Building Works
Building Works
3 Cut down trees (girth over 500mm) and cart away from site no. 7,300 33,900
5 Excavate in bulk starting from stripped level and deposit in m³ 320 670
temporary spoil heaps
7 Allow for removal and disposal of ground water by pumping, day 4,450 4,650
bailing or other means (24-hour operation)
9 Backfilling with selected fill obtained from spoil heaps m³ 200 235
13 UV resistant plastic sheeting 250 microns with dual function as m² N/A 175
damp proof membrane and anti-termite physico-chemical
barrier
15 Allow for temporary support to existing structures not exceeding m 550 645
2000mm high
16 Excavate preliminary trench starting from stripped level and m³ 290 730
deposit in temporary spoil heaps
1 of 4
Work Items (Range of
SN Description of Work Items Unit Rates) (MUR)
From To
3 Site-mixed reinforced concrete
Grade 25 m³ 4,740 5,450
Grade 30 m³ 4,900 5,620
11 Deep saw cut joints 8mm x 40mm in floor slab and filling with m 420 425
polysulphide sealant
2 of 4
Work Items (Range of
SN Description of Work Items Unit Rates) (MUR)
From To
C Plastering
1 Cement and sand (1:4) render mixed with an approved
plasticiser laid on concrete or blockwall surfaces.
12mm thick to walls internally with sponge finish m² 315 395
12mm thick to reveals of openings with sponge finish m² 350 445
12mm thick to walls finished to receive tiles m² 290 365
20mm thick to walls externally in two coats with sponge finish m² 500 620
12mm render to soffit of suspended slab m² 440 590
D Waterproofing Works
1 Bituminous waterproofing membrane with pebble finish m² N/A 525
E Openings
1 Powder coated aluminium windows
Window overall size 600 x 600mm no. N/A 4,000
Window overall size 1200 x 1200mm no. N/A 10,000
Window overall size 1500 x 1500mm no. N/A 13,500
2 Screed (ranging from 20mm to 40mm thick) laid on concrete m² 375 465
floor and finished to receive ceramic tiles
3 Supply and lay ceramic tiles (assumed supply rate of Rs 500/m²) m² 1,115 1,225
with adhesive.
G Painting Works
1 Prepare and apply one undercoat and two finishing coats of m² N/A 130
paint on walls, beams, and the like
3 of 4
Work Items (Range of
SN Description of Work Items Unit Rates) (MUR)
From To
1 Supply and fix the following sanitary appliances complete with
pipes, fittings, etc.
W.C. suite (supply rate Rs 5,000/set) no. 7,500 7,700
Wash hand basin (supply rate Rs 7,500/set) no. 9,550 10,000
Urinal (supply rate Rs 4,000/set) no. 5,340 5,600
Stainless steel sink (Rs 4,500/set) no. 5,360 7,000
Shower tray (Rs 6,000/set) no. 8,000 8,500
Bath tub (Rs 20,000/set) no. 25,000 35,000
Shower screen no. 13,000 25,000
2 Supply and fix sanitary accessories such as floor drain, toilet sum 15,000 N/A
paper holder, soap holder, soap dispenser, towel rail, hand dryer
and mirror.
I Drainage Works
1 Rocksand 0-6mm (laid and compacted in layers) in bed and m³ 2,250 2,350
surround to pipe, septic tank and grease trap
4 Supply and fix heavy duty cast iron manhole cover and frame
600 x 600mm cover to manhole No. 8,100 8,200
450 x 450mm cover to catchpit No. 4,500 4,625
5 Supply and fix metal grating and frame - 300 x 500mm cover to No. 3,820 3,950
catchpit
4 of 4