JSOL-JSA- HOT WORK

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

CITIART

PVT.LTD Jindal Steel & Power Limited


(Occupational Health & Safety Department)

JANUARY 2024 Job Safety Analysis

Format: Job Safety Analysis (JSA)

JSA Ref No: JSOL/CPL/JSA-05 Rev No: 00 Date: January 2024


Unit: SMS-2 (BOF-CASTER) Plant: JSPL-ANGUL Section:

Description of Activity: Excavation, PCC & RCC, Steel Reinforcement work

S.No. Job Activity Hazards/Risk Safety Control Measures

 Toolbox talk is to be
conducted on daily basis
regarding the job to be
executed & associated
hazards.

 Work permits are to be


Daily Tool Box
availed from respective
Talk & issue of
control rooms before
work permits
1. commencement of job & to
(Permit from
be closed after completion of
Operation Dept.
job.
if applicable)
 Strict supervision is to be
ensured by JSPL Site
Engineer & Agency
Supervisor for proper
communication between
persons at height & ground

 Only inducted worker shall be


deputed at the work place.
 Medical check-up should be done
 Physical hazard before start work
Manpower  Personal Injury
2. Mobilization

CITIART PVT.LTD Rev 00 / January 2024 Page 1 of 4


Medical check-up should be
done before start work

3.

 Given tool box talk to all


workers


4.

CITIART PVT.LTD Rev 00 / January 2024 Page 2 of 4


 Work should carry under
supervision

5.

 Safety induction should be


given to all workers


6.

 Gate passes & required PPE’S.


Safety helmet, safety shoes,
reflective jacket, hand gloves,
7.  safety goggle etc. Must be
provided

CITIART PVT.LTD Rev 00 / January 2024 Page 3 of 4


Prepared By:

Name: ___________________ Designation: ____________ Signature:_______________ Date: ___________

Reviewed By:

Name: ___________________ Designation: ____________ Signature:_______________ Date: ___________

Approved By:

Name: ___________________ Designation: ____________ Signature:_______________ Date: ___________

CITIART PVT.LTD Rev 00 / January 2024 Page 4 of 4