Reliance Resources LTD
Reliance Resources LTD
Reliance Resources LTD
http://www.relianceresources.com/s/NewsReleases.asp?printVer...
The other vein systems at Tanoyan include, the Modupola-Talong and Lingkobungon Vein
1 of 5 23/02/2012 11:10 AM
http://www.relianceresources.com/s/NewsReleases.asp?printVer...
systems, (Inset B) http://www.goldenpeaks.com/i/misc/Modulopa-and-Talong-drill-map.jpg); They have also provided significant intersections (TND076: 17.65m @ 3.8 g/t Au and TND056: 16.45m @ 2.0 g/t Au). In addition to following up extensions along strike and down-dip to known mineralisation at Sondana and additional drilling at the Talong-Modupola and Lingkobungon vein systems, Phase 2 drilling will also target the Ramai Vein located 700 metres west of Sondana (Figure 1). This 1.7Km long Ramai Vein has only been tested by 6 historical drillholes, several of which intersected significant gold mineralisation such as TND037: 7m @ 5.3 g/t Au and 2m @ 5.2 g/t Au and TND018: 16m @ 0.6 g/t Au. The continuous nature of the Ramai Vein as seen on surface suggests it has similarities with the Sondana Vein. President Scott Emerson commented: "The Phase 1 drilling program has been a significant step in advancing the Tanoyan Gold Project and drilling has provided consistently strong results throughout the program. We are looking forward to having the same success during the next Phase 2, 10,000 meter drill program which is aimed at further gold discovery and the delineation of a mineral resource sufficient to form the basis of, eventually, a large mining and milling operation. " The company has a portfolio of five mineral tenements covering 68,000 acres on the islands of Sulawesi and Halmahera in East Indonesia. The company is active on three of its five Indonesian gold projects; currently preparing for Phase 2 drilling on the Tanoyan Gold Project and conducting surface exploration programs, in preparation for drilling, on the Kapa Kapa Gold Project and the Roko Gold Project. All of the projects have easy access via paved and/or gravel roads and the regional infrastructure is good The projects offer both exploration potential and an existing resource base. All five projects are adjacent to or along strike from operating gold mines or identified gold resources with similar geology and structural feature. Importantly, all projects have been converted to IUP tenements as required under the new Indonesian Mining Act (2009). All samples were assayed by Intertek Indonesia; a division of the global Intertek Group PLC. Core is collected and initially logged at Tanoyan Base Camp at the project area. The core is then securely transported in closed core boxes to Golden Peaks' Exploration Office in Kotamobagu, North Sulawesi. Here the core is logged in detail, cut longitudinally into 2 equal halves and half-core is sampled at 1 meter intervals; except where the geology dictates a lesser sampling interval. Half core is permanently retained, as a reference, in the secure Kotamobagu core-storage facility. All QC samples are introduced before the bagged samples are trucked to PT Intertek Laboratory's sample preparation facility in Manado. Prepared samples are then couriered by PT Intertek to their analytical facility in Jakarta for analyses. Gold is fire assayed using a 50.0 gram aliquot sample with an AA finish. Multi-element analysis is by Four Acid Digestion using an Induced Coupled Plasma (ICP) finish. The Company's QA/QC program now includes the regular insertion of blanks, multiple certified assay standards into the sample shipments. Locally-sourced blank samples are inserted in every assay batch of 10 samples. Commercial standards are inserted in every assay batch of 25 samples. Sludge samples are also collected and assayed on a 1 metre interval from the drilling fluid circulation return. Regular monitoring of these QC samples is
2 of 5
23/02/2012 11:10 AM
http://www.relianceresources.com/s/NewsReleases.asp?printVer...
a critical part of Golden Peak's QA/QC protocols. This press release has been reviewed and approved by Mr. John Levings, B.Sc., FAusIMM, director of Golden Peaks Resources Limited and a Qualified Person as defined by National Instrument 43-101, under whose direction the exploration programs are being carried out. Media Information, contact: Scott Emerson, President se@relianceresources.com Investor Information, contact: Mike Kordysz mk@relianceresources.com The statements herein that are not historical facts are forward-looking statements. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in the company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement. Table 2: Phase 1 Drill Results DH No. TND045 Vein Sondana incl TND046 TND047 TND048 TND049 Sondana Sondana Sondana Sondana Sondana Sondana TND050 Sondana incl and TND051 TND052 TND053 TND054-R TND055 TND056 Sondana Modupola Sondana Sondana Modupola Modupola incl incl From (m) 0.00 4.10 77.00 To (m) 16.10 4.90 78.00 Interval (m) 16.10 0.80 1.00 Au (g/t) 0.8 4.3 0.7
did not effectively test Sondana vein 44.20 10.93 132.10 144.50 55.60 63.00 69.10 14.60 44.10 18.00 49.30 49.20 30.70 134.50 145.40 71.10 63.90 70.10 22.30 45.10 30.30 50.50 5.00 19.77 2.40 0.90 15.50 0.90 1.00 7.70 1.00 12.30 1.20 2.9 1.6 0.9 0.9 3.1 12.4 23.2 0.9 1.7 1.7 1.5
did not effectively test Sondana vein 73.90 73.90 73.90 90.35 83.30 78.50 16.45 9.40 4.60 2.0 3.1 5.7
3 of 5
23/02/2012 11:10 AM
http://www.relianceresources.com/s/NewsReleases.asp?printVer...
113.45 TND057 TND058 TND059 TND060 TND061 Sondana Modupola Sondana Modupola Sondana incl incl TND062 TND063 Modupola Sondana incl 60.30 60.30 74.75 40.90 17.30 22.30 27.60 TND064 Modupola 79.25 86.50 138.30 TND065 TND066 Sondana Modupola incl TND067 TND068 TND069 TND070 Sondana Modupola Sondana Modupola incl incl TND071 TND072 TND073 Sondana Modupola Sondana 126.10 124.75 137.80
no significant intersections 79.65 65.70 79.65 44.90 24.60 23.60 28.60 81.35 90.75 139.30 19.35 5.40 4.90 4.00 7.30 1.30 1.00 2.10 4.25 1.00 0.9 1.4 1.6 0.8 7.2 38.2 0.9 8.7 0.9 1.0
did not effectively test Sondana vein 29.70 40.00 10.55 77.70 11.20 51.10 51.10 62.20 14.65 57.15 149.00 171.20 178.00 43.55 41.90 11.55 79.10 13.50 65.00 55.95 64.00 15.90 58.55 159.70 172.20 183.30 67.10 87.80 107.00 8.50 81.30 115.05 13.85 1.90 1.00 1.40 2.30 13.90 4.85 1.80 1.25 1.40 10.70 1.00 5.30 3.80 9.60 6.60 4.00 2.00 18.85 1.0 3.5 0.4 2.3 0.5 0.8 1.0 2.4 0.4 1.0 1.6 0.6 0.5 0.5 1.1 1.3 1.8 1.5 4.4
TND074
Modupola
TND075
Sondana
4 of 5
23/02/2012 11:10 AM
http://www.relianceresources.com/s/NewsReleases.asp?printVer...
100.25 87.50 87.50 64.50 144.00 129.00 13.70 24.35 31.50 112.60 110.60
2.00 17.65 6.40 1.00 72.00 12.90 2.00 4.65 2.60 32.10 5.10
33.0 3.8 7.8 1.9 1.0 2.4 1.4 1.5 0.9 2.1 4.6
TND079
Sondana incl
80.50 105.50
no significant intersections 31.40 31.55 36.1 63.75 35.40 36.9 36.9 64.9 52.40 58.40 4.00 5.35 0.80 1.15 14.95 3.00 1.4 2.0 8.8 1.2 0.8 0.5
TND087
Sondana
37.45 55.40
Drill hole data for the holes reflect down hole core lengths. True widths cannot be reliably estimated at this time Copyright 2012 by Reliance Resources Ltd. All rights reserved worldwide. For more information, send questions and comments to info@goldenpeaks.com This page was created on Wed Feb 22, 2012 at 7:09:29 PM Pacific Time.
5 of 5
23/02/2012 11:10 AM