Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
23 views

Software Testing Methodologies

The document outlines the curriculum for a B.Tech course in Software Testing Methodologies at Malla Reddy College of Engineering & Technology, focusing on various testing strategies and methodologies. It includes course objectives, unit topics, and a detailed Software Testing Life Cycle (STLC) process. The document emphasizes the importance of quality assurance in software development and provides insights into different testing approaches such as the Waterfall and Agile methodologies.

Uploaded by

Sree Latha
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Software Testing Methodologies

The document outlines the curriculum for a B.Tech course in Software Testing Methodologies at Malla Reddy College of Engineering & Technology, focusing on various testing strategies and methodologies. It includes course objectives, unit topics, and a detailed Software Testing Life Cycle (STLC) process. The document emphasizes the importance of quality assurance in software development and provides insights into different testing approaches such as the Waterfall and Agile methodologies.

Uploaded by

Sree Latha
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 136

B.

Tech – CSE (Emerging Technologie s) R-20

MRCET CAMPUS (AUTONOMOUS INSTITUTION – UGC, GOVT. OF INDIA)

Department of CSE
(Emerging Technologies)
(Cyber Security)
B.TECH(R-20 Regulation)
(III YEAR – II SEM)
(2022-23)

SOFTWARE TESTING METHODOLOGIES


(R20A0523)
LECTURE NOTES
Prepared by
Mahendar J, Asst.Prof.
MALLA REDDY COLLEGE OF ENGINEERING & TECHNOLOGY
(Autonomous Institution – UGC, Govt. of India)

STM
B.Tech – CSE (Emerging Technologies) R-20

Recognized under 2(f) and 12(B) of UGC ACT 1956


(Affiliated to JNTUH, Hyderabad, Approved by AICTE-Accredited by NBA & NAAC – ‘A’ Grade - ISO 9001:2015 Certified)
Maisammaguda, Dhulapally (Post Via. Hakimpet), Secunderabad–500100, Telangana State, India

Department of Computer Science and Engineering

EMERGING TECHNOLOGIES

Vision

 “To be at the forefront of Emerging Technologies and to evolve as a Centre of Excellence


in Research, Learning and Consultancy to foster the students into globally competent
professionals useful to the Society.”

Mission
The department of CSE (Emerging Technologies) is committed to:

 To offer highest Professional and Academic Standards in terms of Personal growth and
satisfaction.
 Make the society as the hub of emerging technologies and thereby capture
opportunities in new age technologies.
 To create a benchmark in the areas of Research, Education and Public Outreach.

 To provide students a platform where independent learning and scientific study are
encouraged with emphasis on latest engineering techniques.

QUALITY POLICY
 To pursue continual improvement of teaching learning process of Undergraduate and
Post Graduate programs in Engineering & Management vigorously.

 Toprovidestateofartinfrastructureandexpertisetoimpartthequalityeducation and
research environment to students for complete learning experiences.

 Developing students with a disciplined and integrated personality.

 To offer quality relevant and cost effective programmes to produce engineers as per
requirements of the industry need.

Formoreinformation:www.mrcet.ac.in

STM
MALLA REDDY COLLEGE OF ENGINEERING AND TECHNOLOGY
III Year B.Tech. CSE (CyS)- II Sem L/T/P/C
3 -/-/3
Open Elective –IV
(R20A0523) Software Testing Methodologies
COURSE OBJECTIVES:
This course will enable the students:
1. To understand the purpose of testing and its methodology.
2. To learn the process of path and flow testing using flow graphs.
3. To know the applications of Data flow and Domain testing
4. To learn the concept of logic testing and state graphs
5. To learn and understand the tools and techniques of software testing and its practice in
the industry.

UNIT I
Introduction: Purpose of testing, Software Testing Life Cycle, Software Testing Methodology,
Dichotomies, model for testing, consequences of bugs, taxonomy of bugs
UNIT II
Flow graphs and Path testing: Basics concepts of path testing, predicates, path predicates and
achievable paths, path sensitizing, path instrumentation, application of path testing.
Transaction Flow Testing: Transaction flows, transaction flow testing techniques
UNIT III
Dataflow testing: Basics of dataflow testing, strategies in dataflow testing, application of
dataflow testing. Domain Testing:-domains and paths, Nice & ugly domains, domain testing,
domains and interfaces testing, domain and interface testing, domains and testability.

UNIT IV
Paths, Path products and Regular expressions: Path products & path expression, reduction
procedure, applications, regular expressions & flow anomaly detection.
Logic Based Testing: Overview, decision tables, path expressions, kv charts, specifications.
UNIT V
State, State Graphs and Transition Testing: State graphs, good & bad state graphs, state
testing, Testability tips. Graph Matrices and Application: Motivational overview, matrix of
graph, relations, power of a matrix, node reduction algorithm, Automation and testing tools:
Need for Automation, Categorization of testing tools, Overview of Tools like Win Runner,
LoadRunner, Jmeter,JUnit.

TEXT BOOKS:
1. Software Testing techniques - Boris Beizer, Dreamtech, second edition.
2. Software Testing Tools – Dr.K.V.K.K.Prasad, Dreamtech.
REFERENCE BOOKS:
1. The craft of software testing - Brian Marick, Pearson Education.
2. Software Testing Techniques – SPD(Oreille)
3. Software Testing in the Real World – Edward Kit, Pearson.
4. Effective methods of Software Testing, Perry, John Wiley.
5. Art of Software Testing – Meyers, John Wiley.

COURSE OUTCOMES:
Students will be able to:
1. To compare and contrast the various testing strategies
2. To apply Path and transaction flow testing
3. To analyze the various domains and interfaces and test them.
4. To detect anomalies and build decision tables and KV charts.
5. To select an appropriate testing tool for a given application.
INDEX

S.No. Unit Topic Name Pg.No.


1. Introduction: Purpose of testing 1
2. Software Testing Life Cycle 3
3. I Software Testing Methodology 5
4. Dichotomies, Model for Testing, 8
5. Consequences of Bugs, Taxonomy of Bugs 12
6. Flow graphs and Path testing 20
II
7. Transaction Flow Testing 34
II

8. Dataflow Testing 38
III
9. Domain Testing 51
10. Paths, Path products and Regular expressions 69
IV
11. Logic Based Testing 93
12. State, State Graphs and Transition testing 107
13. Graph Matrices and Applications 113
V
14. Automation and testing tools 119

15. Performance testing tools, Load Runner, 123


JMeter, JUnit
MALLA REDDY COLLEGE OF ENGINEERING & TECHNOLOGY DEPARTMENT
OF INFORMATION TECHNOLOGY

UNIT- I
INTRODUCTION
Testing:

Testing is the process of exercising or evaluating a system or system components by manual or


automated means to verify that it satisfies specified requirements.

The Purpose of Testing:

Testing consumes at least half of the time and work required to produce a functional program.
o MYTH: Good programmers write code without bugs. (It’s wrong!!!)
o History says that even well written programs still have 1-3 bugs per hundred statements.

Productivity and Quality in Software:

o In production of consumer goods and other products, every manufacturing stage is subjected
to quality control and testing from component to final stage.
o If flaws are discovered at any stage, the product is either discarded or cycled back for rework
and correction.
o Productivity is measured by the sum of the costs of the material, the rework, and the discarded
components, and the cost of quality assurance and testing.
o There is a tradeoff between quality assurance costs and manufacturing costs: If sufficient time
is not spent in quality assurance, the reject rate will be high and so will be the net cost. If
inspection is good and all errors are caught as they occur, inspection costs will dominate, and
again the net cost will suffer.
o Testing and Quality assurance costs for 'manufactured' items can be as low as 2% in consumer
products or as high as 80% in products such as space-ships, nuclear reactors, and aircrafts,
where failures threaten life. Whereas the manufacturing cost of software is trivial.
o The biggest part of software cost is the cost of bugs: the cost of detecting them, the cost of
correcting them, the cost of designing tests that discover them, and the cost of running those
tests.
o For software, quality and productivity are indistinguishable because the cost of a software
copy is trivial.
o Testing and Test Design are parts of quality assurance should also focus on bug prevention. A
prevented bug is better than a detected and corrected bug.

1
Phases in a tester's mental life:

Phases in a tester's mental life can be categorized into the following 5 phases:

1. Phase 0: (Until 1956: Debugging Oriented) There is no difference between testing and
debugging. Phase thinking was the norm in early days of software development till testing
emerged as a discipline.
2. Phase 1: (1957-1978: Demonstration Oriented) the purpose of testing here is to show that
software works. Highlighted during the late 1970s. This failed because the probability of showing
that software works 'decreases' as testing increases. I.e. the more you test, the more likely you will
find a bug.
3. Phase 2: (1979-1982: Destruction Oriented) the purpose of testing is to show that software
doesn’t work. This also failed because the software will never get released as you will find one
bug or the other. Also, a bug corrected may also lead to another bug.
4. Phase 3: (1983-1987: Evaluation Oriented) the purpose of testing is not to prove anything but to
reduce the perceived risk of not working to an acceptable value (Statistical Quality Control).
Notion is that testing does improve the product to the extent that testing catches bugs and to the
extent that those bugs are fixed. The product is released when the confidence on that product is
high enough. (Note: This is applied to large software products with millions of code and years of
use.)
5. Phase 4: (1988-2000: Prevention Oriented) Testability is the factor considered here. One reason
is to reduce the labor of testing. Other reason is to check the testable and non-testable code.
Testable code has fewer bugs than the code that's hard to test. Identifying the testing techniques to
test the code is the main key here.

Test Design:

We know that the software code must be designed and tested, but many appear to be unaware that tests
themselves must be designed and tested. Tests should be properly designed and tested before applying
it to the actual code.

Testing isn’t everything:

There are approaches other than testing to create better software. Methods other than testing include:

1. Inspection Methods: Methods like walkthroughs, desk checking, formal inspections and code
reading appear to be as effective as testing but the bugs caught don’t completely overlap.
2. Design Style: While designing the software itself, adopting stylistic objectives such as
testability, openness and clarity can do much to prevent bugs.
3. Static Analysis Methods: Includes formal analysis of source code during compilation. In
earlier days, it is a routine job of the programmer to do that. Now, the compilers have taken
over that job.
4. Languages: The source language can help reduce certain kinds of bugs. Programmers find
new bugs while using new languages.

2
5. Development Methodologies and Development Environment: The development process
and the environment in which that methodology is embedded can prevent many kinds of
bugs.

Software Testing Life Cycle (STLC):


Software Testing Life Cycle (STLC) is a sequence of specific activities conducted during the testing process
to ensure software quality goals are met. STLC involves both verification and validation activities.
Contrary to popular belief, Software Testing is not just a single/isolate activity, i.e. testing. It consists of a
series of activities carried out methodologically to help certify your software product. STLC stands for
Software Testing Life Cycle.

Characteristics of STLC:
 STLC is a fundamental part of Software Development Life Cycle (SDLC) but STLC consists
of only the testing phases.
 STLC starts as soon as requirements are defined or software requirement document is
shared by stakeholders.
 STLC yields a step-by-step process to ensure quality software.

Fig 1.1 Phases of Software Testing Life Cycle

1. Requirement Analysis:
Requirement Analysis is the first step of Software Testing Life Cycle (STLC). In this phase quality
assurance team understands the requirements like what is to be tested. If anything is missing or not
understandable then quality assurance team meets with the stakeholders to better understand the detail
knowledge of requirement.

2. Test Planning:
Test Planning is most efficient phase of software testing life cycle where all testing plans are defined.
In this phase manager of the testing team calculates estimated effort and cost for the testing work. This phase
gets started once the requirement gathering phase is completed.

3
3. Test Case Development:
The test case development phase gets started once the test planning phase is completed. In this
phase testing team note down the detailed test cases. Testing team also prepare the required test data
for the testing. When the test cases are prepared then they are reviewed by quality assurance team.

4. Test Environment Setup:


Test environment setup is the vital part of the STLC. Basically test environment decides the conditions
on which software is tested. This is independent activity and can be started along with test case
development. In this process the testing team is not involved. either the developer or the customer creates
the testing environment.

5. Test Execution:
After the test case development and test environment setup test execution phase gets started. In
this phase testing team start executing test cases based on prepared test cases in the earlier step.

6. Test Closure:
This is the last stage of STLC in which the process of testing is analyzed.

4
Software Testing Methodology:
Software Testing Methodology is defined as strategies and testing types used to certify that the
Application Under Test meets client expectations. Test Methodologies include functional and
non-functional testing to validate the AUT. Examples of Testing Methodologies are Unit Testing,
Integration Testing, System Testing, Performance Testing etc. Each testing methodology has a defined
test objective, test strategy, and deliverables.

Automated Ultrasonic Testing:


Automated Ultrasonic Testing (AUT) covers a range of ultrasonic inspection techniques using
powered, mechanical scanners. Although often used to describe corrosion mapping, AUT encompasses
pulse-echo weld inspection, phased array and Time Of Flight Diffraction.

Waterfall model:

Fig 1.2 Waterfall Model

The waterfall model, software development progress through various phases like Requirements
Analysis, Design etc – sequentially.
In this model, the next phase begins only when the earlier phase is completed.

The Testing Approach:

The first phase in the waterfall model is the requirements phase in which all the project requirements
are completely defined before starting the testing. During this phase, the test team brainstorms the
scope of testing, test strategy and drafts a detailed test plan.

Only once the design of software is complete, the team will move on to execution of the test cases to
ensure that the developed software behaves as it expected.

In this methodology, the testing team proceeds to the next phase only when the previous phase is
completed.

5
Advantages:

This software Engineering model is very simple to plan and manage. Hence, projects, where requirements
are clearly defined and stated beforehand, can be easily tested using a waterfall model.

Disadvantages:

In the waterfall model, you can begin with the next phase only once the previous phase is completed.
Hence, this model cannot accommodate unplanned events and uncertainty.

This methodology is not suitable for projects where the requirements change frequently.

Iterative development:
In this model, a big project is divided into small parts, and each part is subjected to multiple iterations
of the waterfall model. At the end of an iteration, a new module is developed or an existing module
is enhanced. This module is integrated into the software architecture and the entire system is tested all
together.

Fig.1.3 Iterative model


The testing Approach:
As soon as iteration is completed, the entire system is subjected to testing. Feedback from testing is
immediately available and is incorporated in the next cycle. The testing time required in successive iteration
can be reduced based on the experience gained from past iterations.

Advantages:

The main advantage of iterative development is the test feedback is immediately available at the end of each
cycle.

Disadvantages:

This model increases communication overheads significantly since, at the end of each cycle, feedback about
deliverables, effort etc must be given.

6
Agile methodology :

Traditional software development methodologies work on the premise that software requirements remain
constant throughout the project. But with an increase in complexity, the requirements undergo
numerous changes and continuously evolve. At times, the customer himself is not sure what he wants.
Though the iterative model addresses this issue, it’s still based on the waterfall model.

In Agile methodology, software is developed in incremental, rapid cycles. Interactions amongst customers,
developers and client are emphasized rather than processes and tools. The agile methodology focuses
on responding to change rather than extensive planning.

Fig 1.4 Agile Methodologies

Incremental testing is used in agile development methods and hence, every release of the project is tested
thoroughly. This ensures that any bugs in the system are fixed before the next release.

Advantages:

It is possible to make changes in the project at any time to comply with the requirements.
This incremental testing minimizes risks.

Disadvantages:

Constant client interaction means added time pressure on all stakeholders including the client themselves,
software development and test teams.

7
Dichotomies:

 Testing Versus Debugging:


Many people consider both as same. Purpose of testing is to show that a program has bugs.
The purpose of testing is to find the error or misconception that led to the program's failure and
to design and implement the program changes that correct the error.
Debugging usually follows testing, but they differ as to goals, methods and most important
psychology. The below tab le shows few important differences between testing and debugging.

Testing Debugging
Testing starts with known conditions, Debugging starts from possibly unknown
uses predefined procedures and has initial conditions and the end cannot be
predictable outcomes. predicted except statistically.
Testing can and should be planned, Procedure and duration of debugging cannot
designed and scheduled. be so constrained.
Testing is a demonstration of error or
Debugging is a deductive process.
apparent correctness.
Debugging is the programmer's vindication
Testing proves a programmer's failure.
(Justification).
Testing, as executes, should strive to be
Debugging demands intuitive leaps,
predictable, dull, constrained, rigid and
experimentation and freedom.
inhuman.
Much testing can be done without Debugging is impossible without detailed
design knowledge. design knowledge.
Testing can often be done by
Debugging must be done by an insider.
an outsider.
Much of test execution and design can
Automated debugging is still a dream.
be automated.

 Function versus Structure:

o Tests can be designed from a functional or a structural point of view.


o In Functional testing, the program or system is treated as a black box. It is subjected to inputs,
and its outputs are verified for conformance to specified behavior. Functional testing takes the user
point of view- bother about functionality and features and not the program's implementation.

8
o In Structural testing does look at the implementation details. Things such as programming
style, control method, source language, database design, and coding details dominate structural
testing.
o Both Structural and functional tests are useful, both have limitations, and both target different
kinds of bugs. Functional tests can detect all bugs but would take infinite time to do so. Structural
tests are inherently finite but cannot detect all errors even if completely executed.

 Designer versus Tester:

o Test designer is the person who designs the tests where as the tester is the one actually
tests the code. During functional testing, the designer and tester are probably different
persons. During unit testing, the tester and the programmer merge into one person.
o Tests designed and executed by the software designers are by nature biased towards
structural consideration and therefore suffer the limitations of structural testing.

 Modularity versus Efficiency:

A module is a discrete, well-defined, small component of a system. Smaller the modules, difficult
to integrate; larger the modules, difficult to understand. Both tests and systems can be modular.
Testing can and should likewise be organized into modular components. Small, independent
test cases can be designed to test independent modules.

 Small versus Large:

Programming in large means constructing programs that consists of many components written by
many different programmers. Programming in the small is what we do for ourselves in the
privacy of our own offices. Qualitative and Quantitative changes occur with size and so must
testing methods and quality criteria.

 Builder versus Buyer:

Most software is written and used by the same organization. Unfortunately, this situation is
dishonest because it clouds accountability. If there is no separation between builder and buyer,
there can be no accountability.
 The different roles / users in a system include:
1. Builder: Who designs the system and is accountable to the buyer.
2. Buyer: Who pays for the system in the hope of profits from providing services?
3. User: Ultimate beneficiary or victim of the system. The user's interests are also
guarded by.
4. Tester: Who is dedicated to the builder's destruction?
5. Operator: Who has to live with the builders' mistakes, the buyers' murky (unclear)
specifications, testers' oversights and the users' complaints?

9
MODEL FOR TESTING:

Figure 1.5 A Model for Testing


Above figure is a model of testing process. It includes three models: A model of the environment, a model
of the program and a model of the expected bugs.
 Environment:
o A Program's environment is the hardware and software required to make it run. For
online systems, the environment may include communication lines, other systems,
terminals and operators.
o The environment also includes all programs that interact with and are used to create the
program under test - such as OS, linkage editor, loader, compiler, utility routines.
o Because the hardware and firmware are stable, it is not smart to blame the environment
for bugs.
 Program:
o Most programs are too complicated to understand in detail.
o The concept of the program is to be simplified in order to test it.
o If simple model of the program doesn’t explain the unexpected behavior, we may have
to modify that model to include more facts and details. And if that fails, we may have to
modify the program.
 Bugs:
o Bugs are more insidious (deceiving but harmful) than ever we expect them to be.
o An unexpected test result may lead us to change our notion of what a bug is and
our model of bugs.
o Some optimistic notions that many programmers or testers have about bugs are
usually unable to test effectively and unable to justify the dirty tests most programs
need.
o Optimistic notions about bugs:
1. Benign Bug Hypothesis: The belief that bugs are nice, tame and
logical. (Benign: Not Dangerous)

10
2. Bug Locality Hypothesis: The belief that a bug discovered with in
a component affects only that component's behavior.
3. Control Bug Dominance: The belief those errors in the control structures
(if, switch etc) of programs dominate the bugs.
4. Code / Data Separation: The belief that bugs respect the separation of code
and data.
5. Lingua Salvatore Est.: The belief that the language syntax and semantics
(e.g. Structured Coding, Strong typing, etc) eliminates most bugs.
6. Corrections Abide: The mistaken belief that a corrected bug remains corrected.
7. Silver Bullets: The mistaken belief that X (Language, Design method,
representation, environment) grants immunity from bugs.
8. Sadism Suffices: The common belief (especially by independent tester) that a
sadistic streak, low cunning, and intuition are sufficient to eliminate most bugs.
Tough bugs need methodology and techniques.
9. Angelic Testers: The belief that testers are better at test design than
programmers is at code design.

 Tests:
o Tests are formal procedures, Inputs must be prepared, Outcomes should predict, tests
should be documented, commands need to be executed, and results are to be observed.
All these errors are subjected to error
o We do three distinct kinds of testing on a typical software system. They are:
1. Unit / Component Testing: A Unit is the smallest testable piece of software
that can be compiled, assembled, linked, loaded etc. A unit is usually the work
of one programmer and consists of several hundred or fewer lines of code. Unit
Testing is the testing we do to show that the unit does not satisfy its functional
specification or that its implementation structure does not match the intended
design structure. A Component is an integrated aggregate of one or more units.
Component Testing is the testing we do to show that the component does not
satisfy its functional specification or that its implementation structure does not
match the intended design structure.
2. Integration Testing: Integration is the process by which components are
aggregated to create larger components. Integration Testing is testing done to
show that even though the components were individually satisfactory (after
passing component testing), checks the combination of components are
incorrect or inconsistent.
3. System Testing: A System is a big component. System Testing is aimed at
revealing bugs that cannot be attributed to components. It includes testing for
performance, security, accountability, configuration sensitivity, startup and
recovery.
 Role of Models: The art of testing consists of creating, selecting, exploring, and revising
models. Our ability to go through this process depends on the number of different models we
have at hand and their ability to express a program's behavior.

11
CONSEQUENCES OF BUGS:

 Importance of bugs: The importance of bugs depends on frequency, correction cost,


installation cost, and consequences.
1. Frequency: How often does that kind of bug occur? Pay more attention to the more
frequent bug types.
2. Correction Cost: What does it cost to correct the bug after it is found? The cost is the
sum of 2 factors: (1) the cost of discovery (2) the cost of correction. These costs go up
dramatically later in the development cycle when the bug is discovered. Correction cost
also depends on system size.
3. Installation Cost: Installation cost depends on the number of installations: small for a
single user program but more for distributed systems. Fixing one bug and distributing
the fix could exceed the entire system's development cost.
4. Consequences: What are the consequences of the bug? Bug consequences can range
from mild to catastrophic.

A reasonable metric for bug importance is


Importance= ($) = Frequency * (Correction cost + Installation cost + Consequential cost)

 Consequences of bugs: The consequences of a bug can be measure in terms of human


rather than machine. Some consequences of a bug on a scale of one to ten are:
1 Mild: The symptoms of the bug offend us aesthetically (gently); a misspelled output or
a misaligned printout.
2 Moderate: Outputs are misleading or redundant. The bug impacts the
system's performance.
3 Annoying: The system's behavior because of the bug is dehumanizing. E.g.
Names are truncated or arbitrarily modified.
4 Disturbing: It refuses to handle legitimate (authorized / legal) transactions. The ATM
won’t give you money. My credit card is declared invalid.
5 Serious: It loses track of its transactions. Not just the transaction itself but the fact that
the transaction occurred. Accountability is lost.
6 Very Serious: The bug causes the system to do the wrong transactions. Instead of
losing your paycheck, the system credits it to another account or converts deposits to
withdrawals.
7 Extreme: The problems aren't limited to a few users or to few transaction types. They
are frequent and arbitrary instead of sporadic infrequent) or for unusual cases.
8 Intolerable: Long term unrecoverable corruption of the database occurs and the
corruption is not easily discovered. Serious consideration is given to shutting the
system down.
9 Catastrophic: The decision to shut down is taken out of our hands because the system
fails.
10 Infectious: What can be worse than a failed system? One that corrupt other systems
even though it does not fall in itself ; that erodes the social physical environment; that
melts nuclear reactors and starts war.

12
 Flexible severity rather than absolutes:

o Quality can be measured as a combination of factors, of which number of bugs and


their severity is only one component.
o Many organizations have designed and used satisfactory, quantitative, quality metrics.
o Because bugs and their symptoms play a significant role in such metrics, as testing
progresses, you see the quality rise to a reasonable value which is deemed to be safe to
ship the product.
o The factors involved in bug severity are:
1. Correction Cost: Not so important because catastrophic bugs may be corrected
easier and small bugs may take major time to debug.
2. Context and Application Dependency: Severity depends on the context and
the application in which it is used.
3. Creating Culture Dependency: What’s important depends on the creators of
software and their cultural aspirations. Test tool vendors are more sensitive
about bugs in their software then games software vendors.
4. User Culture Dependency: Severity also depends on user culture. Naive users
of PC software go crazy over bugs where as pros (experts) may just ignore.
5. The software development phase: Severity depends on development phase.
Any bugs gets more severe as it gets closer to field use and more severe the
longer it has been around.

TAXONOMY OF BUGS:
 There is no universally correct way categorize bugs. The taxonomy is not rigid.
 A given bug can be put into one or another category depending on its history and the
programmer's state of mind.
 The major categories are: (1) Requirements, Features and Functionality Bugs (2) Structural
Bugs (3) Data Bugs (4) Coding Bugs (5) Interface, Integration and System Bugs (6) Test
and Test Design Bugs.

 Requirements, Features and Functionality Bugs: Various categories in Requirements,


Features and Functionality bugs include:

1. Requirements and Specifications Bugs:


 Requirements and specifications developed from them can be incomplete ambiguous, or
self- contradictory. They can be misunderstood or impossible to understand.
 The specifications that don't have flaws in them may change while the design is in
progress. The features are added, modified and deleted.
 Requirements, especially, as expressed in specifications are a major source of expensive bugs.
 The range is from a few percentages to more than 50%, depending on the application
and environment.
 What hurts most about the bugs is that they are the earliest to invade the system and the last
to leave.

13
2. Feature Bugs:
 Specification problems usually create corresponding feature problems.
 A feature can be wrong, missing, or superfluous (serving no useful purpose). A missing
feature or case is easier to detect and correct. A wrong feature could have deep design
implications.
 Removing the features might complicate the software, consume more resources, and
foster more bugs.

3. Feature Interaction Bugs:


 Providing correct, clear, implementable and testable feature specifications is not enough.
 Features usually come in groups or related features. The features of each group and the
interaction of features within the group are usually well tested.
 The problem is unpredictable interactions between feature groups or even between individual
features. For example, your telephone is provided with call holding and call forwarding. The
interactions between these two features may have bugs.
 Every application has its peculiar set of features and a much bigger set of unspecified feature
interaction potentials and therefore results in feature interaction bugs.

Specification and Feature Bug Remedies:


 Most feature bugs are rooted in human to human communication problems. One solution is to
use high-level, formal specification languages or systems.
 Such languages and systems provide short term support but in the long run, does not solve the
problem.
 Short term Support: Specification languages facilitate formalization of requirements and
inconsistency and ambiguity analysis.
 Long term Support: Assume that we have a great specification language and that can be used
to create unambiguous, complete specifications with unambiguous complete tests and
consistent test criteria.
 The specification problem has been shifted to a higher level but not eliminated.
Testing Techniques for functional bugs: Most functional test techniques- that is those
techniques which are based on a behavioral description of software, such as transaction
flow testing, syntax testing, domain testing, logic testing and state testing are useful in
testing functional bugs.

 Structural bugs: Various categories in Structural bugs include:


1. Control and Sequence Bugs:
 Control and sequence bugs include paths left out, unreachable code, improper nesting of loops,
loop-back or loop termination criteria incorrect, missing process steps, duplicated processing,
unnecessary processing, rampaging, GOTO's, ill-conceived (not properly planned) switches,
spaghetti code, and worst of all, pachinko code.
 One reason for control flow bugs is that this area is amenable (supportive) to theoretical
treatment.
 Most of the control flow bugs are easily tested and caught in unit testing.
 Another reason for control flow bugs is that use of old code especially ALP & COBOL code
are dominated by control flow bugs.

14
 Control and sequence bugs at all levels are caught by testing, especially structural testing,
more specifically path testing combined with a bottom line functional test based on a
specification.

2. Logic Bugs:
 Bugs in logic, especially those related to misunderstanding how case statements and
logic operators behave singly and combinations
 Also includes evaluation of Boolean expressions in deeply nested IF-THEN-ELSE constructs.
 If the bugs are parts of logical (i.e. boolean) processing not related to control flow, they
are characterized as processing bugs.
 If the bugs are parts of a logical expression (i.e. control-flow statement) which is used to
direct the control flow, then they are categorized as control-flow bugs.

3. Processing Bugs:
 Processing bugs include arithmetic bugs, algebraic, mathematical function
evaluation, algorithm selection and general processing.
 Examples of Processing bugs include: Incorrect conversion from one data representation to
other, ignoring overflow, improper use of greater-than-or-equal etc
 Although these bugs are frequent (12%), they tend to be caught in good unit testing.

4. Initialization Bugs:
 Initialization bugs are common. Initialization bugs can be improper and superfluous.
 Superfluous bugs are generally less harmful but can affect performance.
 Typical initialization bugs include: Forgetting to initialize the variables before first use,
assuming that they are initialized elsewhere, initializing to the wrong format, representation or
type etc
 Explicit declaration of all variables, as in Pascal, can reduce some initialization problems.

5. Data-Flow Bugs and Anomalies:


 Most initialization bugs are special case of data flow anomalies.
 A data flow anomaly occurs where there is a path along which we expect to do something
unreasonable with data, such as using an uninitialized variable, attempting to use a variable
before it exists, modifying and then not storing or using the result, or initializing twice without
an intermediate use.

 Data bugs:
 Data bugs include all bugs that arise from the specification of data objects, their formats, the
number of such objects, and their initial values.
 Data Bugs are at least as common as bugs in code, but they are often treated as if they did
not exist at all.
 Code migrates data: Software is evolving towards programs in which more and more of
the control and processing functions are stored in tables.
 Because of this, there is an increasing awareness that bugs in code are only half the battle
and the data problems should be given equal attention.

15
Dynamic Data Vs Static data:

 Dynamic data are transitory. Whatever their purpose their lifetime is relatively short, typically
the processing time of one transaction. A storage object may be used to hold dynamic data of
different types, with different formats, attributes and residues.
 Dynamic data bugs are due to leftover garbage in a shared resource. This can be handled in one
of the three ways: (1) Clean up after the use by the user (2) Common Cleanup by the resource
manager (3) No Clean up
 Static Data are fixed in form and content. They appear in the source code or database directly
or indirectly, for example a number, a string of characters, or a bit pattern.
 Compile time processing will solve the bugs caused by static data.

Information, parameter, and control:


Static or dynamic data can serve in one of three roles, or in combination of roles: as a parameter, for
control, or for information.

Content, Structure and Attributes:


 Content can be an actual bit pattern, character string, or number put into a data structure.
Content is a pure bit pattern and has no meaning unless it is interpreted by a hardware or
software processor. All data bugs result in the corruption or misinterpretation ofcontent.
 Structure relates to the size, shape and numbers that describe the data object, which is
memory location used to store the content. (E.g. A two dimensionalarray).
 Attributes relates to the specification meaning that is the semantics associated with the
contents of a data object. (E.g. an integer, an alphanumeric string, a subroutine). The severity
and subtlety of bugs increases as we go from content to attributes because the things get less
formal in that direction.

 Coding bugs:
 Coding errors of all kinds can create any of the other kind ofbugs.
 Syntax errors are generally not important in the scheme of things if the source
language translator has adequate syntax checking.
 If a program has many syntax errors, then we should expect many logic and coding bugs.
 The documentation bugs are also considered as coding bugs which may mislead
the maintenance programmers.

 Interface, integration, and system bugs:


Various categories of bugs in Interface, Integration, and System Bugs are:

1. External Interfaces:
 The external interfaces are the means used to communicate with the world.
 These include devices, actuators, sensors, input terminals, printers, and communication lines.
 The primary design criterion for an interface with outside world should be robustness.

16
 All external interfaces, human or machine should employ a protocol. The protocol may
be wrong or incorrectly implemented.
 Other external interface bugs are: invalid timing or sequence assumptions related to
external signals
 Misunderstanding external input or output formats.
 Insufficient tolerance to bad input data.

2. Internal Interfaces:
 Internal interfaces are in principle not different from external interfaces but they are
more controlled.
 A best example for internal interfaces is communicating routines.
 The external environment is fixed and the system must adapt to it but the internal
environment, which consists of interfaces with other components, can be negotiated.
 Internal interfaces have the same problem as external interfaces.

3. Hardware Architecture:
 Bugs related to hardware architecture originate mostly from misunderstanding how the
hardware works.
 Examples of hardware architecture bugs: address generation error, i/o device operation /
instruction error, waiting too long for a response, incorrect interrupt handling etc.
 The remedy for hardware architecture and interface problems is twofold: (1) Good
Programming and Testing (2) Centralization of hardware interface software in programs
written by hardware interface specialists.

4. Operating System Bugs:


 Program bugs related to the operating system are a combination of hardware architecture and
interface bugs mostly caused by a misunderstanding of what it is the operating system does.
 Use operating system interface specialists, and use explicit interface modules or macros for
all operating system calls.
 This approach may not eliminate the bugs but at least will localize them and make
testing easier.

5. Software Architecture:
 Software architecture bugs are the kind that called - interactive.
 Routines can pass unit and integration testing without revealing such bugs.
 Many of them depend on load, and their symptoms emerge only when the system is stressed.
 Sample for such bugs: Assumption that there will be no interrupts, Failure to block or un
block interrupts, Assumption that memory and registers were initialized or not initialized etc
 Careful integration of modules and subjecting the final system to a stress test are effective
methods for these bugs.

17
6. Control and Sequence Bugs (Systems Level):
These bugs include: Ignored timing, Assuming that events occur in a specified sequence, Working
on data before all the data have arrived from disc, Waiting for an impossible combination of
prerequisites, Missing, wrong, redundant or superfluous process steps.
The remedy for these bugs is highly structured sequence control. Specialize, internal, sequence
control mechanisms are helpful.

7. Resource Management Problems:


 Memory is subdivided into dynamically allocated resources such as buffer blocks,
queue blocks, task control blocks, and overlay buffers.
 External mass storage units such as disc’s, are subdivided into memory resource pools.
 Some resource management and usage bugs: Required resource not obtained, Wrong
resource used, Resource is already in use, Resource dead lock etc
 Resource Management Remedies: A design remedy that prevents bugs is always
preferable to a test method that discovers them.
 The design remedy in resource management is to keep the resource structure simple: the
fewest different kinds of resources, the fewest pools, and no private resource management.

8. Integration Bugs:
 Integration bugs are bugs having to do with the integration of, and with the interfaces between,
working and tested components.
 These bugs results from inconsistencies or incompatibilities between components.
 The communication methods include data structures, call sequences, registers, semaphores,
and communication links and protocols results in integration bugs.
 The integration bugs do not constitute a big bug category (9%) they are expensive category
because they are usually caught late in the game and because they force changes in several
components and/or data structures.

9. System Bugs:
 System bugs covering all kinds of bugs that cannot be ascribed to a component or to their
simple interactions, but result from the totality of interactions between many components such
as programs, data, hardware, and the operating systems.
 There can be no meaningful system testing until there has been thorough component and
integration testing.
 System bugs are infrequent (1.7%) but very important because they are often found only after
the system has been fielded.

 TEST AND TEST DESIGN BUGS:


 Testing: testers have no immunity to bugs. Tests require complicated scenarios and databases.
 They require code or the equivalent to execute and consequently they can have bugs.
 Test criteria: if the specification is correct, it is correctly interpreted and implemented, and
a proper test has been designed; but the criterion by which the software's behavior is

18
judged may be incorrect or impossible. So, a proper test criteria has to be designed. The more
complicated the criteria, the likelier they are to have bugs.

Remedies: The remedies of test bugs are:


1. Test Debugging: The first remedy for test bugs is testing and debugging the tests. Test debugging,
when compared to program debugging, is easier because tests, when properly designed are simpler
than programs and do not have to make concessions to efficiency.
2. Test Quality Assurance: Programmers have the right to ask how quality in independent testing is
monitored.
3. Test Execution Automation: The history of software bug removal and prevention is
indistinguishable from the history of programming automation aids. Assemblers, loaders, compilers
are developed to reduce the incidence of programming and operation errors. Test execution bugs are
virtually eliminated by various test execution automation tools.
4. Test Design Automation: Just as much of software development has been automated, much test
design can be and has been automated. For a given productivity rate, automation reduces the bug
count
- be it for software or be it for tests.

19
UNIT II

FLOW GRAPHS, PATH TESTING AND TRANSACTION FLOW TESTING

BASICS OF PATH TESTING:

 Path Testing:
o Path Testing is the name given to a family of test techniques based on judiciously
selecting a set of test paths through the program.
o If the set of paths are properly chosen then we have achieved some measure of test
thoroughness. For example, pick enough paths to assure that every source statement has
been executed at least once.
o Path testing techniques are the oldest of all structural test techniques.
o Path testing is most applicable to new software for unit testing. It is a
structural technique.
o It requires complete knowledge of the program's structure.
o It is most often used by programmers to unit test their own code.
o The effectiveness of path testing rapidly deteriorates as the size of the
software aggregate under test increases.

 The Bug Assumption:


o The bug assumption for the path testing strategies is that something has gone wrong
with the software that makes it take a different path than intended.
o As an example "GOTO X" where "GOTO Y" had been intended.
o Structured programming languages prevent many of the bugs targeted by path testing:
as a consequence the effectiveness for path testing for these languages is reduced and
for old code in COBOL, ALP, FORTRAN and Basic, the path testing is indispensable.

 Control Flow Graphs:


o The control flow graph is a graphical representation of a program's control structure.
It uses the elements named process blocks, decisions, and junctions.
o The flow graph is similar to the earlier flowchart, with which it is not to be confused.
o Flow Graph Elements: A flow graph contains four different types of elements.
(1) Process Block (2) Decisions (3) Junctions (4) Case Statements
1. Process Block:
 A process block is a sequence of program statements uninterrupted by either decisions
or junctions.
 It is a sequence of statements such that if any one of statement of the block is executed, then
all statement thereof are executed.
 Formally, a process block is a piece of straight line code of one statement or hundreds
of statements.
A process has one entry and one exit. It can consist of a single statement or instruction, a
sequence of statements or instructions, a single entry/exit subroutine, a macro or function call,
or a sequence of these.

20
2. Decisions:
 A decision is a program point at which the control flow can diverge.
 Machine language conditional branch and conditional skip instructions are examples of
decisions.
 Most of the decisions are two-way but some are three way branches in control flow.
3. Case Statements:
 A case statement is a multi-way branch or decisions.
 Examples of case statement are a jump table in assembly language, and the PASCAL
case statement.
 From the point of view of test design, there are no differences between Decisions and
Case Statements
4. Junctions:
 A junction is a point in the program where the control flow can merge.
 Examples of junctions are: the target of a jump or skip instruction in ALP, a label that is a
target of GOTO.

Figure 2.1: Flow graph Elements


Control Flow Graphs Vs Flowcharts:
o A program's flow chart resembles a control flow graph.
o In flow graphs, we don't show the details of what is in a process block.
o In flow charts every part of the process block is drawn.
o The flowchart focuses on process steps, where as the flow graph focuses on control flow of
the program.
o The act of drawing a control flow graph is a useful tool that can help us clarify the control
flow and data flow issues.

16
Notational Evolution:
The control flow graph is simplified representation of the program's structure. The notation changes
made in creation of control flow graphs:
o The process boxes weren't really needed. There is an implied process on every line joining
junctions and decisions.
o We don't need to know the specifics of the decisions, just the fact that there is a branch.
o The specific target label names aren't important-just the fact that they exist. So we can replace
them by simple numbers.
o To understand this, we will go through an example (Figure 2.2) written in a FORTRAN like
programming language called Programming Design Language (PDL). The program's
corresponding flowchart (Figure 2.3) and flow graph (Figure 2.4) were also provided below for
better understanding.
o The first step in translating the program to a flowchart is shown in Figure 2.3, where we have
the typical one-for-one classical flowchart. Note that complexity has increased, clarity has
decreased, and that we had to add auxiliary labels (LOOP, XX, and YY), which have no actual
program counterpart. In Figure 2.4 we merged the process steps and replaced them with the
single process box.
o We now have a control flow graph. But this representation is still too busy. We simplify the
notation further to achieve Figure 2.5, where for the first time we can really see what the
control flow looks like.

Figure 2.2: Program Example (PDL)

17
Figure 2.3: One-to-one flowchart for example program in Figure 2.2

Figure 2.4: Control Flow graph for example in Figure 2.2

18
Figure 2.5: Simplified Flow graph Notation

Figure 2.6: Even Simplified Flow graph Notation


The final transformation is shown in Figure 2.6, where we've dropped the node numbers to achieve an
even simpler representation. The way to work with control flow graphs is to use the simplest possible
representation - that is, no more information than you need to correlate back to the source program or
PDL.

LINKED LIST REPRESENTATION:

Although graphical representations of flow graphs are revealing, the details of the control flow inside
a program they are often inconvenient.
In linked list representation, each node has a name and there is an entry on the list for each link in the
flow graph. Only the information pertinent to the control flow is shown.

19
Linked List representation of Flow Graph:

Figure 2.7: Linked List Control Flow graph Notation FLOWGRAPH -

PROGRAM CORRESPONDENCE:
A flow graph is a pictorial representation of a program and not the program itself, just as a
topographic map.
You can’t always associate the parts of a program in a unique way with flow graph parts because
many program structures, such as if-then-else constructs, consists of a combination of decisions,
junctions, and processes.
The translation from a flow graph element to a statement and vice versa is not always unique. (See
Figure 2.8)

Figure 2.8: Alternative Flow graphs for same logic (Statement "IF (A=0)
AND (B=1) THEN . . .").

20
An improper translation from flow graph to code during coding can lead to bugs, and improper
translation during the test design lead to missing test cases and causes undiscovered bugs.

FLOWGRAPH AND FLOWCHART GENERATION:

Flowcharts can be
1. Handwritten by the programmer.
2. Automatically produced by a flowcharting program based on a mechanical analysis of
the source code.
3. Semi automatically produced by a flow charting program based in part on structural
analysis of the source code and in part on directions given by the programmer.
There are relatively few control flow graph generators.

PATH TESTING - PATHS, NODES AND LINKS:

Path: A path through a program is a sequence of instructions or statements that starts at an entry,
junction, or decision and ends at another, or possibly the same junction, decision, or exit.
o A path may go through several junctions, processes, or decisions, one or more times.
o Paths consist of segments.
o The segment is a link - a single process that lies between two nodes.
o A path segment is succession of consecutive links that belongs to some path.
o The length of path measured by the number of links in it and not by the number of
the instructions or statements executed along that path.
o The name of a path is the name of the nodes along the path.

FUNDAMENTAL PATH SELECTION CRITERIA:

There are many paths between the entry and exit of a typical routine.
Every decision doubles the number of potential paths. And every loop multiplies the number of
potential paths by the number of different iteration values possible for the loop.
Defining complete testing:
1. Exercise every path from entry to exit.
2. Exercise every statement or instruction at least once.
3. Exercise every branch and case statement, in each direction at least once.
If prescription 1 is followed then 2 and 3 are automatically followed. But it is impractical for most
routines. It can be done for the routines that have no loops, in which it is equivalent to 2 and 3
prescriptions.
EXAMPLE: Here is the correct version.

21
For X negative, the output is X + A, while for X greater than or equal to zero, the output is X + 2A.
Following prescription 2 and executing every statement, but not every branch, would not reveal the
bug in the following incorrect version:

A negative value produces the correct answer. Every statement can be executed, but if the test cases do
not force each branch to be taken, the bug can remain hidden. The next example uses a test based on
executing each branch but does not force the execution of all statements:

The hidden loop around label 100 is not revealed by tests based on prescription 3 alone because no test
forces the execution of statement 100 and the following GOTO statement. Furthermore, label 100 is
not flagged by the compiler as an unreferenced label and the subsequent GOTO does not refer to an
undefined label.

A Static Analysis (that is, an analysis based on examining the source code or structure) cannot
determine whether a piece of code is or is not reachable. There could be subroutine calls with
parameters that are subroutine labels, or in the above example there could be a GOTO that targeted
label 100 but could never achieve a value that would send the program to that label.

Only a Dynamic Analysis (that is, an analysis based on the code's behavior while running - which is
to say, to all intents and purposes, testing) can determine whether code is reachable or not and
therefore distinguish between the ideal structure we think we have and the actual, buggy structure.

PATH TESTING CRITERIA:

Any testing strategy based on paths must at least both exercise every instruction and take branches in
all directions.
A set of tests that does this is not complete in an absolute sense, but it is complete in the sense that
anything less must leave something untested.

22
So we have explored three different testing criteria or strategies out of a potentially infinite family of
strategies.
i.
Path Testing (Pinf):
1. Execute all possible control flow paths through the program: typically, this is restricted to
all possible entry/exit paths through the program.
2. If we achieve this prescription, we are said to have achieved 100% path coverage. This is
the strongest criterion in the path testing strategy family: it is generally impossible to
achieve.
ii.
Statement Testing (P1):
1. Execute all statements in the program at least once under some test. If we do enough
tests to achieve this, we are said to have achieved 100% statement coverage.
2. An alternate equivalent characterization is to say that we have achieved 100%
node coverage. We denote this by C1.
3. This is the weakest criterion in the family: testing less than this for new software
is unconscionable (unprincipled or cannot be accepted) and should be
criminalized.
iii.
Branch Testing (P2):
1. Execute enough tests to assure that every branch alternative has been exercised at least
once under some test.
2. If we do enough tests to achieve this prescription, then we have achieved 100%
branch coverage.
3. An alternative characterization is to say that we have achieved 100% link coverage.
4. For structured software, branch testing and therefore branch coverage strictly
includes statement coverage.
5. We denote branch coverage by C2.

Commonsense and Strategies:


 Branch and statement coverage are accepted today as the minimum mandatory testing
requirement.
 The question "why not use a judicious sampling of paths?, what is wrong with leaving some
code, untested?" is ineffectual in the view of common sense and experience since: (1.) Not
testing a piece of a code leaves a residue of bugs in the program in proportion to the size of the
untested code and the probability of bugs. (2.) The high probability paths are always
thoroughly tested if only to demonstrate that the system works properly.
 Which paths to be tested? You must pick enough paths to achieve C1+C2. The question of
what is the fewest number of such paths is interesting to the designer of test tools that help
automate the path testing, but it is not crucial to the pragmatic (practical) design of tests. It is
better to make many simple paths than a few complicated paths.

23
 Path Selection Example:

Figure 2.9: An example flow graph to explain path selection Practical

Suggestions in Path Testing:

1. Draw the control flow graph on a single sheet of paper.


2. Make several copies - as many as you will need for coverage (C1+C2) and several more.
3. Use a yellow highlighting marker to trace paths. Copy the paths onto master sheets.
4. Continue tracing paths until all lines on the master sheet are covered, indicating that you
appear to have achieved C1+C2.
5. As you trace the paths, create a table that shows the paths, the coverage status of each
process, and each decision.
6. The above paths lead to the following table considering Figure 2.9:

7. After you have traced a covering path set on the master sheet and filled in the table for
every path, check the following:
1. Does every decision have a YES and a NO in its column? (C2)
2. Has every case of all case statements been marked? (C2)
3. Is every three - way branch (less, equal, greater) covered? (C2)
4. Is every link (process) covered at least once? (C1)

24
8. Revised Path Selection Rules:
 Pick the simplest, functionally sensible entry/exit path.
 Pick additional paths as small variation from previous paths. Pick paths that do not
have loops rather than paths that do. Favor short paths that make sense over paths that
don't.
 Pick additional paths that have no obvious functional meaning only if it's necessary
to provide coverage.
 Be comfortable with your chosen paths. Play your hunches (guesses) and give your intuition
free reign as long as you achieve C1+C2.
 Don't follow rules slavishly (blindly) - except for coverage.

LOOPS:

Cases for a single loop: A Single loop can be covered with two cases: Looping and Not looping. But,
experience shows that many loop-related bugs are not discovered by C1+C2. Bugs hide themselves in
corners and congregate at boundaries - in the cases of loops, at or around the minimum or maximum
number of times the loop can be iterated. The minimum number of iterations is often zero, but it need
not be.

CASE 1: Single loop, Zero minimum, N maximum, No excluded values


1. Try bypassing the loop (zero iterations). If you can't, you either have a bug, or zero is not
the minimum and you have the wrong case.
2. Could the loop-control variable be negative? Could it appear to specify a negative number
of iterations? What happens to such a value?
3. One pass through the loop.
4. Two passes through the loop.
5. A typical number of iterations, unless covered by a previous test.
6. One less than the maximum number of iterations.
7. The maximum number of iterations.
8. Attempt one more than the maximum number of iterations. What prevents the loop-control
variable from having this value? What will happen with this value if it is forced?

CASE 2: Single loop, Non-zero minimum, No excluded values


1. Try one less than the expected minimum. What happens if the loop control variable's value is
less than the minimum? What prevents the value from being less than the minimum?
2. The minimum number of iterations.
3. One more than the minimum number of iterations.
4. Once, unless covered by a previous test.
5. Twice, unless covered by a previous test.
6. A typical value.
7. One less than the maximum value.
8. The maximum number of iterations.
9. Attempt one more than the maximum number of iterations.

25
CASE 3: Single loops with excluded values
 Treat single loops with excluded values as two sets of tests consisting of loops without excluded
values, such as case 1 and 2 above.
 Example, the total range of the loop control variable was 1 to 20, but that values 7, 8,9,10 were
excluded. The two sets of tests are 1-6 and 11-20.
 The test cases to attempt would be 0,1,2,4,6,7 for the first range and 10,11,15,19,20,21 for
the second range.

Kinds of Loops: There are only three kinds of loops with respect to path testing:

 Nested Loops:
The number of tests to be performed on nested loops will be the exponent of the tests performed on
single loops.
As we cannot always afford to test all combinations of nested loops' iterations values. Here's a tactic
used to discard some of these values:
1. Start at the inner most loop. Set all the outer loops to their minimum values.
2. Test the minimum, minimum+1, typical, maximum-1 , and maximum for the innermost loop,
while holding the outer loops at their minimum iteration parameter values. Expand the tests as
required for out of range and excluded values.
3. If you've done the outmost loop, GOTO step 5, else move out one loop and set it up as in step
2 with all other loops set to typical values.
4. Continue outward in this manner until all loops have been covered.
5. Do all the cases for all loops in the nest simultaneously.

 Concatenated Loops:
Concatenated loops fall between single and nested loops with respect to test cases. Two loops are
concatenated if it's possible to reach one after exiting the other while still on a path from
entrance to exit.
If the loops cannot be on the same path, then they are not concatenated and can be treated as
individual loops.

 Horrible Loops:
A horrible loop is a combination of nested loops, the use of code that jumps into and out of loops,
intersecting loops, hidden loops, and cross connected loops.
Makes iteration value selection for test cases an awesome and ugly task, which is another reason
such structures should be avoided.

26
Figure 2.10: Example of Loop types

Loop Testing Time:


Any kind of loop can lead to long testing time, especially if all the extreme value cases are to
attempted (Max-1, Max, Max+1).
 This situation is obviously worse for nested and dependent concatenated loops.
 Consider nested loops in which testing the combination of extreme values lead to long test
times. Several options to deal with:
 Prove that the combined extreme cases are hypothetically possible, they are not possible in
the real world

27
 Put in limits or checks that prevent the combined extreme cases. Then you have to test
the software that implements such safety measures.

PREDICATES, PATH PREDICATES AND ACHIEVABLE PATHS:

PREDICATE: The logical function evaluated at a decision is called Predicate. The direction taken at a
decision depends on the value of decision variable. Some examples are: A>0, x+y>=90.......

PATH PREDICATE: A predicate associated with a path is called a Path Predicate. For example, "x is
greater than zero", "x+y>=90", "w is either negative or equal to 10 is true" is a sequence of predicates
whose truth values will cause the routine to take a specific path.

MULTIWAY BRANCHES:
The path taken through a multiway branch such as a computed GOTO's, case statement, or jump
tables cannot be directly expressed in TRUE/FALSE terms.
Although, it is possible to describe such alternatives by using multi valued logic, an expedient
(practical approach) is to express multiway branches as an equivalent set of if..then..else
statements.
For example a three way case statement can be written as: If case=1 DO A1 ELSE (IF Case=2 DO
A2 ELSE DO A3 ENDIF)ENDIF.

INPUTS:
In testing, the word input is not restricted to direct inputs, such as variables in a subroutine call, but
includes all data objects referenced by the routine whose values are fixed prior to entering it.
For example, inputs in a calling sequence, objects in a data structure, values left in registers, or
any combination of object types.
The input for a particular test is mapped as a one dimensional array called as an Input Vector.

PREDICATE INTERPRETATION:
The simplest predicate depends only on input variables.
For example if x1,x2 are inputs, the predicate might be x1+x2>=7, given the values of x1 and x2 the
direction taken through the decision is based on the predicate is determined at input time and does
not depend on processing.
Another example, assume a predicate x1+y>=0 that along a path prior to reaching this predicate we
had the assignment statement y=x2+7. Although our predicate depends on processing, we can
substitute the symbolic expression for y to obtain an equivalent predicate x1+x2+7>=0.
The act of symbolic substitution of operations along the path in order to express the predicate
solely in terms of the input vector is called predicate interpretation.
Sometimes the interpretation may depend on the path; for example, INPUT X
ON X GOTO A, B, C, ...

28
A: Z := 7 @ GOTO HEM B: Z := -7 @ GOTO HEM C: Z := 0 @ GOTO HEM
.........
HEM: DO SOMETHING
.........
HEN: IF Y + Z > 0 GOTO ELL ELSE GOTO EMM
The predicate interpretation at HEN depends on the path we took through the first multiway
branch. It yields for the three cases respectively, if Y+7>0, Y-7>0, Y>0.
The path predicates are the specific form of the predicates of the decisions along the selected path
after interpretation.

INDEPENDENCE OF VARIABLES AND PREDICATES:


The path predicates take on truth values based on the values of input variables, either directly or
indirectly.
If a variable's value does not change as a result of processing, that variable is independent of the
processing.
If the variable's value can change as a result of the processing, the variable is process dependent.
A predicate whose truth value can change as a result of the processing is said to be process
dependent and one whose truth value does not change as a result of the processing is
process independent.
Process dependence of a predicate does not always follow from dependence of the input variables
on which that predicate is based.

CORRELATION OF VARIABLES AND PREDICATES:


Two variables are correlated if every combination of their values cannot be independently
specified.
Variables whose values can be specified independently without restriction are called uncorrelated.
A pair of predicates whose outcomes depend on one or more variables in common are said to be
correlated predicates.
For example, the predicate X==Y is followed by another predicate X+Y == 8. If we select X and Y
values to satisfy the first predicate, we might have forced the 2nd predicate's truth value to change.
Every path through a routine is achievable only if all the predicates in that routine are
uncorrelated.

PATH PREDICATE EXPRESSIONS:


A path predicate expression is a set of boolean expressions, all of which must be satisfied to
achieve the selected path.
Example:
X1+3X2+17>=0 X3=17
X4-X1>=14X2

29
Any set of input values that satisfy all of the conditions of the path predicate expression will force
the routine to the path.
Sometimes a predicate can have an OR in it.
Example:
A: X5 > 0 E: X6 < 0
B: X1 + 3X2 + 17 B: X1 + 3X2 + 17
>= 0 >= 0
C: X3 = 17 C: X3 = 17
D: X4 - X1 >= D: X4 - X1 >=
14X2 14X2
Boolean algebra notation to denote the boolean expression:
ABCD+EBCD=(A+E)BCD

PREDICATE COVERAGE:
Compound Predicate: Predicates of the form A OR B, A AND B and more complicated
Boolean expressions are called as compound predicates.
Sometimes even a simple predicate becomes compound after interpretation. Example: the
predicate if (x=17) whose opposite branch is if x.NE.17 which is equivalent to x>17. Or. X<17.
Predicate coverage is being the achieving of all possible combinations of truth values
corresponding to the selected path have been explored under some test.
As achieving the desired direction at a given decision could still hide bugs in the associated
predicates

TESTING BLINDNESS:
Testing Blindness is a pathological (harmful) situation in which the desired path is achieved for
the wrong reason.
There are three types of Testing Blindness:

Assignment Blindness:
o Assignment blindness occurs when the buggy predicate appears to work correctly because the
specific value chosen for an assignment statement works with both the correct and incorrect
predicate.
o For Example:
Correct Buggy
X = 7 X = 7
........ ........
if Y > 0 if X+Y > 0
then ... then ...
o If the test case sets Y=1 the desired path is taken in either case, but there is still a bug.
Equality Blindness:
o Equality blindness occurs when the path selected by a prior predicate results in a value that
works both for the correct and buggy predicate.

30
o For Example:
Correct Buggy
if Y = 2 then if Y = 2 then
........ ........
if X+Y > 3 if X > 1
then ... then ...
o The first predicate if y=2 forces the rest of the path, so that for any positive value of x. the
path taken at the second predicate will be the same for the correct and buggy version.

Self Blindness:
o Self blindness occurs when the buggy predicate is a multiple of the correct predicate and as
a result is indistinguishable along that path.
o For Example:

Correct Buggy
X=A X=A
........ ........
if X-1 > 0 if X+A-2 > 0
then ... then ...
1. The assignment (x=a) makes the predicates multiples of each other, so the direction taken is
the same for the correct and buggy version.

PATH SENSITIZING:

o Review: achievable and unachievable paths:


1. We want to select and test enough paths to achieve a satisfactory notion of test completeness
such as C1+C2.
2. Extract the programs control flow graph and select a set of tentative covering paths.
3. For any path in that set, interpret the predicates along the path as needed to express them in terms
of the input vector. In general individual predicates are compound or may become compound as
a result of interpretation.
4. Trace the path through, multiplying the individual compound predicates to achieve a boolean
expression such as
(A+BC) (D+E) (FGH) (IJ) (K) (l) (L).
5. Multiply out the expression to achieve a sum of products form:
ADFGHIJKL+AEFGHIJKL+BCDFGHIJKL+BCEFGHIJKL
6. Each product term denotes a set of inequalities that if solved will yield an input vector that
will drive the routine along the designated path.
7. Solve any one of the inequality sets for the chosen path and you have found a set of input
values for the path.
8. If you can find a solution, then the path is achievable.
9. If you can’t find a solution to any of the sets of inequalities, the path is un achievable.
10. The act of finding a set of solutions to the path predicate expression is called
PATH SENSITIZATION.

31
o HEURISTIC PROCEDURES FOR SENSITIZING PATHS:

1. This is a workable approach, instead of selecting the paths without considering how to sensitize,
attempt to choose a covering path set that is easy to sensitize and pick hard to sensitize paths
only as you must to achieve coverage.
2. Identify all variables that affect the decision.
3. Classify the predicates as dependent or independent.
4. Start the path selection with un correlated, independent predicates.
5. If coverage has not been achieved using independent uncorrelated predicates, extend the path
set using correlated predicates.
6. If coverage has not been achieved extend the cases to those that involve dependent predicates.
7. Last, use correlated, dependent predicates.

PATH INSTRUMENTATION:

1. Path instrumentation is what we have to do to confirm that the outcome was achieved by
the intended path.
2. Co-incidental Correctness: The coincidental correctness stands for achieving the
desired outcome for wrong reason.

Figure 2.11: Coincidental Correctness


The above figure is an example of a routine that, for the (unfortunately) chosen input value (X
= 16), yields the same outcome (Y = 2) no matter which case we select. Therefore, the tests chosen this
way will not tell us whether we have achieved coverage. For example, the five cases could be
totally jumbled and still the outcome would be the same. Path Instrumentation is what we have to
do to confirm that the outcome was achieved by the intended path.
The types of instrumentation methods include:

32
1. Interpretive Trace Program:
o An interpretive trace program is one that executes every statement in order and records the
intermediate values of all calculations, the statement labels traversed etc.
o If we run the tested routine under a trace, then we have all the information we need to confirm the
outcome and, furthermore, to confirm that it was achieved by the intended path.
o The trouble with traces is that they give us far more information than we need. In fact, the typical
trace program provides so much information that confirming the path from its massive output
dump is more work than simulating the computer by hand to confirm the path.

2. Traversal Marker or Link Marker:


o A simple and effective form of instrumentation is called a traversal marker or link marker.
o Name every link by a lower case letter.
o Instrument the links so that the link's name is recorded when the link is executed.
o The succession of letters produced in going from the routine's entry to its exit should, if there
are no bugs, exactly correspond to the path name.

Figure 2.12: Single Link Marker Instrumentation

o Why Single Link Markers aren't enough: Unfortunately, a single link marker may not do
the trick because links can be chewed by open bugs.

Figure 2.13: Why Single Link Markers aren't enough.

33
We intended to traverse the ikm path, but because of a rampaging GOTO in the middle of the m
link, we go to process B. If coincidental correctness is against us, the outcomes will be the same
and we won't know about the bug.

Two Link Marker Method:


The solution to the problem of single link marker method is to implement two markers per
link: one at the beginning of each link and on at the end.
The two link markers now specify the path name and confirm both the beginning and end of the
link.

Figure 2.14: Double Link Marker Instrumentation

Link Counter: A less disruptive (and less informative) instrumentation method is based on
counters. Instead of a unique link name to be pushed into a string when the link is traversed, we
simply increment a link counter. We now confirm that the path length is as expected. The same
problem that led us to double link markers also leads us to double link counters.

TRANSACTION FLOW TESTING INTRODUCTION:

o A transaction is a unit of work seen from a system user's point of view.


o A transaction consists of a sequence of operations, some of which are performed by
a system, persons or devices that are outside of the system.
o Transaction begins with Birth-that is they are created as a result of some external act.
o At the conclusion of the transaction's processing, the transaction is no longer in
the system.
o Example of a transaction: A transaction for an online information retrieval
system might consist of the following steps or tasks:
 Accept input (tentative birth)
 Validate input (birth)
 Transmit acknowledgement to requester
 Do input processing
 Search file
 Request directions from user
 Accept input
 Validate input
34
 Process request
 Update file
 Transmit output
 Record transaction in log and clean up (death)

 TRANSACTION FLOW GRAPHS:

o Transaction flows are introduced as a representation of a system's processing.


o The methods that were applied to control flow graphs are then used for
functional testing.
o Transaction flows and transaction flow testing are to the independent system
tester what control flows are path testing is to the programmer.
o The transaction flow graph is to create a behavioral model of the program that leads
to functional testing.
o The transaction flow graph is a model of the structure of the system's
behavior (functionality).
o An example of a Transaction Flow is as follows:

Figure 2.15: An Example of a Transaction Flow

 USAGE:
o Transaction flows are indispensable for specifying requirements of
complicated systems, especially online systems.
o A big system such as an air traffic control or airline reservation system has
not hundreds, but thousands of different transaction flows.
o The flows are represented by relatively simple flow graphs, many of which have a
single straight-through path.
o Loops are infrequent compared to control flow graphs.
o The most common loop is used to request a retry after user input errors. An ATM
system, for example, allows the user to try, say three times, and will take the card
away
35
the fourth time.

 COMPLICATIONS:
o In simple cases, the transactions have a unique identity from the time they're created to
the time they're completed.
o In many systems the transactions can give birth to others, and transactions can
also merge.
o Births: There are three different possible interpretations of the decision symbol, or
nodes with two or more out links. It can be a Decision, Biosis or Mitosis.
1. Decision: Here the transaction will take one alternative or the other alternative
but not both. (See Figure 3.2 (a))
2. Biosis: Here the incoming transaction gives birth to a new transaction, and both
transactions continue on their separate paths, and the parent retains it identity.
(See Figure 3.2 (b))
3. Mitosis: Here the parent transaction is destroyed and two new transactions are
created.(See Figure 3.2 (c))

Figure 2.16: Nodes with multiple outlinks


Mergers: Transaction flow junction points are potentially as troublesome as transaction flow splits.
There are three types of junctions: (1) Ordinary Junction (2) Absorption (3) Conjugation
1 Ordinary Junction: An ordinary junction which is similar to the junction in a control flow
graph. A transaction can arrive either on one link or the other. (See Figure 3.3 (a))
2 Absorption: In absorption case, the predator transaction absorbs prey transaction. The prey
gone but the predator retains its identity. (See Figure 3.3 (b))
3 Conjugation: In conjugation case, the two parent transactions merge to form a new daughter.
In keeping with the biological flavor this case is called as conjugation.(See Figure 3.3 (c))

Figure 2.17: Transaction Flow Junctions and Mergers


We have no problem with ordinary decisions and junctions. Births, absorptions, and conjugations are as
problematic for the software designer as they are for the software modeler and the test designer; as a
consequence, such points have more than their share of bugs. The common problems are: lost
daughters, wrongful deaths, and illegitimate births.

36
TRANSACTION FLOW TESTING TECHNIQUES:
GET THE TRANSACTIONS FLOWS:
o Complicated systems that process a lot of different, complicated transactions
should have explicit representations of the transactions flows, or the equivalent.
o Transaction flows are like control flow graphs, and consequently we should expect
to have them in increasing levels of detail.
o The system's design documentation should contain an overview section that details the
main transaction flows.
o Detailed transaction flows are a mandatory pre requisite to the rational design of a
system's functional test.

INSPECTIONS, REVIEWS AND WALKTHROUGHS:


o Transaction flows are natural agenda for system reviews or inspections.
o In conducting the walkthroughs, you should:
 Discuss enough transaction types to account for 98%-99% of the transaction the
system is expected to process.
 Discuss paths through flows in functional rather than technical terms.
 Ask the designers to relate every flow to the specification and to show how
that transaction, directly or indirectly, follows from the requirements.
o Make transaction flow testing the corner stone of system functional testing just as
path testing is the corner stone of unit testing.
o Select additional flow paths for loops, extreme values, and domain boundaries.
o Design more test cases to validate all births and deaths.
o Publish and distribute the selected test paths through the transaction flows as early
as possible so that they will exert the maximum beneficial effect on the project.
PATH SELECTION:
o Select a set of covering paths (c1+c2) using the analogous criteria you used
for structural path testing.
o Select a covering set of paths based on functionally sensible transactions as you
would for control flow graphs.
o Try to find the most tortuous, longest, strangest path from the entry to the exit of
the transaction flow.

PATH SENSITIZATION:
o Most of the normal paths are very easy to sensitize-80% - 95% transaction
flow coverage (c1+c2) is usually easy to achieve.
o The remaining small percentage is often very difficult.
o Sensitization is the act of defining the transaction. If there are sensitization problems
on the easy paths, then bet on either a bug in transaction flows or a design bug.

PATH INSTRUMENTATION:
o Instrumentation plays a bigger role in transaction flow testing than in unit path testing.
o The information of the path taken for a given transaction must be kept with that
transaction and can be recorded by a central transaction dispatcher or by the individual
processing modules.
o In some systems, such traces are provided by the operating systems or a running log.
37
UNIT III
DATA FLOW TESTING
BASICS OF DATA FLOW TESTING:

DATA FLOW TESTING:


o Data flow testing is the name given to a family of test strategies based on selecting
paths through the program's control flow in order to explore sequences of events related
to the status of data objects.
o For example, pick enough paths to assure that every data object has been initialized
prior to use or that all defined objects have been used for something.
o Motivation: It is our belief that, just as one would not feel confident about a program
without executing every statement in it as part of some test, one should
not feel confident about a program without having seen the effect of using the value
produced by each and every computation.

DATA FLOW MACHINES:


o There are two types of data flow machines with different architectures. (1)
Von Neumann machines (2) Multi-instruction, multi-data machines (MIMD).
o Von Neumann Machine Architecture:
 Most computers today are von-neumann machines.
 This architecture features interchangeable storage of instructions and data in
the same memory units.
 The Von Neumann machine Architecture executes one instruction at a time
in the following, micro instruction sequence:
 Fetch instruction from memory
 Interpret instruction
 Fetch operands
 Process or Execute
 Store result
 Increment program counter
 GOTO 1
o Multi-instruction, Multi-data machines (MIMD) Architecture:
 These machines can fetch several instructions and objects in parallel.
 They can also do arithmetic and logical operations simultaneously on
different data objects.
 The decision of how to sequence them depends on the compiler.

BUG ASSUMPTION:
The bug assumption for data-flow testing strategies is that control flow is generally correct and
that something has gone wrong with the software so that data objects are not available when
they should be, or silly things are being done to data objects.
o Also, if there is a control-flow problem, we expect it to have symptoms that can be
detected by data-flow analysis.
o Although we'll be doing data-flow testing, we won't be using data flow graphs as such.

38
Rather, we'll use an ordinary control flow graph annotated to show what happens to the
data objects of interest at the moment.

DATA FLOW GRAPHS:


o The data flow graph is a graph consisting of nodes and directed links.
o We will use a control graph to show what happens to data objects of interest at
that moment.
o Our objective is to expose deviations between the data flows we have and the
data flows we want.

Figure 3.1: Example of a data flow graph

o Data Object State and Usage:


 Data Objects can be created, killed and used.
 They can be used in two distinct ways: (1) In a Calculation (2) As a part of
a Control Flow Predicate.
 The following symbols denote these possibilities:
1. Defined: d - defined, created, initialized etc
2. Killed or undefined: k - killed, undefined, released etc
3. Usage: u - used for something (c - used in Calculations, p - used in
a predicate)
1. Defined (d):
 An object is defined explicitly when it appears in a data declaration.

39
 Or implicitly when it appears on the left hand side of the assignment.
 It is also to be used to mean that a file has been opened.
 A dynamically allocated object has been allocated.
 Something is pushed on to the stack.
 A record written.

2.Killed or Undefined (k):


 An object is killed on undefined when it is released or otherwise made unavailable.
 When its contents are no longer known with certitude (with absolute certainty / perfectness).
 Release of dynamically allocated objects back to the availability pool.
 Return of records.
 The old top of the stack after it is popped.
 An assignment statement can kill and redefine immediately. For example, if A had been
previously defined and we do a new assignment such as A : = 17, we have killed A's previous
value and redefined A
3.Usage (u):
 A variable is used for computation (c) when it appears on the right hand side of an
assignment statement.
 A file record is read or written.
 It is used in a Predicate (p) when it appears directly in a predicate.

DATA FLOW ANOMALIES:


An anomaly is denoted by a two-character sequence of actions. For example, ku means that the object is
killed and then used, where as dd means that the object is defined twice without an intervening usage.
What is an anomaly is depend on the application.
There are nine possible two-letter combinations for d, k and u. some are bugs, some are suspicious, and
some are okay.

1 dd :- probably harmless but suspicious. Why define the object twice without an intervening usage?
2 dk :- probably a bug. Why define the object without using it?
3 du :- the normal case. The object is defined and then used.
4 kd :- normal situation. An object is killed and then redefined.
5 kk :- harmless but probably buggy. Did you want to be sure it was really killed?
6 ku :- a bug. the object doesnot exist.
7 ud :- usually not a bug because the language permits reassignment at almost any time.
8 uk :- normalsituation.
9 uu :- normalsituation.

In addition to the two letter situations, there are six single letter situations.We will use a leading dash to
mean that nothing of interest (d,k,u) occurs prior to the action noted along the entry-exit path of
interest.
A trailing dash to mean that nothing happens after the point of interest to the exit.
They possible anomalies are:
1 -k :- possibly anomalous because from the entrance to this point on the path, the variable
had not been defined. We are killing a variable that does not exist.

40
2 -d :- okay. This is just the first definition along this path.
3 -u :- possibly anomalous. Not anomalous if the variable is global and has been
previously defined.
4 k- :- not anomalous. The last thing done on this path was to kill the variable.
5 d- :- possibly anomalous. The variable was defined and not used on this path. But this
could be a global definition.
6 u- :- not anomalous. The variable was used but not killed on this path. Although this
sequence is not anomalous, it signals a frequent kind of bug. If d and k mean dynamic
storage allocation and return respectively, this could be an instance in which a
dynamically allocated object was not returned to the pool after use.

DATA FLOW ANOMALY STATE GRAPH:

Data flow anomaly model prescribes that an object can be in one of four distinct states:
0. K :- undefined, previously killed, doesnot exist
1. D :- defined but not yet used for anything
2. U :- has been used for computation or in predicate
3. A :- anomalous
These capital letters (K, D, U, A) denote the state of the variable and should not be confused with the program
action, denoted by lower case letters.
Unforgiving Data - Flow Anomaly Flow Graph: Unforgiving model, in which once a variable
becomes anomalous it can never return to a state of grace.

Figure 3.2: Unforgiving Data Flow Anomaly State Graph

Assume that the variable starts in the K state - that is, it has not been defined or does not exist. If an
attempt is made to use it or to kill it (e.g., say that we're talking about opening, closing, and using files
and that 'killing' means closing), the object's state becomes anomalous (state A) and, once it is
anomalous, no action can return the variable to a working state.

If it is defined (d), it goes into the D, or defined but not yet used, state. If it has been defined (D) and
redefined (d) or killed without use (k), it becomes anomalous, while usage (u) brings it to the U state.
If in U, redefinition (d) brings it to D, u keeps it in U, and k kills it.

Forgiving Data - Flow Anomaly Flow Graph: Forgiving model is an alternate model where
redemption (recover) from the anomalous state is possible

41
Figure 3.3: Forgiving Data Flow Anomaly State Graph
This graph has three normal and three anomalous states and he considers the kk sequence not to be
anomalous. The difference between this state graph and Figure 3.5 is that redemption is possible. A
proper action from any of the three anomalous states returns the variable to a useful working state.

The point of showing you this alternative anomaly state graph is to demonstrate that the specifics of an
anomaly depends on such things as language, application, context, or even your frame of mind. In
principle, you must create a new definition of data flow anomaly (e.g., a new state graph) in each
situation. You must at least verify that the anomaly definition behind the theory or imbedded in a data
flow anomaly test tool is appropriate to your situation.

STATIC Vs DYNAMIC ANOMALY DETECTION:

Static analysis is analysis done on source code without actually executing it. For example: source code
syntax error detection is the static analysis result.

Dynamic analysis is done on the fly as the program is being executed and is based on intermediate
values that result from the program's execution. For example: a division by zero warning is the
dynamic result.

If a problem, such as a data flow anomaly, can be detected by static analysis methods, then it doesn’t
belongs in testing - it belongs in the language processor.
There is actually a lot more static analysis for data flow analysis for data flow anomalies going on in
current language processors.

For example, language processors which force variable declarations can detect (-u) and (ku)
anomalies.But still there are many things for which current notions of static analysis are
INADEQUATE.

Why Static Analysis isn't enough? There are many things for which current notions of static analysis
are inadequate. They are:

42
 Dead Variables: Although it is often possible to prove that a variable is dead or alive at a given
point in the program, the general problem is unsolvable.
 Arrays: Arrays are problematic in that the array is defined or killed as a single object, but
reference is to specific locations within the array. Array pointers are usually dynamically
calculated, so there's no way to do a static analysis to validate the pointer value. In many
languages, dynamically allocated arrays contain garbage unless explicitly initialized and therefore,
-u anomalies are possible.
 Records and Pointers: The array problem and the difficulty with pointers is a special case of
multipart data structures. We have the same problem with records and the pointers to them. Also,
in many applications we create files and their names dynamically and there's no way to determine,
without execution, whether such objects are in the proper state on a given path or, for that matter,
whether they exist at all.
 Dynamic Subroutine and Function Names in a Call: subroutine or function name is a dynamic
variable in a call. What is passed, or a combination of subroutine names and data objects, is
constructed on a specific path. There's no way, without executing the path, to determine whether
the call is correct or not.
 False Anomalies: Anomalies are specific to paths. Even a "clear bug" such as ku may not be a bug
if the path along which the anomaly exists is unachievable. Such "anomalies" are false anomalies.
Unfortunately, the problem of determining whether a path is or is not achievable is unsolvable.

 Recoverable Anomalies and Alternate State Graphs: What constitutes an anomaly depends on
context, application, and semantics. How does the compiler know which model I have in mind? It
can't because the definition of "anomaly" is not fundamental. The language processor must have a
built-in anomaly definition with which you may or may not (with good reason) agree.
 Concurrency, Interrupts, System Issues: As soon as we get away from the simple single- task
uniprocessor environment and start thinking in terms of systems, most anomaly issues become
vastly more complicated.

How often do we define or create data objects at an interrupt level so that they can be processed by
a lower-priority routine? Interrupts can make the "correct" anomalous and the "anomalous"
correct. True concurrency (as in an MIMD machine) and pseudo concurrency (as in
multiprocessing) systems can do the same to us. Much of integration and system testing is aimed at
detecting data-flow anomalies that cannot be detected in the context of a single routine.

Although static analysis methods have limits, they are worth using and a continuing trend in
language processor design has been better static analysis methods, especially for data flow
anomaly detection. That's good because it means there's less for us to do as testers and we have far
too much to do as it is.

43
DATA FLOW MODEL:

The data flow model is based on the program's control flow graph - Don't confuse that with the
program's data flow graph.
Here we annotate each link with symbols (for example, d, k, u, c, and p) or sequences of symbols (for
example, dd, du, ddd) that denote the sequence of data operations on that link with respect to the
variable of interest. Such annotations are called link weights.
The control flow graph structure is same for every variable: it is the weights that change.

Components of the model:


1. To every statement there is a node, whose name is unique. Every node has at least one outlink
and at least one inlink except for exit nodes and entry nodes.
2. Exit nodes are dummy nodes placed at the outgoing arrowheads of exit statements (e.g., END,
RETURN), to complete the graph. Similarly, entry nodes are dummy nodes placed at entry
statements (e.g., BEGIN) for the same reason.
3. The outlink of simple statements (statements with only one outlink) are weighted by the proper
sequence of data-flow actions for that statement. Note that the sequence can consist of more
than one letter. For example, the assignment statement A:= A + B in most languages is
weighted by cd or possibly ckd for variable A. Languages that permit multiple simultaneous
assignments and/or compound statements can have anomalies within the statement. The
sequence must correspond to the order in which the object code will be executed for that
variable.
4. Predicate nodes (e.g., IF-THEN-ELSE, DO WHILE, CASE) are weighted with the p - use(s)
on every outlink, appropriate to that outlink.
5. Every sequence of simple statements (e.g., a sequence of nodes with one inlink and one
outlink) can be replaced by a pair of nodes that has, as weights on the link between them, the
concatenation of link weights.
6. If there are several data-flow actions on a given link for a given variable, then the weight of
the link is denoted by the sequence of actions on that link for that variable.
7. Conversely, a link with several data-flow actions on it can be replaced by a succession of
equivalent links, each of which has at most one data-flow action for any variable.
Let us consider the example:

Figure 3.4: Program Example (PDL)

44
Figure 3.5: Unannotated flow graph for example program in Figure 3.4

Figure 3.6: Control flow graph annotated for X and Y data flows.

Figure 3.7: Control flow graph annotated for Z data flow.

Figure 3.8: Control flow graph annotated for V data flow.

45
STRATEGIES OF DATA FLOW TESTING:

 INTRODUCTION:

o Data Flow Testing Strategies are structural strategies.


o In contrast to the path-testing strategies, data-flow strategies take into account what
happens to data objects on the links in addition to the raw connectivity of the
graph.
o In other words, data flow strategies require data-flow link weights (d,k,u,c,p).
o Data Flow Testing Strategies are based on selecting test path segments (also called sub
paths) that satisfy some characteristic of data flows for all data objects.
o For example, all sub paths that contain a d (or u, k, du, dk).
o A strategy X is stronger than another strategy Y if all test cases produced under Y
are included in those produced under X - conversely for weaker.

 TERMINOLOGY:
1. Definition-Clear Path Segment, with respect to variable X, is a connected sequence of
links such that X is (possibly) defined on the first link and not redefined or killed on
any subsequent link of that path segment. ll paths in Figure
3.9 are definition clear because variables X and Y are defined only on the first link (1,3)
and not thereafter. In Figure 3.10, we have a more complicated situation. The following
path segments are definition-clear: (1,3,4), (1,3,5), (5,6,7,4), (7,8,9,6,7), (7,8,9,10),
(7,8,10), (7,8,10,11). Subpath (1,3,4,5) is not definition-clear because the variable is
defined on (1,3) and again on (4,5). For practice, try finding all the definition-clear
subpaths for this routine (i.e., for all variables).
2. Loop-Free Path Segment is a path segment for which every node in it is visited atmost
once. For Example, path (4,5,6,7,8,10) in Figure 3.10 is loop free, but path
(10,11,4,5,6,7,8,10,11,12) is not because nodes 10 and 11 are each visited twice.
3. Simple path segment is a path segment in which at most one node is visited twice. For
example, in Figure 3.10, (7,4,5,6,7) is a simple path segment. A simple path segment is
either loop-free or if there is a loop, only one node is involved.
4. A du path from node i to k is a path segment such that if the last link has a
computational use of X, then the path is simple and definition-clear; if the penultimate
(last but one) node is j - that is, the path is (i,p,q,...,r,s,t,j,k) and link (j,k) has a predicate
use - then the path from i to j is both loop-free and definition- clear.

STRATEGIES: The structural test strategies discussed below are based on the program's control
flow graph. They differ in the extent to which predicate uses and/or computational uses of variables
are included in the test set. Various types of data flow testing strategies in decreasing order of their
effectiveness are:

All - du Paths (ADUP): The all-du-paths (ADUP) strategy is the strongest data-flow testing strategy
discussed here. It requires that every du path from every definition of every variable to every some
test.

46
For variable X and Y:In Figure 3.9, because variables X and Y are used only on link (1,3), any test that
starts at the entry satisfies this criterion (for variables X and Y, but not for all variables as required by
the strategy).

For variable Z: The situation for variable Z (Figure 3.10) is more complicated because the variable is
redefined in many places. For the definition on link (1,3) we must exercise paths that include subpaths
(1,3,4) and (1,3,5). The definition on link (4,5) is covered by any path that includes (5,6), such as
subpath (1,3,4,5,6, ...). The (5,6) definition requires paths that include subpaths (5,6,7,4) and (5,6,7,8).

For variable V: Variable V (Figure 3.11) is defined only once on link (1,3). Because V has a predicate
use at node 12 and the subsequent path to the end must be forced for both directions at node 12, the
all- du-paths strategy for this variable requires that we exercise all loop-free entry/exit paths and at
least one path that includes the loop caused by (11,4).

Note that we must test paths that include both subpaths (3,4,5) and (3,5) even though neither of these
has V definitions. They must be included because they provide alternate du paths to the V use on link
(5,6). Although (7,4) is not used in the test set for variable V, it will be included in the test set that
covers the predicate uses of array variable V() and U.

The all-du-paths strategy is a strong criterion, but it does not take as many tests as it might seem at
first because any one test simultaneously satisfies the criterion for several definitions and uses of
several different variables.

All Uses Startegy (AU):The all uses strategy is that at least one definition clear path from every
definition of every variable to every use of that definition be exercised under some test.

Just as we reduced our ambitions by stepping down from all paths (P) to branch coverage (C2), say,
we can reduce the number of test cases by asking that the test set should include at least one path
segment from every definition to every use that can be reached by that definition.

For variable V: In Figure 3.11, ADUP requires that we include subpaths (3,4,5) and (3,5) in some test
because subsequent uses of V, such as on link (5,6), can be reached by either alternative. In AU either
(3,4,5) or (3,5) can be used to start paths, but we don't have to use both. Similarly, we can skip the
(8,10) link if we've included the (8,9,10) subpath.

Note the hole. We must include (8,9,10) in some test cases because that's the only way to reach the c
use at link (9,10) - but suppose our bug for variable V is on link (8,10) after all? Find a covering set of
paths under AU for Figure 3.11.

All p-uses/some c-uses strategy (APU+C) : For every variable and every definition of that variable,
include at least one definition free path from the definition to every predicate use; if there are
definitions of the variables that are not covered by the above prescription, then add computational use
test cases as required to cover every definition.

47
For variable Z:In Figure 3.10, for APU+C we can select paths that all take the upper link (12,13) and
therefore we do not cover the c-use of Z: but that's okay according to the strategy's definition because
every definition is covered.

Links (1,3), (4,5), (5,6), and (7,8) must be included because they contain definitions for variable
Z. Links (3,4), (3,5), (8,9), (8,10), (9,6), and (9,10) must be included because they contain predicate
uses of Z. Find a covering set of test cases under APU+C for all variables in this example - it only
takes two tests.

For variable V:In Figure 3.11, APU+C is achieved for V by


(1,3,5,6,7,8,10,11,4,5,6,7,8,10,11,12[upper], 13,2) and (1,3,5,6,7,8,10,11,12[lower], 13,2). Note
that the c-use at (9,10) need not be included under the APU+C criterion.

All c-uses/some p-uses strategy (ACU+P) : The all c-uses/some p-uses strategy (ACU+P) is to first
ensure coverage by computational use cases and if any definition is not covered by the previously
selected paths, add such predicate use cases as are needed to assure that every definition is included in
some test.

For variable Z: In Figure 3.10, ACU+P coverage is achieved for Z by path (1,3,4,5,6,7,8,10,
11,12,13[lower], 2), but the predicate uses of several definitions are not covered. Specifically, the (1,3)
definition is not covered for the (3,5) p-use, the (7,8) definition is not covered for the (8,9), (9,6) and
(9, 10) p-uses.

The above examples imply that APU+C is stronger than branch coverage but ACU+P may be weaker
than, or incomparable to, branch coverage.

All Definitions Strategy (AD) : The all definitions strategy asks only every definition of every
variable be covered by at least one use of that variable, be that use a computational use or a predicate use.

For variable Z: Path (1,3,4,5,6,7,8, . . .) satisfies this criterion for variable Z, whereas any entry/exit path
satisfies it for variable V.
From the definition of this strategy we would expect it to be weaker than bothACU+P and APU+C.

1. All Predicate Uses (APU), All Computational Uses (ACU) Strategies : The all predicate uses
strategy is derived from APU+C strategy by dropping the requirement that we include a c- use for the
variable if there are no p-uses for the variable. The all computational uses strategy is derived from
ACU+P strategy by dropping the requirement that we include a p-use for the variable if there are no c-
uses for the variable.

It is intuitively obvious that ACU should be weaker than ACU+P and that APU should be weaker than
APU+C.

48
ORDERING THE STRATEGIES:

Figure 3.12compares path-flow and data-flow testing strategies. The arrows denote that the strategy at
the arrow's tail is stronger than the strategy at the arrow's head

Figure 3.9: Relative Strength of Structural Test Strategies.

o The right-hand side of this graph, along the path from "all paths" to "all statements" is
the more interesting hierarchy for practical applications.
o Note that although ACU+P is stronger than ACU, both are incomparable to the
predicate-biased strategies. Note also that "all definitions" is not comparable to ACU or
APU.

SLICING AND DICING:

o A (static) program slice is a part of a program (e.g., a selected set of statements)


defined with respect to a given variable X (where X is a simple variable or a data
vector) and a statement i: it is the set of all statements that could (potentially, under
static analysis) affect the value of X at statement i - where the influence of a faulty
statement could result from an improper computational use or predicate use of some
other variables at prior statements.
o If X is incorrect at statement i, it follows that the bug must be in the program slice for X
with respect to i
o A program dice is a part of a slice in which all statements which are known to be
correct have been removed.
o In other words, a dice is obtained from a slice by incorporating information obtained
through testing or experiment (e.g., debugging).

49
o The debugger first limits her scope to those prior statements that could have caused the
faulty value at statement i (the slice) and then eliminates from further consideration
those statements that testing has shown to be correct.
o Debugging can be modeled as an iterative procedure in which slices are further refined
by dicing, where the dicing information is obtained from ad hoc tests aimed primarily
at eliminating possibilities. Debugging ends when the dice has been reduced to the one
faulty statement.

o Dynamic slicing is a refinement of static slicing in which only statements on


achievable paths to the statement in question are included.

50
DOMAIN TESTING

DOMAINS AND PATHS:


 INTRODUCTION:
o Domain: In mathematics, domain is a set of possible values of an independent
variable or the variables of a function.
o Programs as input data classifiers: domain testing attempts to determine whether
the classification is or is not correct.
o Domain testing can be based on specifications or equivalent
implementation information.
o If domain testing is based on specifications, it is a functional test technique.
o If domain testing is based implementation details, it is a structural test technique.
o For example, you're doing domain testing when you check extreme values of an
input variable.
All inputs to a program can be considered as if they are numbers. For example, a character string
can be treated as a number by concatenating bits and looking at them as if they were a binary
integer. This is the view in domain testing, which is why this strategy has a mathematical
flavor.

 THE MODEL: The following figure is a schematic representation of domain testing.

Figure 3.10: Schematic Representation of Domain Testing.

o Before doing whatever it does, a routine must classify the input and set it moving on
the right path.

51
o An invalid input (e.g., value too big) is just a special processing case called 'reject'.
o The input then passes to a hypothetical subroutine rather than on calculations.
o In domain testing, we focus on the classification aspect of the routine rather than on
the calculations.
o Structural knowledge is not needed for this model - only a consistent,
complete specification of input values for each case.
o We can infer that for each case there must be at least one path to process that case.
 A DOMAIN IS A SET:
o An input domain is a set.
o If the source language supports set definitions (E.g. PASCAL set types and C
enumerated types) less testing is needed because the compiler does much of it for
us.
o Domain testing does not work well with arbitrary discrete sets of data objects.
o Domain for a loop-free program corresponds to a set of numbers defined over the
input vector.

 DOMAINS, PATHS AND PREDICATES:


o In domain testing, predicates are assumed to be interpreted in terms of input vector
variables.
o If domain testing is applied to structure, then predicate interpretation must be based on
actual paths through the routine - that is, based on the implementation control flow
graph.
o Conversely, if domain testing is applied to specifications, interpretation is based on a
specified data flow graph for the routine; but usually, as is the nature of specifications,
no interpretation is needed because the domains are specified directly.
o For every domain, there is at least one path through the routine.
o There may be more than one path if the domain consists of disconnected parts or if
the domain is defined by the union of two or more domains.
o Domains are defined their boundaries. Domain boundaries are also where most
domain bugs occur.
o For every boundary there is at least one predicate that specifies what numbers belong
to the domain and what numbers don't.
For example, in the statement IF x>0 THEN ALPHA ELSE BETA we know that numbers
greater than zero belong to ALPHA processing domain(s) while zero and smaller
numbers belong to BETA domain(s).
o A domain may have one or more boundaries - no matter how many variables define it.
For example, if the predicate is x2 + y2 < 16, the domain is the inside of a circle of
radius 4 about the origin. Similarly, we could define a spherical domain with one
boundary but in three variables.
o Domains are usually defined by many boundary segments and therefore by many
predicates. i.e. the set of interpreted predicates traversed on that path (i.e., the path's
predicate expression) defines the domain's boundaries.

 A DOMAIN CLOSURE:
o A domain boundary is closed with respect to a domain if the points on the
boundary belong to the domain.
o If the boundary points belong to some other domain, the boundary is said to be open.

52
o Figure 4.2 shows three situations for a one-dimensional domain - i.e., a domain
defined over one input variable; call it x
The importance of domain closure is that incorrect closure bugs are frequent domain bugs. For example,
x >= 0 when x > 0 was intended

Figure 3.11: Open and Closed Domains.

 DOMAIN DIMENSIONALITY:
o Every input variable adds one dimension to the domain.
o One variable defines domains on a number line.
o Two variables define planardomains.
o Three variables define soliddomains.
o Every new predicate slices through previously defined domains and cuts them in half.
o Every boundary slices through the input vector space with a dimensionality which is
less than the dimensionality of the space.
o Thus, planes are cut by lines and points, volumes by planes, lines and points and
n- spaces by hyperplanes.
 BUG ASSUMPTION:
o The bug assumption for the domain testing is that processing is okay but the
domain definition is wrong.
o An incorrectly implemented domain means that boundaries are wrong, which may
in turn mean that control flow predicates are wrong.
o Many different bugs can result in domain errors. Some of them are:

Domain Errors:
 Double Zero Representation: In computers or Languages that have a distinct positive and
negative zero, boundary errors for negative zero are common.
 Floating point zero check: A floating point number can equal zero only if the previous
definition of that number set it to zero or if it is subtracted from itself or multiplied by zero. So
the floating points zero check to be done against an epsilon value.

 Contradictory domains: An implemented domain can never be ambiguous or contradictory,


but a specified domain can. A contradictory

53
domain specification means that at least two supposedly distinct domains overlap.
 Ambiguous domains: Ambiguous domains mean that union of the domains is incomplete.
That is there are missing domains or holes in the specified domains. Not specifying what
happens to points on the domain boundary is a common ambiguity.
 Over specified Domains: his domain can be overloaded with so many conditions that the
result is a null domain. Another way to put it is to say that the domain's path is unachievable.

 Boundary Errors: Errors caused in and around the boundary of a domain. Example,
boundary closure bug, shifted, tilted, missing, extra boundary.
 Closure Reversal: A common bug. The predicate is defined in terms of
>=. The programmer chooses to implement the logical complement and incorrectly uses <= for
the new predicate; i.e., x >= 0 is incorrectly negated as x <= 0, thereby shifting boundary
values to adjacent domains.
 Faulty Logic: Compound predicates (especially) are subject to faulty logic transformations
and improper simplification. If the predicates define domain boundaries, all kinds of domain
bugs can result from faulty logic manipulations.

 RESTRICTIONS TO DOMAIN TESTING: Domain testing has restrictions, as do other


testing techniques. Some of them include:
o Co-incidental Correctness: Domain testing isn't good at finding bugs for which the
outcome is correct for the wrong reasons. If we're plagued by coincidental correctness
we may misjudge an incorrect boundary. Note that this implies weakness for domain
testing when dealing with routines that have binary outcomes (i.e., TRUE/FALSE)
o Representative Outcome: Domain testing is an example of partition testing.
Partition-testing strategies divide the program's input space into domains such that all
inputs within a domain are equivalent (not equal, but equivalent) in the sense that any
input represents all inputs in that domain.
o If the selected input is shown to be correct by a test, then processing is presumed
correct, and therefore all inputs within that domain are expected (perhaps unjustifiably)
to be correct. Most test techniques, functional or structural, fall under partition testing
and therefore make this representative outcome assumption. For example, x 2 and 2x are
equal for x = 2, but the functions are different. The functional differences between
adjacent domains are usually simple, such as x + 7 versus x + 9, rather than x 2 versus
2x.

Simple Domain Boundaries and Compound Predicates: Compound predicates in which each
part of the predicate specifies a different boundary are not a problem: for example, x
>= 0 AND x < 17, just specifies two domain boundaries by one compound predicate. As

54
an example of a compound predicate that specifies one boundary, consider: x = 0 AND y
>= 7 AND y <= 14. This predicate specifies one boundary equation (x = 0) but alternates
closure, putting it in one or the other domain depending on whether y < 7 or y > 14. Treat
compound predicates with respect because they’re more complicated than they seem.

o Functional Homogeneity of Bugs: Whatever the bug is, it will not change the
functional form of the boundary predicate. For example, if the predicate is ax >= b, the
bug will be in the value of a or b but it will not change the predicate to ax
>= b, say.

o Linear Vector Space: Most papers on domain testing, assume linear boundaries - not a
bad assumption because in practice most boundary predicates are linear.

o Loop Free Software: Loops are problematic for domain testing. The trouble with
loops is that each iteration can result in a different predicate expression (after
interpretation), which means a possible domain boundary change.

NICE AND UGLY DOMAINS:

 NICE DOMAINS:
o Where do these domains come from?
Domains are and will be defined by an imperfect iterative process aimed at achieving
(user, buyer, voter) satisfaction.
o Implemented domains can't be incomplete or inconsistent. Every input will be
processed (rejection is a process), possibly forever. Inconsistent domains will be made
consistent.
o Conversely, specified domains can be incomplete and/or inconsistent. Incomplete in
this context means that there are input vectors for which no path is specified, and
inconsistent means that there are at least two contradictory specifications over the same
segment of the input space.
o Some important properties of nice domains are: Linear, Complete, Systematic, And
Orthogonal, Consistently closed, Convex and simply connected.
o To the extent that domains have these properties domain testing is easy as testing gets.
o The bug frequency is lesser for nice domain than for ugly domains.

Figure 3.12: Nice Two-Dimensional Domains.

55
 LINEAR AND NON LINEAR BOUNDARIES:
o Nice domain boundaries are defined by linear inequalities or equations.
o The impact on testing stems from the fact that it takes only two points to determine a
straight line and three points to determine a plane and in general n+ 1 point to
determine an n-dimensional hyper plane.
o In practice more than 99.99% of all boundary predicates are either linear or can be
liberalized by simple variable transformations.

 COMPLETE BOUNDARIES:
o Nice domain boundaries are complete in that they span the number space from plus to
minus infinity in all dimensions.
o Figure 4.4 shows some incomplete boundaries. Boundaries A and E have gaps.
o Such boundaries can come about because the path that hypothetically corresponds to
them is unachievable, because inputs are constrained in such a way that such values
can't exist, because of compound predicates that define a single boundary, or because
redundant predicates convert such boundary values into a null set.
o The advantage of complete boundaries is that one set of tests is needed to confirm the
boundary no matter how many domains it bounds.
o If the boundary is chopped up and has holes in it, then every segment of that boundary
must be tested for every domain it bounds.

Figure 3.13: Incomplete Domain Boundaries.

 SYSTEMATIC BOUNDARIES:
o Systematic boundary means that boundary inequalities related by a simple function
such as a constant.
In Figure 4.3 for example, the domain boundaries for u and v differ only by a
constant.

56
o where fi is an arbitrary linear function, X is the input vector, ki and c are constants, and
g(i,c) is a decent function over i and c that yields a constant, such as k + ic.
o The first example is a set of parallel lines, and the second example is a set of
systematically (e.g., equally) spaced parallel lines (such as the spokes of a wheel, if
equally spaced in angles, systematic).
o If the boundaries are systematic and if you have one tied down and generate tests for it,
the tests for the rest of the boundaries in that set can be automatically generated.

 ORTHOGONAL BOUNDARIES:
o Two boundary sets U and V (See Figure 4.3) are said to be orthogonal if every
inequality in V is perpendicular to every inequality in U.
o If two boundary sets are orthogonal, then they can be tested independently
o In Figure 4.3 we have six boundaries in U and four in V. We can confirm the boundary
properties in a number of tests proportional to 6 + 4 = 10 (O(n)). If we tilt the
boundaries to get Figure 4.5,
o we must now test the intersections. We've gone from a linear number of cases to a
quadratic: from O(n) to O(n2).

Figure 3.14: Tilted Boundaries.

Figure 3.15: Linear, Non-orthogonal Domain Boundaries.

57
o Actually, there are two different but related orthogonality conditions. Sets of
boundaries can be orthogonal to one another but not orthogonal to the coordinate axes
(condition 1), or boundaries can be orthogonal to the coordinate axes (condition 2).

 CLOSURE CONSISTENCY:
o Figure 4.6 shows another desirable domain property: boundary closures are
consistent and systematic.
o The shaded areas on the boundary denote that the boundary belongs to the domain
in which the shading lies - e.g., the boundary lines belong to the domains on the
right.
o Consistent closure means that there is a simple pattern to the closures - for
example, using the same relational operator for all boundaries of a set of parallel
boundaries.

 CONVEX:
o A geometric figure (in any number of dimensions) is convex if you can take two
arbitrary points on any two different boundaries, join them by a line and all points on
that line lie within the figure.
o Nice domains are convex; dirty domains aren't.
o You can smell a suspected concavity when you see phrases such as: ". . . except if
. . .," "However . . .," ". . . but not. . . ." In programming, it's often the buts in the
specification that kill you.

 SIMPLY CONNECTED:
o Nice domains are simply connected; that is, they are in one piece rather than pieces all
over the place interspersed with other domains.
o Simple connectivity is a weaker requirement than convexity; if a domain is convex it is
simply connected, but not vice versa.
o Consider domain boundaries defined by a compound predicate of the (Boolean) form
ABC. Say that the input space is divided into two domains, one defined by ABC and,
therefore, the other defined by its negation.
o For example, suppose we define valid numbers as those lying between 10 and 17
inclusive. The invalid numbers are the disconnected domain consisting of numbers less
than 10 and greater than 17.
o Simple connectivity, especially for default cases, may be impossible.

 UGLY DOMAINS:
o Some domains are born ugly and some are uglified by bad specifications.
o Every simplification of ugly domains by programmers can be either good orbad.
o Programmers in search of nice solutions will "simplify" essential complexity out of
existence. Testers in search of brilliant insights will be blind to essential complexity
and therefore miss important cases.
o If the ugliness results from bad specifications and the programmer's simplification is
harmless, then the programmer has made ugly good.

58
o But if the domain's complexity is essential (e.g., the income tax code),
such "simplifications" constitute bugs.
o Nonlinear boundaries are so rare in ordinary programming that there's no
information on how programmers might "correct" such boundaries if they're
essential.

 AMBIGUITIES AND CONTRADICTIONS:


o Domain ambiguities are holes in the input space.
o The holes may lie within the domains or in cracks between domains.
o Two kinds of contradictions are possible: overlapped domain specifications
and overlapped closure specifications
o Figure 4.7c shows overlapped domains and Figure 4.7d shows dual closure assignment.

Figure 3.16: Domain Ambiguities and Contradictions.

 SIMPLIFYING THE TOPOLOGY:


o The programmer's and tester's reaction to complex domains is the same - simplify
o There are three generic cases: concavities, holes and disconnected pieces.
o Programmers introduce bugs and testers misdesign test cases by: smoothing out
concavities (Figure 4.8a), filling in holes (Figure 4.8b), and joining disconnected pieces
(Figure 4.8c).

Figure 3.17: Simplifying the topology.

59
 RECTIFYING BOUNDARY CLOSURES:
o If domain boundaries are parallel but have closures that go every which way (left,
right, left . . .) the natural reaction is to make closures go the same way (see Figure

4.9).
Figure 3.18: Forcing Closure Consistency.

DOMAIN TESTING:

 DOMAIN TESTING STRATEGY: The domain-testing strategy is simple, although


possibly tedious (slow).
o Domains are defined by their boundaries; therefore, domain testing concentrates
test points on or near boundaries.
o Classify what can go wrong with boundaries, then define a test strategy for each
case. Pick enough points to test for all recognized kinds of boundary errors.
o Because every boundary serves at least two different domains, test points used to
check one domain can also be used to check adjacent domains. Remove redundant test
points.
o Run the tests and by posttest analysis (the tedious part) determine if any boundaries
are faulty and if so, how.
o Run enough tests to verify every boundary of everydomain.

 DOMAIN BUGS AND HOW TO TEST FOR THEM:


o An interior point (Figure 4.10) is a point in the domain such that all points within
an arbitrarily small distance (called an epsilon neighborhood) are also in the domain.
o A boundary point is one such that within an epsilon neighborhood there are
points both in the domain and not in the domain.
o An extreme point is a point that does not lie between any two other arbitrary
but distinct points of a (convex) domain.

60
Figure 3.19: Interior, Boundary and Extreme points.
o An on point is a point on the boundary.
o If the domain boundary is closed, an off point is a point near the boundary but in the
adjacent domain.
o If the boundary is open, an off point is a point near the boundary but in the domain
being tested; see Figure 4.11. You can remember this by the acronym COOOOI:
Closed Off Outside, Open Off Inside.

Figure 3.20: On points and Off points.


o Figure 4.12 shows generic domain bugs: closure bug, shifted boundaries, tilted
boundaries, extra boundary, missing boundary.

61
Figure 3.21: Generic Domain Bugs.

TESTING ONE DIMENSIONAL DOMAIN:

The closure can be wrong (i.e., assigned to the wrong domain) or the boundary (a point in this case) can
be shifted one way or the other, we can be missing a boundary, or we can have an extra boundary.
1. Figure 4.13 shows possible domain bugs for a one-dimensional open domain boundary.
2. In Figure 4.13a we assumed that the boundary was to be open for A. The bug we're
looking for is a closure error, which converts > to >= or < to <= (Figure 4.13b). One
test (marked x) on the boundary point detects this bug because processing for that point
will go to domain A rather than B.
3. In Figure 4.13c we've suffered a boundary shift to the left. The test point we used for
closure detects this bug because the bug forces the point from the B domain, where it
should be, to A processing. Note that we can't distinguish between a shift and a closure
error, but we do know that we have a bug.

62
Figure 3.22: One Dimensional Domain Bugs, Open Boundaries.
4. Figure 4.13d shows a shift the other way. The on point doesn't tell us anything because
the boundary shift doesn't change the fact that the test point will be processed in B. To
detect this shift we need a point close to the boundary but within A. The boundary is
open, therefore by definition, the off point is in A (Open Off Inside).
5. The same open off point also suffices to detect a missing boundary because what
should have been processed in A is now processed in B.
6. To detect an extra boundary we have to look at two domain boundaries. In this context
an extra boundary means that A has been split in two. The two off points that we
selected before (one for each boundary) does the job. If point C had been a closed
boundary, the on test point at C would do it.
7. For closed domains look at Figure 4.14. As for the open boundary, a test point on the
boundary detects the closure bug. The rest of the cases are similar to the open
boundary, except now the strategy requires off points just outside the domain.

63
Figure 3.23: One Dimensional Domain Bugs, Closed Boundaries.

 TESTING TWO DIMENSIONAL DOMAINS:

1. Figure 4.15 shows possible domain boundary bugs for a two-dimensional domain.
2. A and B are adjacent domains and the boundary is closed with respect to A,
which means that it is open with respect to B.

Figure 3.24: Two Dimensional Domain Bugs.


3. For Closed Boundaries:
Closure Bug: Figure 4.15a shows a faulty closure, such as might be caused by using a wrong
operator (for example, x >= k when x > k was intended, or vice

64
versa). The two on points detect this bug because those values will get B rather than A
processing.

1. Shifted Boundary: In Figure 4.15b the bug is a shift up, which converts part of
domain B into A processing, denoted by A'. This result is caused by an incorrect
constant in a predicate, such as x + y >= 17 when x + y >= 7 was intended. The
off point (closed off outside) catches this bug. Figure 4.15c shows a shift down
that is caught by the two on points.
2. Tilted Boundary: A tilted boundary occurs when coefficients in the boundary
inequality are wrong. For example, 3x + 7y > 17 when 7x + 3y >
17 was intended. Figure 4.15d has a tilted boundary, which creates erroneous
domain segments A' and B'. In this example the bug is caught by the left on
point.
3. Extra Boundary: An extra boundary is created by an extra predicate. An extra
boundary will slice through many different domains and will therefore cause
many test failures for the same bug. The extra boundary in Figure 4.15e is
caught by two on points, and depending on which way the extra boundary goes,
possibly by the off point also.
4. Missing Boundary: A missing boundary is created by leaving a boundary
predicate out. A missing boundary will merge different domains and will cause
many test failures although there is only one bug. A missing boundary, shown in
Figure 4.15f, is caught by the two on points because the processing for A and B
is the same - either A or B processing.

 PROCEDURE FOR TESTING: The procedure is conceptually is straight forward. It can be


done by hand for two dimensions and for a few domains and practically impossible for more
than two variables.
1 Identify input variables.
2 Identify variable which appear in domain defining predicates, such as control
flow predicates.
3 Interpret all domain predicates in terms of input variables.
4 For p binary predicates, there are at most 2p combinations of TRUE-FALSE values
and therefore, at most 2p domains. Find the set of all non null domains. The result is
a boolean expression in the predicates consisting a set of AND terms joined by
OR's. For example ABC+DEF+GHI Where the capital letters denote predicates.
Each product term is a set of linear inequality that defines a domain or a part of a
multiply connected domains.
5 Solve these inequalities to find all the extreme points of each domain using any of
the linear programming methods.

DOMAIN AND INTERFACE TESTING

 INTRODUCTION:
o Recall that we defined integration testing as testing the correctness of the interface
between two otherwise correct components.

65
o Components A and B have been demonstrated to satisfy their component tests, and as
part of the act of integrating them we want to investigate possible inconsistencies
across their interface.
o Interface between any two components is considered as a subroutine call.
o We're looking for bugs in that "call" when we do interface testing.
o Let's assume that the call sequence is correct and that there are no type
incompatibilities.
o For a single variable, the domain span is the set of numbers between (and including)
the smallest value and the largest value. For every input variable we want (at least):
compatible domain spans and compatible closures (Compatible but need not be Equal).
 DOMAINS AND RANGE:
o The set of output values produced by a function is called the range of the function, in
contrast with the domain, which is the set of input values over which the function is
defined.
o For most testing, our aim has been to specify input values and to predict and/or confirm
output values that result from those inputs.
o Interface testing requires that we select the output values of the calling routine i.e.
caller's range must be compatible with the called routine's domain.
o An interface test consists of exploring the correctness of the following mappings: caller
domain --> caller range (caller unit test)
caller range --> called domain (integration test) called domain --> called
range (called unit test)
 CLOSURE COMPATIBILITY:
o Assume that the caller's range and the called domain spans the same numbers - for
example, 0 to 17.
o Figure 4.16 shows the four ways in which the caller's range closure and the called's
domain closure can agree.
o The thick line means closed and the thin line means open. Figure 4.16 shows the four
cases consisting of domains that are closed both on top (17) and bottom (0), open top
and closed bottom, closed top and open bottom, and open top and bottom.

Figure 3.25: Range / Domain Closure Compatibility.


o Figure 4.17 shows the twelve different ways the caller and the called can disagree
about closure. Not all of them are necessarily bugs. The four cases in whicha

66
caller boundary is open and the called is closed (marked with a "?") are probably not
buggy. It means that the caller will not supply such values but the called can accept
them.

Figure 3.26: Equal-Span Range / Domain Compatibility Bugs.

 SPAN COMPATIBILITY:
o Figure 4.18 shows three possibly harmless span incompatibilities.

Figure 3.27: Harmless Range / Domain Span incompatibility bug (Caller Span is
smaller than Called).
o In all cases, the caller's range is a subset of the called's domain. That's not necessarily a
bug.
o The routine is used by many callers; some require values inside a range and some don't.
This kind of span incompatibility is a bug only if the caller expects the called routine to
validate the called number for the caller.
o Figure 4.19a shows the opposite situation, in which the called routine's domain has a
smaller span than the caller expects. All of these examples are buggy.

67
Figure 3.28: Buggy Range / Domain Mismatches
o In Figure 4.19b the ranges and domains don't line up; hence good values are rejected,
bad values are accepted, and if the called routine isn't robust enough, we have
crashes.
o Figure 4.19c combines these notions to show various ways we can have holes in
the domain: these are all probably buggy.

 INTERFACE RANGE / DOMAIN COMPATIBILITY TESTING:


o For interface testing, bugs are more likely to concern single variables rather than
peculiar combinations of two or more variables.
o Test every input variable independently of other input variables to confirm
compatibility of the caller's range and the called routine's domain span and closure of
every domain defined for that variable.
o There are two boundaries to test and it's a one-dimensional domain; therefore, it
requires one on and one off point per boundary or a total of two on points and two off
points for the domain - pick the off points appropriate to the closure (COOOOI).
o Start with the called routine's domains and generate test points in accordance to the
domain-testing strategy used for that routine in component testing.
o Unless you're a mathematical whiz you won't be able to do this without tools for more
than one variable at a time.

68
UNIT IV
PATHS, PATH PRODUCTS AND REGULAR EXPRESSIONS

PATH PRODUCTS AND PATH EXPRESSION:

 MOTIVATION:
o Flow graphs are being an abstract representation of programs.
o Any question about a program can be cast into an equivalent question about
an appropriate flowgraph.
o Most software development, testing and debugging tools use flow graphs
analysis techniques.

 PATH PRODUCTS:
o Normally flow graphs used to denote only control flow connectivity.
o The simplest weight we can give to a link is a name.
o Using link names as weights, we then convert the graphical flow graph into an
equivalent algebraic like expressions which denotes the set of all possible paths from
entry to exit for the flow graph.
o Every link of a graph can be given a name.
o The link name will be denoted by lower case italic letters In tracing a path or path
segment through a flow graph, you traverse a succession of link names.
o The name of the path or path segment that corresponds to those links is expressed
naturally by concatenating those link names.
o For example, if you traverse links a,b,c and d along some path, the name for that path
segment is abcd. This path name is also called a path product. Figure 5.1 shows some
examples:

Figure 4.1: Examples of paths.

69
 PATH EXPRESSION:
o Consider a pair of nodes in a graph and the set of paths between those node.
o Denote that set of paths by Upper case letter such as X,Y. From Figure 5.1c,
the members of the path set can be listed as follows:
ac, abc, abbc, abbbc, abbbbc.............
o Alternatively, the same set of paths can be denoted by :
ac+abc+abbc+abbbc+abbbbc+...........
o The + sign is understood to mean "or" between the two nodes of interest, paths ac,
or abc, or abbc, and so on can be taken.
o Any expression that consists of path names and "OR"s and which denotes a set of
paths between two nodes is called a "Path Expression”.

 PATH PRODUCTS:
o The name of a path that consists of two successive path segments is
conveniently expressed by the concatenation or Path Product of the segment
names.
o For example, if X and Y are defined as X=abcde,Y=fghij,then the path corresponding
to X followed by Y is denoted by
XY=abcdefghij
o Similarly, YX=fghijabcde aX=aabcde Xa=abcdea XaX=abcdeaabcde
o If X and Y represent sets of paths or path expressions, their product represents the set of
paths that can be obtained by following every element of X by any element of Y in all
possible ways. For example,
o X = abc + def + ghi
o Y = uvw + z Then,
XY = abcuvw + defuvw + ghiuvw + abcz + defz + ghiz
o If a link or segment name is repeated, that fact is denoted by an exponent. The
exponent's value denotes the number of repetitions:
o a1 = a; a2 = aa; a3 = aaa; an = aaaa n times. Similarly, if X = abcde then

X1 = abcde
X2 = abcdeabcde = (abcde)2
X3 = abcdeabcdeabcde = (abcde)2abcde
= abcde(abcde)2 = (abcde)3
o The path product is not commutative (that is XY!=YX).
o The path product is Associative.
RULE 1: A(BC)=(AB)C=ABC
where A,B,C are path names, set of path names or path expressions.
o The zeroth power of a link name, path product, or path expression is also needed for
completeness. It is denoted by the numeral "1" and denotes the "path" whose length is
zero - that is, the path that doesn't have any links.

70
o a0 = 1
o X0 = 1

 PATH SUMS:
o The "+" sign was used to denote the fact that path names were part of the same set
of paths.
o The "PATH SUM" denotes paths in parallel between nodes.
o Links a and b in Figure 5.1a are parallel paths and are denoted by a + b. Similarly,
links c and d are parallel paths between the next two nodes and are denoted by c + d.
o The set of all paths between nodes 1 and 2 can be thought of as a set of parallel
paths and denoted by eacf+eadf+ebcf+ebdf.
o If X and Y are sets of paths that lie between the same pair of nodes, then X+Y
denotes the UNION of those set of paths. For example, in Figure 5.2:

Figure 4.2: Examples of path sums.


The first set of parallel paths is denoted by X + Y + d and the second set by U + V
+ W + h + i + j. The set of all paths in this flowgraph is f(X + Y + d)g(U + V + W
+ h + i + j)k
o The path is a set union operation, it is clearly Commutative and Associative.
o RULE 2: X+Y=Y+X
o RULE 3: (X+Y)+Z=X+(Y+Z)=X+Y+Z

 DISTRIBUTIVE LAWS:
o The product and sum operations are distributive, and the ordinary rules of
multiplication apply; that is
RULE 4: A(B+C)=AB+AC and (B+C)D=BD+CD
o Applying these rules to the below Figure 5.1a yields
o e(a+b)(c+d)f=e(ac+ad+bc+bd)f = eacf+eadf+ebcf+ebdf

 ABSORPTION RULE:
o If X and Y denote the same set of paths, then the union of these sets is
unchanged; consequently,
RULE 5: X+X=X (Absorption Rule)
o If a set consists of paths names and a member of that set is added to it, the "new"
name, which is already in that set of names, contributes nothing and can be ignored.
o For example,
o if X=a+aa+abc+abcd+def then
X+a = X+aa = X+abc = X+abcd = X+def = X
It follows that any arbitrary sum of identical path expressions reduces to the same path
expression.

71
 LOOPS:
Loops can be understood as an infinite set of parallel paths. Say that the loop consists of a
single link b. then the set of all paths through that loop point is

b0+b1+b2+b3+b4+b5+..............
Figure 4.3: Examples of path loops.
This potentially infinite sum is denoted by b* for an individual link and by X*

Figure 4.4: Another example of path loops.


o The path expression for the above figure is denoted by the notation:
ab*c=ac+abc+abbc+abbbc+................
o Evidently,
aa*=a*a=a+ and XX*=X*X=X+
o It is more convenient to denote the fact that a loop cannot be taken more than a
certain, say n, number of times.
o A bar is used under the exponent to denote the fact as follows: Xn =
X0+X1+X2+X3+X4+X5+...................+Xn

RULES 6 - 16:
o The following rules can be derived from the previous rules:
o RULE 6: Xn + Xm = Xn if n>m RULE 6: Xn + Xm = Xm if m>n RULE 7: XnXm = Xn+m
RULE 8: XnX* = X*Xn = X* RULE 9: XnX+ = X+Xn = X+ RULE 10: X*X+ = X+X* = X+
RULE 11: 1 + 1 = 1
RULE 12: 1X = X1 = X
Following or preceding a set of paths by a path of zero length does not change the set.
RULE 13: 1n = 1n = 1* = 1+ = 1
No matter how often you traverse a path of zero length,It is a path of zero length.
RULE 14: 1++1 = 1*=1
The null set of paths is denoted by the numeral 0. it obeys the following rules:
RULE 15: X+0=0+X=X
RULE 16: 0X=X0=0
If you block the paths of a graph for or aft by a graph that has no paths , there won’t be
any paths.

72
REDUCTION PROCEDURE:

 REDUCTION PROCEDURE ALGORITHM:


o This section presents a reduction procedure for converting a flowgraph whose links are
labeled with names into a path expression that denotes the set of all entry/exit paths in
that flowgraph. The procedure is a node-by-node removal algorithm.
o The steps in Reduction Algorithm are as follows:
1. Combine all serial links by multiplying their path expressions.
2. Combine all parallel links by adding their path expressions.
3. Remove all self-loops (from any node to itself) by replacing them with a link of
the form X*, where X is the path expression of the link in that loop.

STEPS 4 - 8 ARE IN THE ALGORIHTM'S LOOP:


4. Select any node for removal other than the initial or final node. Replace it with a
set of equivalent links whose path expressions correspond to all the ways you
can form a product of the set of inlinks with the set of outlinks of that node.
5. Combine any remaining serial links by multiplying their path expressions.
6. Combine all parallel links by adding their path expressions.
7. Remove all self-loops as in step 3.
8. Does the graph consist of a single link between the entry node and the exit
node? If yes, then the path expression for that link is a path expression for the
original flowgraph; otherwise, return to step 4.
o A flowgraph can have many equivalent path expressions between a given pair of nodes;
that is, there are many different ways to generate the set of all paths between two nodes
without affecting the content of that set.
o The appearance of the path expression depends, in general, on the order in which nodes
are removed.

 CROSS-TERM STEP (STEP 4):


o The cross - term step is the fundamental step of the reduction algorithm.
o It removes a node, thereby reducing the number of nodes by one.
o Successive applications of this step eventually get you down to one entry and one exit
node. The following diagram shows the situation at an arbitrary node that has been
selected for removal:

o From the above diagram, one can infer:


o (a + b)(c + d + e) = ac + ad + + ae + bc + bd + be

 LOOP REMOVAL OPERATIONS:


o There are two ways of looking at the loop-removal operation:

73
o In the first way, we remove the self-loop and then multiply all outgoing links by Z*.
o In the second way, we split the node into two equivalent nodes, call them A and A' and
put in a link between them whose path expression is Z*. Then we remove node A' using
steps 4 and 5 to yield outgoing links whose path expressions are Z*X and Z*Y.

 A REDUCTION PROCEDURE - EXAMPLE:


o Let us see by applying this algorithm to the following graph where we remove several
nodes in order; that is

Figure 4.5: Example Flowgraph for demonstrating reduction procedure.

o Remove node 10 by applying step 4 and combine by step 5 to yield

o Remove node 9 by applying step4 and 5 to yield

o Remove node 7 by steps 4 and 5, as follows:

74
o Remove node 8 by steps 4 and 5, to obtain:

o PARALLEL TERM (STEP 6):


Removal of node 8 above led to a pair of parallel links between nodes 4 and 5. combine them to
create a path expression for an equivalent link whose path expression is c+gkh; that is

o LOOP TERM (STEP 7):


Removing node 4 leads to a loop term. The graph has now been replaced with the following equivalent
simpler graph:

o Continue the process by applying the loop-removal step as follows:

75
o Removing node 5 produces:

o Remove the loop at node 6 to yield:

o Remove node 3 to yield

o Removing the loop and then node 6 result in the following expression:
a(bgjf)*b(c+gkh)d((ilhd)*imf(bjgf)*b(c+gkh)d)*(ilhd)*e

o You can practice by applying the algorithm on the following flowgraphs and generate
their respective path expressions:

Figure 4.6: Some graphs and their path expressions.

76
APPLICATIONS:
o The purpose of the node removal algorithm is to present one very generalized concept-
the path expression and way of getting it.
o Every application follows this common pattern:
1. Convert the program or graph into a path expression.
2. Identify a property of interest and derive an appropriate set of "arithmetic" rules that
characterizes the property.
Replace the link names by the link weights for the property of interest. The path expression has now
been converted to an expression in some algebra, such as
1. Ordinary algebra, regular expressions, or boolean algebra. This algebraic
expression summarizes the property of interest over the set of allpaths.
2. Simplify or evaluate the resulting "algebraic" expression to answer the question
you asked.

 HOW MANY PATHS IN A FLOW GRAPH ?


o The question is not simple. Here are some ways you could ask it:
1. What is the maximum number of different paths possible?
2. What is the fewest number of paths possible?
3. How many different paths are there really?
4. What is the average number of paths?
o Determining the actual number of different paths is an inherently difficult problem
because there could be unachievable paths resulting from correlated and dependent
predicates.
o If we know both of these numbers (maximum and minimum number of possible paths)
we have a good idea of how complete our testing is.
o Asking for "the average number of paths" is meaningless.

 MAXIMUM PATH COUNT ARITHMETIC:


o Label each link with a link weight that corresponds to the number of paths that link
represents.
o Also mark each loop with the maximum number of times that loop can be taken. If the
answer is infinite, you might as well stop the analysis because it is clear that the
maximum number of paths will be infinite.
o There are three cases of interest: parallel links, serial links, and loops.

o This arithmetic is an ordinary algebra. The weight is the number of paths in each set.
o EXAMPLE:

77
 The following is a reasonably well-structured program.

Each link represents a single link and consequently is given a weight of "1" to
start. Let’s say the outer loop will be taken exactly four times and inner Loop
Can be taken zero or three times Its path expression, with a little work, is:
Path expression: a(b+c)d{e(fi)*fgj(m+l)k}*e(fi)*fgh
 A: The flow graph should be annotated by replacing the link name with the
maximum of paths through that link (1) and also note the number of times for
looping.
 B: Combine the first pair of parallel loops outside the loop and also the pair in
the outer loop.
 C: Multiply the things out and remove nodes to clear the clutter.

1. For the Inner Loop:


D:Calculate the total weight of inner loop, which can execute a min. of 0 times
and max. of 3 times. So, it inner loop can be evaluated as follows:

13 = 10 + 11 + 12 + 13 = 1 + 1 + 1 + 1 = 4
2. E: Multiply the link weights inside the loop: 1 X 4 = 4
3. F: Evaluate the loop by multiplying the link wieghts: 2 X 4 = 8.
4. G: Simpifying the loop further results in the total maximum number of paths
in the flowgraph:

2 X 84 X 2 = 32,768.

78
Alternatively, you could have substituted a "1" for each link in the path expression and then
simplified, as follows:

a(b+c)d{e(fi)*fgj(m+l)k}*e(fi)*fgh
= 1(1 + 1)1(1(1 x 1)31 x 1 x 1(1 + 1)1)41(1 x 1)31 x 1 x 1
= 2(131 x (2))413
= 2(4 x 2)4 x 4
= 2 x 84 x 4 = 32,768
This is the same result we got graphically.Actually, the outer loop should be taken exactly four times.
That doesn't mean it will be taken zero or four times. Consequently, there is a superfluous "4" on the
outlink in the last step. Therefore the maximum number of different paths is 8192 rather than 32,768.

STRUCTURED FLOWGRAPH:
Structured code can be defined in several different ways that do not involve ad-hoc rules such as not
using GOTOs.
A structured flowgraph is one that can be reduced to a single link by successive application of the
transformations of Figure 5.7.

79
Figure 4.7: Structured Flowgraph Transformations.

The node-by-node reduction procedure can also be used as a test for structured code.Flow graphs that
DO NOT contain one or more of the graphs shown below (Figure 5.8) as subgraphs are structured.
1. Jumping into loops
2. Jumping out of loops
3. Branching into decisions
4. Branching out of decisions

Figure 4.8: Un-structured sub-graphs.


LOWER PATH COUNT ARITHMETIC:
A lower bound on the number of paths in a routine can be approximated for structured flow graphs.
The arithmetic is as follows:

80
The values of the weights are the number of members in a set of paths.
EXAMPLE:
 Applying the arithmetic to the earlier example gives us the identical steps unitl
step 3 (C) as below:

 From Step 4, the it would be different from the previous example:

81
 If you observe the original graph, it takes at least two paths to cover and that
it can be done in two paths.
 If you have fewer paths in your test plan than this minimum you
probably haven't covered. It's another check.

CALCULATING THE PROBABILITY:


Path selection should be biased toward the low - rather than the high-probability paths.This raises an
interesting question:

What is the probability of being at a certain point in a routine?

This question can be answered under suitable assumptions primarily that all probabilities involved are
independent, which is to say that all decisions are independent and uncorrelated. We use the same
algorithm as before: node-by-node removal of uninteresting nodes.
Weights, Notations and Arithmetic:
 Probabilities can come into the act only at decisions (including
decisions associated with loops).
 Annotate each outlink with a weight equal to the probability of going in
that direction.
 Evidently, the sum of the outlink probabilities must equal 1
 For a simple loop, if the loop will be taken a mean of N times, the
looping probability is N/(N + 1) and the probability of not looping is
1/(N + 1).
 A link that is not part of a decision node has a probability of 1.
 The arithmetic rules are those of ordinary arithmetic.
82
 In
this table, in case of a loop, PA is the probability of the link leaving the loop and PL is the probability
of looping.
 Th
e rules are those of ordinary probability theory.
1.
If you can do something either from column A with a probability of PA or from column B with
a probability PB, then the probability that you do either is PA + PB.
2.
For the series case, if you must do both things, and their probabilities are independent
(as assumed), then the probability that you do both is the product of their probabilities.
For example, a loop node has a looping probability of PL and a probability of not

looping of PA, which is obviously equal to I - PL.


Following the above rule, all we've done is replace the outgoing probability with 1 - so why the
complicated rule? After a few steps in which you've removed nodes, combined parallel terms,
removed loopsand the like, you might find something like this:

because PL + PA + PB + PC = 1, 1 - PL = PA + PB + PC, and

83
EXAMPLE:
which is what we've postulated for any decision. In other words, division by 1 - PL renormalizes the
outlink probabilities so that their sum equals unity after the loop is removed
.
 Here is a complicated bit of logic. We want to know the probability
associated with cases A, B, and C.

us do this in three parts, starting with case A. Note that the sum of the probabilities at each decision
node is equal to 1. Start by throwing away anything that isn't on the way to case A, and then apply the
reduction procedure. To avoid clutter, we usually leave out probabilities equal to 1.

CASE A:

84
 Case B is simpler:

 Case C is similar and should yield a probability of 1 - 0.125 - 0.158 = 0.717:

 These checks. It's a good idea when doing this sort of thing to calculate all the probabilities
and to verify that the sum of the routine's exit probabilities does equal 1.
 If it doesn't, then you've made calculation error or, more likely, you've left out some bra How
about path probabilities? That's easy. Just trace the path of interest and multiply the probabilities
as you go.
 Alternatively, write down the path name and do the indicated arithmetic operation.
 Say that a path consisted of links a, b, c, d, e, and the associated probabilities were .2, .5, 1.,
.01, and I respectively. Path abcbcbcdeabddea would have a probability of 5 x 10-10.
 Long paths are usually improbable.

85
MEAN PROCESSING TIME OF A ROUTINE:
Given the execution time of all statements or instructions for every link in a flowgraph and the probability
for each direction for all decisions are to find the mean processing time for the routine as a whole.
The model has two weights associated with every link: the processing time for that link, denoted by T, and
the probability of that link P.
The arithmetic rules for calculating the mean time:

EXAMPLE:
1. Start with the original flow graph annotated with probabilities and processing time.

2.Combine the parallel links of the outer loop. The result is just the mean of the processing
times for the links because there aren't any other links leaving the first node. Also combine
the pair of links at the beginning of the flow graph.

3. Combine as many serial links as you can.

86
4. Use the cross-term step to eliminate a node and to create the inner self - loop. 5.Finally,
you can get the mean processing time, by using the arithmetic rules as follows:

PUSH/POP, GET/RETURN:
This model can be used to answer several different questions that can turn up in debugging. It can also
help decide which test cases to design.
The question is:

Given a pair of complementary operations such as PUSH (the stack) and POP (the stack),
considering the set of all possible paths through the routine, what is the net effect of the routine?
PUSH or POP? How many times? Under what conditions?
Here are some other examples of complementary operations to which this model applies:
GET/RETURN a resource block.
OPEN/CLOSE a file.
START/STOP a device or process.
EXAMPLE 1 (PUSH / POP):
 Here is the Push/Pop Arithmetic:

87
 The numeral 1 is used to indicate that nothing of interest (neither PUSH nor POP) occurs on
a given link.
 "H" denotes PUSH and "P" denotes POP. The operations are commutative, associative,
and distributive.

 Consider the following flow graph:

P(P + 1)1{P(HH)n1HP1(P + H)1}n2P(HH)n1HPH


 Si
mplifying by using the arithmetic tables,
= (P2 + P){P(HH)n1(P + H)}n1(HH)n1
= (P2 + P){H2n1(P2 + 1)}n2H2n1
 Bel
ow Table 5.9 shows several combinations of values for the two looping terms - M1 is the number
of times the inner loop will be taken and M2 the number of times the outer loop will be
taken.

88
Figure 4.9: Result of the PUSH / POP Graph Analysis.
 These expressions state that the stack will be popped only if the inner loop is not taken.
 The stack will be left alone only if the inner loop is iterated once, but it may also be pushed.
 For all other values of the inner loop, the stack will only be pushed.

EXAMPLE 2 (GET / RETURN):


 Exactly the same arithmetic tables used for previous example are used for GET / RETURN
a buffer block or resource, or, in fact, for any pair of

89
complementary operations in which the total number of operations in either direction is
cumulative.
 The arithmetic tables for GET/RETURN are:

"G" denotes GET and "R" denotes RETURN.


 Consider the following flowgraph:

 G(
G + R)G(GR)*GGR*R
= G(G + R)G3R*R
= (G + R)G3R*
= (G4 + G2)R*
This expression specifies the conditions under which the resources will be balanced on leaving the
routine.
If the upper branch is taken at the first decision, the second loop must be taken four times. If
the lower branch is taken at the first decision, the second loop must be taken twice.
For any other values, the routine will not balance. Therefore, the first loop does not have to be
instrumented to verify this behavior because its impact should be nil.

LIMITATIONS AND SOLUTIONS:

o The main limitation to these applications is the problem of unachievable paths.


o The node-by-node reduction procedure, and most graph-theory-based algorithms work well
when all paths are possible, but may provide misleading results when some paths are
unachievable.
o The approach to handling unachievable paths (for any application) is to partition the graph into
subgraphs so that all paths in each of the subgraphs are achievable.
o The resulting subgraphs may overlap, because one path may be common to several different
subgraphs.
o Each predicate's truth-functional value potentially splits the graph into two subgraphs. For n
predicates, there could be as many as 2n subgraphs.

90
REGULAR EXPRESSIONS AND FLOW ANOMALY DETECTION:

 THE PROBLEM:
o The generic flow-anomaly detection problem (note: not just data-flow anomalies, but
any flow anomaly) is that of looking for a specific sequence of options considering all
possible paths through a routine.
o Let the operations be SET and RESET, denoted by s and r respectively, and we want to
know if there is a SET followed immediately a SET or a RESET followed immediately
by a RESET (an ss or an rr sequence).
o Some more application examples:
1. A file can be opened (o), closed (c), read (r), or written (w). If the file is read or
written to after it's been closed, the sequence is nonsensical. Therefore, cr and
cw are anomalous. Similarly, if the file is read before it's been written, just after
opening, we may have a bug. Therefore, or is also anomalous. Furthermore, oo
and cc, though not actual bugs, are a waste of time and therefore should also be
examined.
2. A tape transport can do a rewind (d), fast-forward (f), read (r), write (w), stop
(p), and skip (k). There are rules concerning the use of the transport; for
example, you cannot go from rewind to fast-forward without an intervening stop
or from rewind or fast-forward to read or write without an intervening stop. The
following sequences are anomalous: df, dr, dw, fd, and fr. Does the flowgraph
lead to anomalous sequences on any path? If so, what sequences and under what
circumstances?
3. The data-flow anomalies discussed in Unit 4 requires us to detect the dd, dk, kk,
and ku sequences. Are there paths with anomalous data flows?

 THE METHOD:
o Annotate each link in the graph with the appropriate operator or the null operator 1.
o Simplify things to the extent possible, using the fact that a + a = a and 12 = 1.
o You now have a regular expression that denotes all the possible sequences of operators
in that graph. You can now examine that regular expression for the sequences of
interest.
o EXAMPLE: Let A, B, C, be nonempty sets of character sequences whose smallest
string is at least one character long. Let T be a two-character string of characters. Then
if T is a substring of (i.e., if T appears within) AB nC, then T will appear in AB 2C.
(HUANG's Theorem)
As an example, let
o A = pp B = srr C = rp T = ss

The theorem states that ss will appear in pp(srr)nrp if it appears in pp(srr)2rp.

91
o However, let

A = p + pp + ps
B = psr + ps(r + ps) C = rp
T = P4

Is it obvious that there is a p4 sequence in ABnC? The theorem states that we have only
to look at

(p + pp + ps)[psr + ps(r + ps)]2rp

Multiplying out the expression and simplifying shows that there is no p4 Sequence.
o Incidentally, the above observation is an informal proof of the wisdom of looping twice
discussed in Unit 2. Because data-flow anomalies are represented by two- character
sequences, it follows the above theorem that looping twice is what you need to do to
find such anomalies.

 LIMITATIONS:
o Huang's theorem can be easily generalized to cover sequences of greater length than
two characters. Beyond three characters, though, things get complex and this method
has probably reached its utilitarian limit for manual application.
o There are some nice theorems for finding sequences that occur at the beginnings and
ends of strings but no nice algorithms for finding strings buried in an expression.
o Static flow analysis methods can't determine whether a path is or is not achievable.
Unless the flow analysis includes symbolic execution or similar techniques, the impact
of unachievable paths will not be included in the analysis.
The flow-anomaly application, for example, doesn't tell us that there will be a flow anomaly -
it tells us that if the path is achievable, then there will be a flow anomaly. Such analytical
problems go away, of course, if you take the trouble to design routines for which all paths are
achievable.

92
LOGIC BASED TESTING
OVERVIEW OF LOGIC BASED TESTING:

 INTRODUCTION:
o The functional requirements of many programs can be specified by decision tables, which provide
a useful basis for program and test design.
o Consistency and completeness can be analyzed by using boolean algebra, which can also be used as
a basis for test design. Boolean algebra is trivialized by using Karnaugh-Veitch charts.
o "Logic" is one of the most often used words in programmers' vocabularies but one of their least
used techniques.
o Boolean algebra is to logic as arithmetic is to mathematics. Without it, the tester or programmer is
cut off from many test and design techniques and tools that incorporate those techniques.
o Logic has been, for several decades, the primary tool of hardware logic designers.
o Many test methods developed for hardware logic can be adapted to software logic testing. Because
hardware testing automation is 10 to 15 years ahead of software testing automation, hardware testing
methods and its associated theory is a fertile ground for software testing methods.
o As programming and test techniques have improved, the bugs have shifted closer to the process front
end, to requirements and their specifications. These bugs range from 8% to 30% of the total and
because they're first-in and last-out, they're the costliest of all.
o The trouble with specifications is that they're hard to express.
o Boolean algebra (also known as the sentential calculus) is the most basic of all logic systems.
o Higher-order logic systems are needed and used for formal specifications.
o Much of logical analysis can be and is embedded in tools. But these tools incorporate methods to
simplify, transform, and check specifications, and the methods are to a large extent based on boolean
algebra.

o KNOWLEDGE BASED SYSTEM:

 The knowledge-based system (also expert system, or "artificial intelligence" system) has become the
programming construct of choice for many applications that were once considered very difficult.
 Knowledge-based systems incorporate knowledge from a knowledge domain such as medicine, law,
or civil engineering into a database. The data can then be queried and interacted with to provide
solutions to problems in that domain.
 One implementation of knowledge-based systems is to incorporate the expert's knowledge into a set
of rules. The user can then provide data and ask questions based on that data.
 The user's data is processed through the rule base to yield conclusions (tentative or definite) and
requests for more data. The processing is done by a program called the inference engine.
 Understanding knowledge-based systems and their validation problems requires an understanding of
formal logic.
o Decision tables are extensively used in business data processing; Decision-table preprocessors as
extensions to COBOL are in common use; boolean algebra is embedded in the implementation
of these processors.
o Although programmed tools are nice to have, most of the benefits of boolean algebra can be
reaped by wholly manual means if you have the right conceptual tool: the Karnaugh-Veitch
diagram is that conceptual tool.

93
DECISION TABLES:

 Figure 6.1 is a limited - entry decision table. It consists of four areas called the condition
stub, the condition entry, the action stub, and the action entry.
 Each column of the table is a rule that specifies the conditions under which the actions
named in the action stub will take place.
 The condition stub is a list of names of conditions.

Figure 4.10 : Examples of Decision Table.


 A more general decision table can be as below:

Figure 4.11 : Another Examples of Decision Table.

94
 A rule specifies whether a condition should or should not be met for the rule to be satisfied.
"YES" means that the condition must be met, "NO" means that the condition must not be met,
and "I" means that the condition plays no part in the rule, or it is immaterial to that rule.
The action stub names the actions the routine will take or initiate if the rule is satisfied.
 If the action entry is "YES", the action will take place; if "NO", the action will not take
place. The table in Figure 6.1 can be translated as follows:

Action 1 will take place if conditions 1 and 2 are met and if conditions 3 and 4 are not met (rule
1) or if conditions 1, 3, and 4 are met (rule 2).
 "Condition" is another word for predicate.
 Decision-table uses "condition" and "satisfied" or "met". Let us use "predicate" and TRUE
/ FALSE.
 Now the above translations become:
1. Action 1 will be taken if predicates 1 and 2 are true and if predicates 3 and 4 are
false (rule 1), or if predicates 1, 3, and 4 are true (rule 2).
2. Action 2 will be taken if the predicates are all false, (rule 3).
3. Action 3 will take place if predicate 1 is false and predicate 4 is true (rule 4).
 In addition to the stated rules, we also need a Default Rule that specifies the default action to
be taken when all other rules fail. The default rules for Table in Figure 6.1 is shown in Figure
6.3

Figure 4.12 : The default rules of Table in Figure 4.10

 DECISION-TABLE PROCESSORS:

o Decision tables can be automatically translated into code and, as such, are a
higher- order language
o If the rule is satisfied, the corresponding action takes place
o Otherwise, rule 2 is tried. This process continues until either a satisfied rule results
in an action or no rule is satisfied and the default action is taken
o Decision tables have become a useful tool in the programmers kit, in business
data processing.

95
DECISION-TABLES AS BASIS FOR TEST CASE DESIGN:

1. The specification is given as a decision table or can be easily converted into one.
2. The order in which the predicates are evaluated does not affect interpretation of the rules
or the resulting action - i.e., an arbitrary permutation of the predicate order will not, or
should not, affect which action takes place.
3. The order in which the rules are evaluated does not affect the resulting action - i.e., an
arbitrary permutation of rules will not, or should not, affect which action takes place.
4. Once a rule is satisfied and an action selected, no other rule need be examined.
5. If several actions can result from satisfying a rule, the order in which the actions are
executed doesn't matter.

DECISION-TABLES AND STRUCTURE:

o Decision tables can also be used to examine a program's structure.


o Figure 6.4 shows a program segment that consists of a decision tree.
o These decisions, in various combinations, can lead to actions 1, 2, or 3.

Figure 4.13 : A Sample Program


o If the decision appears on a path, put in a YES or NO as appropriate. If the decision
does not appear on the path, put in an I, Rule 1 does not contain decision C, therefore
its entries are: YES, YES, I, YES.
o The corresponding decision table is shown in Table 6.1

96
RULE 1RULE 2RULE 3RULE 4RULE 5RULE 6

CONDITION A
CONDITION
B YES YES
YES NOYES YES NOI NONOI NO
NOI YES
CONDITION I YES I I I NO I YES NO
C
CONDITION
D

ACTION YES
1 YES NO NONO NO NO
ACTION 2 NO NO YES YES YES YES
ACTION 3 NO NO NO NO NO
Table 4.14: Decision Table corresponding to Figure 4.13
As an example, expanding the immaterial cases results as below:

Table 4.15: Expansion of Table 4.10


o Similalrly, If we expand the immaterial cases for the above Table 6.1, it results in Table
6.2 as below:
1 RULE 2 R 3 RULE 4 R5 R6
CONDITION YY
A YYYY YY NNNN NN NN
CONDITION YY
B NNNN YY YYNN NY YN
CONDITION YN
C NNYY YN YYYY NN NN
CONDITION D YY YNNY NN NYYN YY NN
1. Sixteen cases are represented in Table 6.1, and no case appears twice.
2. Consequently, the flowgraph appears to be complete and consistent.
3. As a first check, before you look for all sixteen combinations, count the number of
Y's and N's in each row. They should be equal. We can find the bug that way.

 ANOTHER EXAMPLE - A TROUBLE SOME PROGRAM:

1. Consider the following specification whose putative flowgraph is shown in Figure 6.5:
1. If condition A is met, do process A1 no matter what other actions are taken
or what other conditions are met.

97
2. If condition B is met, do process A2 no matter what other actions are taken
or what other conditions are met.
3. If condition C is met, do process A3 no matter what other actions are taken
or what other conditions are met.
4. If none of the conditions is met, then do processes A1, A2, and A3.
5. When more than one process is done, process A1 must be done first, then A2,
and then A3. The only permissible cases are: (A1), (A2), (A3), (A1,A3),
(A2,A3) and (A1,A2,A3).
2. Figure 6.5 shows a sample program with a bug.

Figure 4.16 : A Troublesome Program


o The programmer tried to force all three processes to be executed for the
cases but forgot that the B and C predicates would be done again, thereby bypassing
processes A2 and A3.
o Table 6.3 shows the conversion of this flow graph into a decision table after expansion.

Table 4.17: Decision Table for Figure 4.14

PATH EXPRESSIONS:
GENERAL:
o Logic-based testing is structural testing when it's applied to structure (e.g., control flow
graph of an implementation); it's functional testing when it's applied to a specification.
o In logic-based testing we focus on the truth values of control flow predicates.

98
o A predicate is implemented as a process whose outcome is a truth-functional value.
o For our purpose, logic-based testing is restricted to binary predicates.
o We start by generating path expressions by path tracing as in Unit V, but this time, our
purpose is to convert the path expressions into boolean algebra, using the predicates'
truth values (e.g., A and ) as weights.

BOOLEAN ALGEBRA:
o STEPS:
1. Label each decision with an uppercase letter that represents the truth value of
the predicate. The YES or TRUE branch is labeled with a letter (say A) and the
NO or FALSE branch with the same letter overscored (say ).
2. The truth value of a path is the product of the individual labels. Concatenation
or products mean "AND". For example, the straight- through path of Figure 6.5,
which goes via nodes 3, 6, 7, 8, 10, 11, 12, and 2, has a truth value of ABC. The
path via nodes 3, 6, 7, 9 and 2 has a value of .
3. If two or more paths merge at a node, the fact is expressed by use of a plus sign
(+) which means "OR".

Figure 4.18: A Troublesome Program


o Using this convention, the truth-functional values for several of the nodes can be
expressed in terms of segments from previous nodes. Use the node name to identify the
point.

o There are only two numbers in boolean algebra: zero (0) and one (1). One means
"always true" and zero means "always false".

99
o RULES OF BOOLEAN ALGEBRA:
 Boolean algebra has three operators: X (AND), + (OR) and (NOT)
 X : meaning AND. Also called multiplication. A statement such as AB (A X B)
means "A and B are both true". This symbol is usually left out as in ordinary
algebra.
 + : meaning OR. "A + B" means "either A is true or B is true or both".
 meaning NOT. Also negation or complementation. This is read as either "not
A" or "A bar". The entire expression under the bar is negated.
 The following are the laws of boolean algebra:

In all of the above, a letter can represent a single sentence or an entire boolean algebra expression. Individual
letters in a boolean algebra expression are called Literals (e.g. A,B) The product of several literals is called
a product term (e.g., ABC, DE).
An arbitrary boolean expression that has been multiplied out so that it consists of the sum of products
(e.g., ABC + DEF + GH) is said to be in sum-of-products form.
The result of simplifications (using the rules above) is again in the sum of product form and each
product term in such a simplified version is called a prime implicant. For example, ABC + AB
+ DEF reduce by rule 20 to AB + DEF; that is, AB and DEF are prime implicants. The path expressions
of Figure 6.5 can now be simplified by applying the rules.
The following are the laws of boolean algebra:

100
Similarly,

The deviation from the specification is now clear. The functions should have been:

Loops complicate things because we may have to solve a boolean equation to determine what
predicate value combinations lead to where.

KV CHARTS:

INTRODUCTION:
o If you had to deal with expressions in four, five, or six variables, you could get bogged
down in the algebra and make as many errors in designing test cases as there are bugs
in the routine you're testing.
o Karnaugh-Veitch chart reduces boolean algebraic manipulations to graphical trivia.
o Beyond six variables these diagrams get cumbersome and may not be effective.
SINGLE VARIABLE:
o Figure 6.6 shows all the boolean functions of a single variable and their equivalent
representation as a KV chart.

101
Figure 4.19 : KV Charts for Functions of a Single Variable.
The charts show all possible truth values that the variable A can have.
o
A "1" means the variable’s value is "1" or TRUE. A "0" means that the variable's
o
value is 0 or FALSE.
o The entry in the box (0 or 1) specifies whether the function that the chart represents
is true or false for that value of the variable.
o We usually do not explicitly put in 0 entries but specify only the conditions
under which the function is true.
TWO VARIABLES:
o Figure 6.7 shows eight of the sixteen possible functions of two variables.

102
Figure 4.20: KV Charts for Functions of Two Variables.
o Each box corresponds to the combination of values of the variables for the row and
column of that box.
o A pair may be adjacent either horizontally or vertically but not diagonally.
o Any variable that changes in either the horizontal or vertical direction does not
appear in the expression.
o In the fifth chart, the B variable changes from 0 to 1 going down the column, and
because the A variable's value for the column is 1, the chart is equivalent to a simple
A.
o Figure 6.8 shows the remaining eight functions of two variables.

103
Figure 4.21: More Functions of Two Variables.
o The first chart has two 1's in it, but because they are not adjacent, each must be
taken separately.
o They are written using a plus sign.
o It is clear now why there are sixteen functions of two variables.
o Each box in the KV chart corresponds to a combination of the variables' values.
o That combination might or might not be in the function (i.e., the box corresponding
to that combination might have a 1 or 0 entry).
o Since n variables lead to 2n combinations of 0 and 1 for the variables, and each such
combination (box) can be filled or not filled, leading to 22n ways of doing this.
o Consequently for one variable there are 221 = 4 functions, 16 functions of 2 variables,
256 functions of 3 variables, 16,384 functions of 4 variables, andso on.

104
o Given two charts over the same variables, arranged the same way, their product is the
term by term product, their sum is the term by term sum, and the negation of a chart is
gotten by reversing all the 0 and 1 entries in the chart.

OR

THREE VARIABLES:
o KV charts for three variables are shown below.
o As before, each box represents an elementary term of three variables with a bar
appearing or not appearing according to whether the row-column heading for that box
is 0 or 1.
o A three-variable chart can have groupings of 1, 2, 4, and 8 boxes.
o A few examples will illustrate the principles:

105
Figure 4.22: KV Charts for Functions of Three Variables.
o You'll notice that there are several ways to circle the boxes into maximum-
sized covering groups.

106
UNIT-V
STATES, STATE GRAPHS, AND TRANSITION TESTING

Introduction
The finite state machine is as fundamental to software engineering as Boolean algebra to logic.
State testing strategies are based on the use of finite state machine models for software
structure, software behavior, or specifications of software behavior.
Finite state machines can also be implemented as table-driven software, in which case they are
a powerful design option.
State Graphs
 A state is defined as: “A combination of circumstances or attributes belonging for the
time being to a person or thing.”
For example, a moving automobile whose engine is running can have the following states with
respect to its transmission.
 Reverse gear
 Neutral gear
 First gear
 Second gear
 Third gear
 Fourth gear State graph - Example
 For example, a program that detects the character sequence “ZCZC” can be in the
following states.
Neither ZCZC nor any part of it has been detected.
 Z has been detected.
 ZC has been detected.
 ZCZ has been detected.
 ZCZC has been detected.

States are represented by Nodes. State are numbered or may identified by words or
whatever else is convenient.
Inputs and Transitions
Whatever is being modeled is subjected to inputs. As a result of those inputs, the state changes,
or is said to have made a Transition.
Transitions are denoted by links that join the states.
The input that causes the transition are marked on the link; that is, the inputs are link weights.
There is one out link from every state for every input.

107
 If several inputs in a state cause a transition to the same subsequent state, instead of drawing a
bunch of parallel links we can abbreviate the notation by listing the several inputs as in:
“input1, input2, input3………”.

Finite State Machine


A finite state machine is an abstract device that can be represented by a state graph having a
finite number of states and a finite number of transitions between states.
o Outputs
An output can be associated with any link.
 Out puts are denoted by letters or words and are separated from inputs by a slash as
follows: “input/output”.
 As always, output denotes anything of interest that’s observable and is not restricted to
explicit outputs by devices.
Outputs are also link weights.
If every input associated with a transition causes the same output, then denoted it as:
o “input1, input2, input3…............../output”

State
Tables Big state graphs are cluttered and hard to follow.
It’s more convenient to represent the state graph as a table (the state table or state
transition table) that specifies the states, the inputs, the transitions and the
outputs.
 The following conventions are used:
 Each row of the table corresponds to a state.
 Each column corresponds to an input condition.
 The box at the intersection of a row and a column specifies the next state
(the transition) and the output, if any.
State Table-Example

108
Time Versus Sequence
 State graphs don’t represent time-they represent
sequence. A transition might take microseconds or
centuries;
A system could be in one state for milliseconds and another for years- the state graph would
be the same because it has no notion of time.
Although the finite state machines model can be elaborated to include notions of time in
addition to sequence, such as time Petri Nets.
o Software implementation
There is rarely a direct correspondence between programs and the behavior of a process
described as a state graph.
The state graph represents, the total behavior consisting of the transport, the software, the
executive, the status returns, interrupts, and so on.
There is no simple correspondence between lines of code and states. The state table forms the
basis.

Good State Graphs and Bad


What constitutes a good or a bad state graph is to some extent biased by the kinds of state
graphs that are likely to be used in a software test design context.
Here are some principles for judging.
o The total number of states is equal to the product of the possibilities of factors
that make up the state.
o For every state and input there is exactly one transition specified to exactly
one, possibly the same, state.
o For every transition there is one output action specified. The output could be trivial,
but at least one output does something sensible.
o For every state there is a sequence of inputs that will drive the system back to the same
state.

Important graphs

State Bugs-Number of States


The number of states in a state graph is the number of states we choose to recognize or model.

109
The state is directly or indirectly recorded as a combination of values of variables that appear
in the data base.
For example, the state could be composed of the value of a counter whose possible values
ranged from 0 to 9, combined with the setting of two bit flags, leading to a total of 2*2*10=40
states.
The number of states can be computed as follows:
o Identify all the component factors of the state.
o Identify all the allowable values for each factor.
o The number of states is the product of the number of allowable values of all the factors.
Before you do anything else, before you consider one test case, discuss the number of states
you think there are with the number of states the programmer thinks there are.
 There is no point in designing tests intended to check the system’s behavior in various states if
there’s no agreement on how many states there are.
o Impossible States
Sometimes some combinations of factors may appear to be impossible.
 The discrepancy between the programmer’s state count and the tester’s state count is often due
to a difference of opinion concerning “impossible states”.
A robust piece of software will not ignore impossible states but will recognize them and
invoke an illogical condition handler when they appear to have occurred.

Equivalent States
Two states are Equivalent if every sequence of inputs starting from one state produces exactly
the same sequence of outputs when started from the other state. This notion can also be
extended to set of states.

Merging of Equivalent States

110
Recognizing Equivalent States
Equivalent states can be recognized by the following procedures:
The rows corresponding to the two states are identical with respect to input/output/next state
but the name of the next state could differ.
There are two sets of rows which, except for the state names, have identical state graphs with
respect to transitions and outputs. The two sets can be merged.

TransitionBugs-
unspecified and contradictory Transitions
Every input-state combination must have a specified transition.
If the transition is impossible, then there must be a mechanism that prevents the input from
occurring in that state.
Exactly one transition must be specified for every combination of input and state.
 A program can’t have contradictions or ambiguities.
Ambiguities are impossible because the program will do something for every input. Even the
state does not change, by definition this is a transition to the same state.

Unreachable States
An unreachable state is like unreachable code.
A state that no input sequence can reach.
An unreachable state is not impossible, just as unreachable code is not impossible
There may be transitions from unreachable state to other states; there usually because the state
became unreachable as a result of incorrect transition.
There are two possibilities for unreachable states:
o There is a bug; that is some transitions are missing.
o The transitions are there, but you don’t know about it.

Dead States
A dead state is a state that once entered cannot be left.
This is not necessarily a bug but it is suspicious.

Output Errors
The states, transitions, and the inputs could be correct, there could be no dead or unreachable
states, but the output for the transition could be incorrect.
Output actions must be verified independently of states and transitions. State Testing
Impact of Bugs
If a routine is specified as a state graph that has been verified as correct in all details. Program
code or table or a combination of both must still be implemented.
A bug can manifest itself as one of the following symptoms:
Wrong number of states.
Wrong transitions for a given state-input combination.
Wrong output for a given transition.
Pairs of states or sets of states that are inadvertently made equivalent.
States or set of states that are split to create in equivalent duplicates.

111
States or sets of states that have become dead.
States or sets of states that have become unreachable.

Principles of State Testing


The strategy for state testing is analogous to that used for path testing flow graphs.
 Just as it’s impractical to go through every possible path in a flow graph, it’s impractical to
go through every path in a state graph.
The notion of coverage is identical to that used for flow graphs.
 Even though more state testing is done as a single case in a grand tour, it’s impractical to do
it that way for several reasons.
In the early phases of testing, you will never complete the grand tour because of bugs.
Later, in maintenance, testing objectives are understood, and only a few of the states and
transitions have to be tested. A grand tour is waste of time.
Theirs is no much history in a long test sequence and so much has happened that verification is
difficult.

Starting point of state testing


Define a set of covering input sequences that get back to the initial state when starting from the
initial state.
For each step in each input sequence, define the expected next state, the expected transition,
and the expected output code.
A set of tests, then, consists of three sets of sequences:
o Input sequences
o Corresponding transitions or next-state names
o Output sequences

Limitations and Extensions


State transition coverage in a state graph model does not guarantee complete testing.
How defines a hierarchy of paths and methods for combining paths to produce covers of state
graphs.
 The simplest is called a “0 switch” which corresponds to testing each transition individually.
 The next level consists of testing transitions sequences consisting of two transitions called “1
switches”.
 The maximum length switch is “n-1 switch” where there are n numbers of states.
o Situations at which state testing is useful
Any processing where the output is based on the occurrence of one or more sequences of
events, such as detection of specified input sequences, sequential format validation, parsing,
and other situations in which the order of inputs is important.
Most protocols between systems, between humans and machines, between components of a
system.
Device drivers such as for tapes and discs that have complicated retry and recovery procedures
if the action depends on the state.
Whenever a feature is directly and explicitly implemented as one or more state transition tables.

112
GRAPH MATRICES AND APPLICATIONS

Problem with Pictorial Graphs


Graphs were introduced as an abstraction of software structure.
Whenever a graph is used as a model, sooner or later we trace paths through it- to find a set of covering
paths, a set of values that will sensitize paths, the logic function that controls the flow, the processing
time of the routine, the equations that define the domain, or whether a state is reachable or not.
 Path is not easy, and it’s subject to error. You can miss a link here and there or cover some links twice.
 One solution to this problem is to represent the graph as a matrix and to use matrix operations
equivalent to path tracing. These methods are more methodical and mechanical and don’t depend on
your ability to see a path they are morereliable.

Tool Building
If you build test tools or want to know how they work, sooner or later you will be implementing or
investigating analysis routines based on these methods.
It is hard to build algorithms over visual graphs so the properties or graph matrices are fundamental to
tool building.

The Basic Algorithms


The basic tool kit consists of:
Matrix multiplication, which is used to get the path expression from every node to every other
node.
A partitioning algorithm for converting graphs with loops into loop free graphs or equivalence
classes.
A collapsing process which gets the path expression from any node to any other node.
The Matrix of a Graph
 A graph matrix is a square array with one row and one column for every node in thegraph.
 Each row-column combination corresponds to a relation between the node corresponding to the
row and the node corresponding to thecolumn.
 The relation for example, could be as simple as the link name, if there is a link between the nodes.
Some of the things to be observed:
The size of the matrix equals the number of nodes.
There is a place to put every possible direct connection or link between any and any other node.
The entry at a row and column intersection is the link weight of the link that connects the two nodes
in that direction.
A connection from node i to j does not imply a connection from node j to node i.
 If there are several links between two nodes, then the entry is a sum; the “+” sign denotes parallel
links as usual.

113
A simple weight
 A simplest weight we can use is to note that there is or isn’t a connection. Let “1” mean that there is
a connection and “0” mean that there isn’t.
 The arithmetic rules are:
 1+1=1 1*1=1
 1+0=1 1*0=0
 0+0=0 0*0=0
 A matrix defined like this is called connection matrix.
Connection matrix
 The connection matrix is obtained by replacing each entry with 1 if there is a link and 0 if there isn’t.
 As usual we don’t write down 0 entries to reduce the clutter.

114
Connection Matrix-continued
Each row of a matrix denotes the out links of the node corresponding to that row.
Each column denotes the in links corresponding to that node.
A branch is a node with more than one nonzero entry in its row.
A junction is node with more than one nonzero entry in its column.
A self loop is an entry along the diagonal.

Cyclomatic Complexity
 The cyclomatic complexity obtained by subtracting 1 from the total number of entries in each row and
ignoring rows with no entries, we obtain the equivalent number of decisions for each row. Adding these
values and then adding 1 to the sum yields the graph’s cyclomaticcomplexity.

115
Relations
A relation is a property that exists between two objects of interest.
For example,
 “Node a is connected to node b” or aRb where “R” means “is connected to”.
 “a>=b” or aRb where “R” means greater than or equal”.
A graph consists of set of abstract objects called nodes and a relation R between the nodes.
If aRb, which is to say that a has the relation R to b, it is denoted by a link from a tob.
For some relations we can associate properties called as link weights.

Transitive Relations
A relation is transitive if aRb and bRc implies aRc.
Most relations used in testing are transitive.
Examples of transitive relations include: is connected to, is greater than or equal to, is less than or equal
to, is a relative of, is faster than, is slower than, takes more time than, is a subset of, includes, shadows,
is the boss of.
Examples of intransitive relations include: is acquainted with, is a friend of, is a neighbor of, is lied to,
has a du chain between.

Reflexive Relations
A relation R is reflexive if, for every a, aRa.
A reflexive relation is equivalent to a self loop at every node.
Examples of reflexive relations include: equals, is acquainted with, is a relative of.
Examples of irreflexive relations include: not equals, is a friend of, is on top of, is under.

Symmetric Relations
A relation R is symmetric if for every a and b, aRb implies bRa.
A symmetric relation mean that if there is a link from a to b then there is also a link from b to
a. A graph whose relations are not symmetric are called directedgraph.

116
A graph over a symmetric relation is called an undirected graph.
The matrix of an undirected graph is symmetric (aij=aji) for all
i,j)

Antisymmetric Relations
A relation R is antisymmetric if for every a and b, if aRb and bRa, then a=b, or they are the same
elements.
Examples of antisymmetric relations: is greater than or equal to, is a subset of, time.
Examples of nonantisymmetric relations: is connected to, can be reached from, is greater than, is a
relative of, is a friend of

quivalence Relations
An equivalence relation is a relation that satisfies the reflexive, transitive, and symmetric properties.
Equality is the most familiar example of an equivalence relation.
If a set of objects satisfy an equivalence relation, we say that they form an equivalence class over that
relation.
The importance of equivalence classes and relations is that any member of the equivalence class is, with
respect to the relation, equivalent to any other member of that class.
The idea behind partition testing strategies such as domain testing and path testing, is that we can
partition the input space into equivalence classes.
Testing any member of the equivalence class is as effective as testing them all.

Partial Ordering Relations


A partial ordering relation satisfies the reflexive, transitive, and antisymmetric properties.
Partial ordered graphs have several important properties: they are loop free, there is at least one
maximum element, and there is at least one minimum element.

The Powers of a Matrix


 Each entry in the graph’s matrix expresses a relation between the pair of nodes that corresponds to
that entry.
Squaring the matrix yields a new matrix that expresses the relation between each pair of nodes via one
intermediate node under the assumption that the relation is transitive.
The square of the matrix represents all path segments twolinks long.
The third power represents all path segments three links long.

117
Matrix Powers and Products
Given a matrix whose entries are aij, the square of that matrix is obtained by replacing every entry with
 n
 aij=Σ aik akj
 k=1
more generally, given two matrices A and B with entries aik and bkj, respectively, their product is a
new matrix C, whose entries are cij, where:
 n
 Cij=Σ aik bkj

k=1

Partitioning Algorithm
Consider any graph over a transitive relation. The graph may have loops.
We would like to partition the graph by grouping nodes in such a way that every loop is contained
within one group or another.
Such a graph is partially ordered.
There are many used for an algorithm that doesthat:
We might want to embed the loops within a subroutine so as to have a resulting graph which is loop
free at the top level.
Many graphs with loops are easy to analyze if you know where to break theloops.
 While you and I can recognize loops, it’s much harder to program a tool to do it unless you have a
solid algorithm on which to base thetool.

Node Reduction Algorithm (General)


The matrix powers usually tell us more than we want to know about most graphs.
In the context of testing, we usually interested in establishing a relation between two nodes- typically
the entry and exit nodes.
In a debugging context it is unlikely that we would want to know the path expression between every
node and every other node.
The advantage of matrix reduction method is that it is more methodical than the graphical method
called as node by node removalalgorithm.
1. Select a node for removal; replace the node by equivalent links that bypass that node and add
those links to the links they parallel.
2. Combine the parallel terms and simplify as you can.
3. Observe loop terms and adjust the out links of every node that had a self loop to account for the
effect of the loop.
4. The result is a matrix whose size has been reduced by 1. Continue until only the two nodes of
interest exist.

118
119
Automation and testing tools:
Automation Testing is a software testing technique that performs using special automated testing software tools to
execute a test case suite. On the contrary, Manual Testing is performed by a human sitting in front of a computer
carefully executing the test steps.
The automation testing software can also enter test data into the System Under Test, compare expected and actual
results and generate detailed test reports. Software Test Automation demands considerable investments of money
and resources.
Successive development cycles will require execution of same test suite repeatedly. Using a test automation tool,
it’s possible to record this test suite and re-play it as required. Once the test suite is automated, no human
intervention is required. This improved ROI (Return on Investment) of Test Automation. The goal of Automation is
to reduce the number of test cases to be run manually and not to eliminate Manual Testing altogether.
Need for Automation:
Automation testing is the application of tools and technology to testing software with the goal of reducing testing
efforts, delivering capability faster and more affordably. It helps in building better quality software with less effort.
By reducing the risk of human error in common daily tasks, automation gives you predictable and repeatable
processes for managing configurations to improve consistency, speed changes and increase uptime.
The benefits of automation include improved accuracy, reliability, productivity as well as improved employee
morale.
he main objective of process automation is to improve a company's workflows. With automation, we can reduce
costs, time, and waste as well as increase productivity, reduce mistakes, and control all the processes of the business
in real time.
Automation brings in necessary agility to testing and helps it to respond faster and more effectively to changes.
Continuous testing: Agility demands early and continuous testing. Test coverage extends to not only the newly
added code but also the code from previous iterations.
Categorization of testing tools:
Software testing tools are required for the betterment of the application or software.
That's why we have so many tools available in the market where some are open-source and paid tools.
The significant difference between open-source and the paid tool is that the open-source tools have limited features,
whereas paid tool or commercial tools have no limitation for the features. The selection of tools depends on the
user's requirements, whether it is paid or free.
The software testing tools can be categorized, depending on the licensing (paid or commercial, open-source),
technology usage, type of testing, and so on.
With the help of testing tools, we can improve our software performance, deliver a high-quality product, and reduce
the duration of testing, which is spent on manual efforts.
The software testing tools can be divided into the following:
o Test management tool
o Bug tracking tool
o Automated testing tool
o Performance testing tool
o Cross-browser testing tool
o Integration testing tool
o Unit testing tool
o Mobile/android testing tool
120
o GUI testing tool
o Security testing tool

Test Management tool:


Test management tools are used to keep track of all the testing activity, fast data analysis, manage manual and
automation test cases, various environments, and plan and maintain manual testing as well.
Bug tracking tool:
The defect tracking tool is used to keep track of the bug fixes and ensure the delivery of a quality product. This
tool can help us to find the bugs in the testing stage so that we can get the defect-free data in the production
server. With the help of these tools, the end-users can allow reporting the bugs and issues directly on their
applications.
Automation testing tool:
This type of tool is used to enhance the productivity of the product and improve the accuracy. We can
reduce the time and cost of the application by writing some test scripts in any programming
language. Performance testing tool
Performance or Load testing tools are used to check the load, stability, and scalability of the application.
When n-number of the users using the application at the same time, and if the application gets crashed
because of the immense load, to get through this type of issue, we need load testing tools.

Test Automation is the best way to increase the effectiveness, test coverage, and execution speed in software
testing. Automated software testing is important due to the following reasons:

 Manual Testing of all workflows, all fields, all negative scenarios is time and money consuming.
 It is difficult to test for multilingual sites manually.
 Test Automation in software testing does not require Human intervention. You can run automated
test unattended (overnight).
 Test Automation increases the speed of test execution.
 Automation helps increase Test Coverage.
 Manual Testing can become boring and hence error-prone.

Test cases to be automated can be selected using the following criterion to increase the automation ROI:

 High Risk – Business Critical test cases


 Test cases that are repeatedly executed
 Test Cases that are very tedious or difficult to perform manually
 Test Cases which are time-consuming

The following category of test cases are not suitable for automation:

121
 Test Cases that are newly designed and not executed manually at least once.
 Test Cases for which the requirements are frequently changing.
 Test cases which are executed on an ad-hoc basis.

Automated Testing Process:


Following steps are followed in an Automation Process
Step 1) Test Tool Selection
Step 2) Define scope of Automation
Step 3) Planning, Design and Development
Step 4) Test Execution
Step 5) Maintenance

Automation testing tool:


The automation testing is used to change the manual test cases into a test script with the help of some
automation tools.
We have various types of automation testing tools available in the market. Some of the most commonly
used automation testing tools are as follows:

o Selenium
o Watir
o QTP
o Telerik Studio
o Testim
o Applitools

122
Fig. 5.1.Automation testing tools

Selenium:
It is an open-source and most commonly used tool in automation testing. This tool is used to test web- based
applications with the help of test scripts, and these scripts can be written in any programming language
such as java, python, C#, Php, and so on.
Features of Selenium:
This tool is most popular because of its various features. Following are standard features of Selenium:
o Selenium supports only web-based application, which means that the application can be opened
by the browser or the URL like Gmail, Amazon, etc.
o Selenium does not support a stand-alone application, which means that the application is
not opened in the browser or URL like Notepad, MS-Word, Calculator, etc.
o Selenium web driver is the latest tool in the selenium community that removes all the drawbacks
of the previous tool (selenium-IDE).
o Selenium web-driver is powerful because it supports multiple programming languages,
various browsers, and different operating systems and also supports mobile applications
like iPhone, Android.

123
Performance testing tools (Load testing tools):
When we have to measure the load, stability, response time of the application, we required some
performance (load) testing tools, which help us to test the performance of the software or an application.
Performance testing tools can be open-source and commercial.
We have various types of performance testing tools available in the market; some of the most used
performance (load) testing tools are as follows:

o Apache JMeter
o LoadRunner[HP]
o LoadNinja
o WebLOAD
o LoadComplete

Fig. 5.2.Performance testing tools

LoadRunner:
It is one of the most powerful tools of performance testing, which is used to support the performance testing for the
extensive range of protocols, number of technologies, and application environments.
It quickly identifies the most common causes of performance issues. And also accurately predict the application
scalability and capacity.
Feature of LoadRunner
o It will support XML; that's why we can easily view and handle the XML data within the test scripts.

124
o It supports a large range of applications, which will reduce the time to understand and explain
the reports.
o With the help of this tool, we can get detailed performance test reports.
o It will reduce the cost of distributed load testing.
o It will provide the operational tool for deployment tracking.
o This tool is used to reduce the cost of software and hardware.

Apache JMeter:
It is used to test the performance of both static and dynamic resources and dynamic web applications. This tool is
completely designed on the JAVA application to load the functional test behavior and measure the performance of
the application. It is an open-source tool that facilitates users or developers to use the source code for the
development of other applications.

It can be used to reproduce the huge load on a server, object, or network, group of servers to test its power, or to
explore the complete performance in multiple load types. Previously it was used to test the web application, but now
it is expanded to other test functions also.

Features of JMeter:
Below are some essential elements of JMeter:
 This tool supports a user-friendly GUI, which is interactive and straightforward.
 JMeter maintains multiple testing approaches, such as functional, distributed, and load testing.
 It is incredibly extensible to load the performance test in the multiple types of servers such as database
server: LDAP, JMS, JDBC, web server: SOAP, HTTPS, HTTP, and mail server: POP3
 It is a platform-independent because it is designed with the help of JAVA, so it can run on any
platform, which accepts a JVM like Window, Mac, and Linux, etc.

JUnit: Open Source Java Unit Testing Tool


JUnit is a unit testing framework for Java programming language. It plays a crucial role test-driven
development, and is a family of unit testing frameworks collectively known as xUnit.
JUnit promotes the idea of "first testing then coding", which emphasizes on setting up the test data for a piece
of code that can be tested first and then implemented. This approach is like "test a little, code a little, test a
little, code a little." It increases the productivity of the programmer and the stability of program code,
which in turn reduces the stress on the programmer and the time spent on debugging.

125
Features of JUnit:
 JUnit is an open source framework, which is used for writing and running tests.
 Provides annotations to identify test methods.
 Provides assertions for testing expected results.
 Provides test runners for running tests.
 JUnit tests allow you to write codes faster, which increases quality.
 JUnit is elegantly simple. It is less complex and takes less time.
 JUnit tests can be run automatically and they check their own results and provide immediate
feedback. There's no need to manually comb through a report of test results.
 JUnit tests can be organized into test suites containing test cases and even other test suites.
 JUnit shows test progress in a bar that is green if the test is running smoothly, and it turns red when
a test fails.

126

You might also like