2523-R0-ENGINEERING_LAYOUT_OF_REFINERY-Model
2523-R0-ENGINEERING_LAYOUT_OF_REFINERY-Model
2523-R0-ENGINEERING_LAYOUT_OF_REFINERY-Model
MELT
CLARIFIER
PLATFORM FOR MELT DBF-01 DBF-02 CHECK FILTER
CLARIFIER & DBF DRAIN DBF-01 DBF-02
VALVES OPERATING BACK WASH BACK WASH
TANK TANK
REACTION TANK
C.P.D.T. PH.D.T.
SWEET / HOT NEW PANEL & CONTROL
WATER CONTROL ROOM
TANK DCH ROOM(MELT
CLARIFICATION)
C.P.P.T. PH.P.T.
DCH
REFINERY EQUIPMENTS PLAN AT FFL 0.00 M LVL. REFINERY EQUIPMENTS PLAN AT +6.0 M LVL. REFINERY EQUIPMENTS PLAN AT +09.00 M LVL. REFINERY EQUIPMENTS PLAN AT +12.8 M LVL.
REACTION
TANK COLOUR PPT PHOSPHORIC
PREPARATION ACID
TANK PREPARATION
TANK
CHECK FILTER
DCH
DBF-01/02
BACK WASH
TANK
SWEET / HOT
WATER
MELT VIBRO MELT VIBRO MELT VIBRO MELT VIBRO MELT VIBRO TANK
SCREEN SCREEN SCREEN SCREEN SCREEN
SWEET WATER
TANK
SCUM
HOLDING
TANK
G.L. G.L.
DCH
DCH
CHECK FILTER
DBF-01 DBF-02
BACK WASH BACK WASH
TANK TANK
MELT VIBRO
SCREEN
SCUM
HOLDING
TANK
M-1823
G.L. G.L. G.L. G.L. G.L. G.L.
G.L. G.L.