with a suitable diagram……………Explain software process
framework with neat labelled diagram and also describe software process framework
activities.*
19. Explain waterfall process model. State its advantages and disadvantages…………Explain
Waterfall Model with neat labelled diagram.*
20. Explain GANTT chart and its application for project tracking with an example……………Prepare
Gantt chart for hostel management system. (Five days a week). consider phases of SDLC.**
21. Sketch a use case diagram for library management system with minimum four use cases and
two actors*………………Draw DFD 0 and DFD 1 diagram for Library Management
System……………Draw use-case diagram for ATM system with minimum four use cases and
two actors.***
22. Calculate using COCOMO model (i) Effort (ii) Project duration (iii) Average staff size if
estimated size of project is 200 KLOC using organic mode………………Use COCOMO model to
calculate. i) Effort ii) iii) iv) Development Time Average staff size Productivity if estimated
size of project is 400 KLOC using embedded mode…………..Use COCOMO model to calculate i)
Effort ii) Development time if estimated size of project is 500 KLOC using organic, semi-
detached, and Embedded mode.**
23. State and describe two metrics of project size estimation…………State project size estimation
techniques and explain any one.……….. Explain line of code metrics for size estimation **
24. Draw and explain translating requirement model into design model.*
25. Describe six Sigma Strategy in details…………..Describe six sigma and state the phases of
DMAIC and DMADV.*
26. Describe a cocomo and cocomo-II models*