Cladding 2
Cladding 2
150
50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
150
150
PERSPECTIVE
150
150
A B C D E
1370 1500 1500 1465
150
150
1
150
560
HORIZONTAL
150
PLATE SUPPORT OWNER:
150
BOLTED ON RC WALL
1993
150
4690
1500
150
3
75X125x6MM EXISTING LOUVER 3.1
150
HORIZONTAL TUBULAR
BOLTED AT THE R.C WALL PLANTERS
150
ARCHITECTURAL CONSULTANT:
150
1116
150
2
150
REG. NO.
TIN NO.
150
PTR
1500 1500 1500 1537 DATE
150
PLACE
6130
A Y
150
STRUCTURAL CONSULTANT:
PLANTERS V E W
D R I
150
3
2.1
REG. NO.
A Y TIN NO.
V E W PTR
D R I 3.1
DATE
PLACE
PLUMBING & SANITARY CONSULTANT:
610
(BLACK SLATE VENEER) +30 +30
APPROVED MATERIAL PROJECT MANAGER.
AS PER ORTIGAS CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP
AREA (BLACK) = 59.76 m² DRAWINGS TO ARCHITECT PRIOR TO COMMENCEMENT
490
600 x 1200 = 83pcs +15 OF WORKS.
600
1 % SLOPE 75
+30 REPRODUCED WITHOUT WRITTEN CONSENT.
PURPOSE OF ISSUANCE :
+30 +30
50
580
3x5x6m
BUILDING PERMIT
150
30 TUBULAR
FRAME +15
200
50
ISSUED DATE
4690
590
+30 DOCUMENT TYPE :
150
EIFS
ARCHITECTURAL DRAWING
50
490
STONE VENEER FINISH
WITH GROOVED PATTERN ON EIFS BACKING +30 +15
150
(BY EUROASIA)
+15
448 152
REVISIONS/REMARKS :
50
+30
6mm
FICEM 150
+30
580
50
+15
2 LAYER 150mm CHB w/
CHB REINFORCEMENT
+15 PURPOSE OF ISSUANCE :
SCALE :
150
<<< 5200
RECEIVED/
CHECKED BY:
ISSUED DATE
SECTION DETAIL
5 P E R S P E C T I V E 4 SECTION DETAIL 3 ELEVATION SHEET CONTENT : PROJ. NO. :
SHEET NO. :