Project Management (Compatibility Mode)
Project Management (Compatibility Mode)
Project screening
Birth of the project First phase of the project
Project Management
Project Identification and Screening
Project Selection
Project identification Project Appraisals Project selection
Project Identification
Objective should be clear SWOT analysis Alternate project possibilities
Motivation
Means to accomplish some goal or objective Ex. Market growth, Family objective, Individual objective etc.
4/8/2012
Objective
To increase Project To minimize threats of losses To become more competitive (Jet has acquire Air shara) To provide help after a disaster To train people in a new era (Oracle is new) To reduce pollution in Delhi To become a successful Entrepreneur
SWOT Analysis
Motivated by objective Experience What type of experience in the same field Resource Environmental Pressures (Ceat Tyre) Keeping this factors in mind an analysis of Strength/Weakness/Opportunities/Threats is made to identify and select suitable projects It should not be done in isolated manner Turthful
Strength
Experience and expertise Financial position (How much you have and how much you can raise) Capital raising capability Industrial contacts Foreign collaborations
Weakness (Internal)
Newer unfamiliar Technologies Inability to raise huge investments lack of experience lack of trained personal inability to forecast market trends
Opportunities
Emerging technologies new product with new markets New process with better features special financing schemes (Taking Cart loans etc) Government and other incentives (Incentives for particular zone )
Threat
Competitors Poor state of the economy (Good product but people buying capability) Outdated technologies New products and services
4/8/2012
Screen Ideas
Poor Fair Good Vgood Exc. Weigh 1 2 3 4 5 % Cost 20% Risk 30% Return 40% Hazard 10%
Criteria
Investment Rate of Return Risk Likely Profit Pay back Period Similar to Existing Business Flexibility Environment impact completion
4/8/2012
Summary
Objective -> Brainstorming -> SWOT>Project possibilities -> (Screening) using criteria Candidate for Project Propsal
Project Appraisal -1
Feasibility (worthwhile) Market analysis Financial Analysis Social Economical Demand Analysis Economic Analysis Ecological Analysis
Market Appraisal
What would be the aggregate demand of the proposed product/Service? Market share of the product?
Technical Appraisals
Whether Prerequisite for the success of the project considered? Good Choices with regard to Location ,size ,process ,machines etc Preliminary test and studies (Soil test ,etc) Availability of Raw Materials ,Power and other inputs Optimal scale of operations (Machine should be run with minimum load) Choice of suitable production process Choice of appropriate machines and equipment
4/8/2012
Technical Appraisal
Effluents and waste disposal Proper layouts of Plants (Man and Material movement) Realistic work schedule Socially acceptable technology
Economic Appraisals
Social Cost benefit Analysis (Displacement of people and Job opportunity etc) Direct economic benefits and cost in terms of shadow prices (Land cost should be less than the project cost then it is ok) Impact of project on distribution of income in society.
Economic Apprisals
Impact on level of saving and investments in the society (Nsc,Bonds etc) Impact on fulfillment of the national goals. - Self sufficiency - Employment
Ecological Apprisals
Impact of the project on quality of - Air - Water - Noise -Vegetation -Human Life
Ecological Appraisal
Major projects ,such as these ,Cause environmental damages. Power Plants Irrigation schemes Industries like bulk drugs chemical processing and Leather Processing Likely damage and the cost of restration
Financial Appraisals
Whether the project is financially viable? 1. servicing debt 2.Meeting return expectations
4/8/2012
Financial Appraisals
Investment and financial Phasing of the total cost Means of financing (Source ) Cost of capital ( Depends on the interest) Projected Profitability Breakeven Point Cash flow in the projects Investment worthwhile? - Net present value - IRR - Payback period Loan Returning Capability -Dept service coverage ratio Level of Risk --IRR and PAY BACK GRAPH
Financial Appraisal
NPV IRR Simple before /after tax rates of return Equivalent annual cost (Time value money) (Equal distribution of NPV) Pay back period (Low is best)
Sample Project
Initial investment Rs. 3,00,000 Annual cost of operation 20,000 Expected annual revenues First 2 years -> 1,00,000 Next 3 years -> 2,00,000 Planning horizon 5 years
Calculations
Revenues 100 100 200 Cost 300 20 20 20
200 200 20 20
4/8/2012
Project Management
Project selection Purpose : To select the suitable project
Criteria
Investment Return (IRR) Payback Net Present Value (NPV) RISK (High, Low Subjective) Future Growth Prospects Similarity to existing Business Environmental implications
Criteria
Tangible
(Measurable in Rs,.Percentage, Year,Rs/year) (Commensurate units and Non Commensurate units)
4/8/2012
Decision Matrix
Preparing Matrix with the help of all criteria and Project We may not be able to add the all evaluation because of different in the measurement. We have do the normalization to bring all the evaluation into single.
A1 A2 A3 A4
X4 is cost criterion (Low is good) and rest all are benefit criterion (High) TOPSIS (Technique for order preference using similarity to idle solution)
4/8/2012
Benefit attribute(B.A)
Very low Low Avg High Very high X5 (B.A) Avg(5) Low (3) High (7) Avg.(5)
Example . 2/(Sqrt( (2.0*2.0)+(2.5*2.5)+(1.8*1.8)+(2.2*2.2) X1 .4671 .5839 .4204 .5139 X2 .3662 .6591 .4882 .4392 x3 .5056 .4550 .5308 .5056 X4 .5063 .5983 .4143 .4603 X5 (B.A) .4821 .2887 .6736 .4811 x6(B.A) .6708 .3727 .5217 .3727
A1 A2 A3 A4
A1 A2 A3 A4
Separation Measure
X1 A1 A2 A3 A4 .0934 .1168 .0841 .1028 X2 x3 .0366 .0506 .0659 .0455 .0488 .0531 .0439 .0506 X4 .0506 .0598 .0414 .0460 X5 (B.A) x6(B.A) .0962 .2012 .0577 .1118 .1347 .1565 .0962 .1118
Negetive
A- (..0841,.0366,.0455,.0598,.0577,.1118) Negative idle Solution
Choose A- values X1 X2 x3 square(.0934-.0841) square (.0366-.0366) .o598) etc. X4 X5 (B.A) x6(B.A) square(.0506-.0455) square(.0506-
A1 A2 A3 A4
Choose A* values X1 X2 square(.0934-.1168) square (.0366-.0659) square(.1168-.1168) etc square(.0841-.1168) square(.1028-.1168) x3 X4 X5 (B.A) x6(B.A) square(.0506-.0531) square(.0506-.o414) etc.
A1 A2 A3 A4
Sqrt (A1X1+A1X2+A1X3+A1X4+A1X5+A1X6) Become A1*. Sqrt (A2X1+A2X2+A2X3+A2X4+A2X5+A2X6) .Become A2*.. Sqrt (A3X1+A3X2+A3X3+A3X4+A3X5+A3X6) Become A3* squrtA4X1+A4X2+A4X3+A4X4+A4X5+A4X6) .. Become A4
Become A1-. ..0983 .Become A2-.. .0439 Become A3- .0920 .. Become A4- .0458
4/8/2012
Value of separation
Idle Solution Negative Idle Solution
A1A2A3A4-
Relative closeness: A1-/(A1- + A1*) = .0983/(.0545+.0983) = .0983/.1528 = .643 A2-/(A2- + A2*) = .0439/(.0439+1197) =.268 A3-/(A3- +A3*) = .0920/(.0920+.580) =.613 A4-/(A4- + A4*) = .0458/(.0458-.1009) =.312
Methods
TOPSIS (Technique for order preference using similarity to idle solution)
Weight 0.1 Style Civic Hona City Ford Mazda 7 8 9 6
Example 2
0.4 Reliability 9 7 6 7 0.3 Fuel Economic. 9 8 8 8 0.2 Cost 8 7 9 6
10
4/8/2012
Knowledge Area
SCOPE TIME COST HR QUALITY RISK COMMUNICATION
Project Charter
Official document to start the project Business case should be there Summary milestones Sponsor will sign the project charter Project Manger will be assigned.
Scope
Product scope : the features and functions of the product or service the you and your team are building Project Scope : All the work need to done to make the product - Scope Creep means changes coming in between (Bisleri Bottle example)
Scope
Collect requirement Define Scope Create WBS (work break down structure)
Requirement decision
Unanimity Everyone agrees on the decision Majority More than half Plurality Idea that gets the most votes Dictatorship One person make the decision
11
4/8/2012
WBS
Work Break down structrue -What are the work needs to be done -WBS does not show the order of the work packages/Dependencies. - Work involved in creating the product. - Work break down structure can be broken down by project phase. - WBS can be broken down by deliverables
Work Package
Work package is the lowest level in the WBS Control accounts are established for the work package (for accounting purpose)
Project Representation
- How the project will be represented - Project network is the continent way to represent - What are all goes into - What are the advantages - What are the prerequisite of the project
Sub sys1 Sub Sys2 Sub sys3 Task 1 WB1 Task 2 WB2 Task 3 st1 WB3 Task 4 st2 Task 5
12
4/8/2012
WBS
Hardware orientation (Identification of the basic Work packages) Agency orientation (Based on the assignment of responsibility of different agencies) Function oriented (Design, procurement etc)
WBS cont.
Generally a WBS includes 6-7 levels WBS does not show the sequencing of work What is the quantum of the work ? WBS should be developed by the individuals knowledge about the work. Break down the project only to a level sufficient to produce estimate
Ballestic Shell
Propulsion Engine
Re Entry Vehile
Stage 1
Stage II
Solid Fuel
AON
13
4/8/2012
Activity Durations
Deterministic - Previous experience yields fairly accurate estimation of the activity duration. It is single time estimate is used. ex . Construction and market survey Probabilistic - New activities being carried out for the first time, R&D activity and uncertainty in timing .Three time estimates are commonly used to for each
Example 1
Job A B C D E F G H I predecessors A A,B D D C,E C,E F,G,H Duration 2 3 1 4 5 8 6 4 3
c A 2
Nw for AOA
Dummy arc is required in AOA (Logical Dummies/d1 and Parallel dummies d2)
h 5 1 2 1 3 3 4 4 8 B d1 D e 5 6 f 7 i 3 8 g d2 4 6
Critical Path
Longest path in the network Lower bound on the project duration (Minimum time) Selective control for the management. Can be determined by : - Enumeration of all the paths in the network. (Discussion on crashing) - Event based computations (A-O-A Networks) - Activity based computations (A-O-N Networks)
Path Enumeration
To find the no of paths.
14
4/8/2012
Total Float = LS-ES or LF-EF Float 0 indicate critical Patch ( B-D-E-G-I) Arcs joining b/w two critical nodes cant be the critical activity
Critical Path
12 2 A 0 2 1 0 3 3 4 3 4 8 B 3 2 1 3 d1 D 7 e 5 5 c h 4
12 (Min value)
15
4/8/2012
Event Slacks
Slack on Node I ( Li-Ei) Slack on Node J (Lj-Ej) Total Float = F1(ij) = Lj-Ei-Tij (Maximum flexibility) Safety Float = F2(ij)=Lj-Li-Tij (Predecessor utilize the float) Free Float =F3(ij) =Ej-Ei-Tij (Successor utlize the float) Indep.float =Max(0,Ej-Li-Tij) (Starting late and trying to reach early finish)Ei Ej Tij
I Lj Li
Float computations
Total float =LS-ES =LF-EF Safety Float = Total Float Slack in the prec. Node (TF-(Li-Ei)) Free float = Total Float Slack in the succ. Node (TF-(Lj-Ej)) Independent Float = Total Float max (0,Total float (Slack in succ. And Slack in Prec.)
Ei
Tij
Ej
Li
Lj
Ei (Early start)
Li (Late Start)
Ej (Early Finish)
Lj (Late Finsh)
Floats
Job Total Safety Free Independent A 1 1 0 0 B 0 0 0 0 C 9 8 9 8 D 0 0 0 0 E 0 0 0 0 F 3 3 3 3 G 0 0 0 0 H 2 2 0 0 I 0 0 0 0 For Non critical Path: C(T)=EF-ES=9, C(Saf)=(9-(3-2) = 8, C(Free)=9-(12-12)=9 ,C(ind)=9- ((3-2) + 12-12) =8 F(T)=10-7=3,F(Saf)=3-(7-7)=3, F(Free)=3-(18-18)=3,F(Ind)=3-(7-7)+(18-18) H(T)=14-12=2,H(Saf)=2-(12-12)=2 ,H(Free)=2-(18-16)=0,H(ind)=2-(12-12)+(18-16)=0 (To find out the total flat use the chart of ES,LS,EF,LF) To find the Free flot,saf float and ind flot use the n/w diagram (Early and late occurrence) A(T)=1-0=1, A(Saf)=1-(0-0)=1 ,A(Free)=1-(3-2) = 0, A(ind)= 1- (0-0) +( 3-2) For critical path: All float will be 0
Interpretation
Successors
Early
EARLY Free
Late
Total
Predecessors
LATE Independent Safety Total : Predecessor start as early as possible and successor start as late as possible Independent : Predecessor start as late as possible and successor start as early as possible Free : Predecessor and Successor start as early as possible Safety : Successor start as late as possible and predecessor start as late as possible
AON Benefits
Basic Scheduling computation can be done on both AO-N or A-O-A Networks A-O-N networks are simple to draw There are no float anomalies in AON network A-O-N networks are becoming more popular in Computer packages Lead easily to PDM with expanded precedence relationships (FS,SF,FF,SS) Used in type of floats.
Float/Slack
When it comes to project activity management, activity sequencing is one of the main tasks. Among many other parameters, float is one of the key concepts used in project scheduling. Float can be used to facilitate the freedom for a particular task. Let's have a look at the float in detail. Float: When it comes to each activity in the project, there are four parameters for each with related to the timelines. Those are defined as: Earliest start time (ES) - The earliest time, an activity can start once the previous dependent activities are over. Earliest finish time (EF) - This would be ES + activity duration. Latest finish time (LF) - The latest time an activity can finish without delaying the project. Latest start time (LS) - This would be LF - activity duration. The float time for an activity is the time between the earliest (ES) and the latest (LS) start time or between the earliest (EF) and latest (LF) finish times. During the float time, an activity can be delayed without delaying the project finish date.
16
4/8/2012
Float
Slack (SLACK: THE AMOUNT OF TIME THAT A TASK CAN SLIP BEFORE IT AFFECTS ANOTHER TASK OR THE PROJECT'S FINISH DATE. FREE SLACK IS HOW MUCH A TASK CAN SLIP BEFORE IT DELAYS ANOTHER TASK. TOTAL SLACK IS HOW MUCH A TASK CAN SLIP BEFORE IT DELAYS THE PROJECT.) is the amount of time that a task can slip before it affects another task or the project's finish date. Use the Early Start, Early Finish, Late Start, Late Finish, Start Slack, and Finish Slack fields to analyze project schedule delays and find available slack in your schedule
Example A-O-N
Job A B C D E F G H I Precedence A A,B D D C,E C,E F,G,H Duration (days) 2 3 1 4 5 8 6 4 3
2 1
AON
6
C A
4 3 3 D E 5 H B 8 4 I
0/2
C A 11/12
G 12/18 7/12
ES/EF
1/3
3 0/3
D 3/7
7/12 8
17
4/8/2012
Float calculation
Job A B C D E F G H I Duration 2 3 1 4 5 8 6 4 3 ES 0 0 2 3 7 7 12 12 18 EF 2 3 3 7 12 15 18 16 21 LS 1 0 11 3 7 10 12 14 18 LF Total Float 3 1 (LS ES or LF EF) 3 0 12 9 7 0 12 0 18 3 18 0 18 2 21 0
Float Interpretation
Successors
Early
EARLY Free
Late
Total
Predecessors
LATE Independent Safety Total : Predecessor start as early as possible and successor start as late as possible Independent : Predecessor start as late as possible and successor start as early as possible Free : Predecessor and Successor start as early as possible Safety : Successor start as late as possible and predecessor start as late as
Computation of Float
Slack on pre. Node = Max (LF of pre. ) - ES ES/EF Slack on suc. Node = LF Min (ES of succ.)
K1 ES/EF i1 K2
J1 I2 K3 LS/LF I3
Total float is the amount of time that a schedule activity can be delayed from its early start date without missing the project finish date or violating any schedule constraints. The free float is the time that a schedule activity can be delayed without delaying the early start date of any subsequent activities. In determining the amount of float in a task, you need to look at both types of float.
0/2 c A
2/3
1/3 D
3/7
18
4/8/2012
G ES/EF 2/3 18/21 A LS/LF 7/15 C 12/16 ES/EF D H LS/LF 3/7 10/18 F I
1/3 11/12
U1
V1 U2
V1
V2
FF Lag
u2
U1
v2
U1
V1 U2
Activity U SS Lag
V1
V2
19
4/8/2012
Project Networks
Project network is thus a common vehicle for planning ,communicating and implementing the project right from the beginning.
Example
- Organizing one day seminar
Decide data, venue and budget for seminar Identify speakers and participants Contact the speakers and finalize the dates Print seminar brochure Mail brochure to tentative participants Estimate no of participants Decide menu for lunch ,tea and coffee. Arrange Catering Arrange Projection facility at venue Receiving guest at registration , Conduct seminar and Send of all
Example 2
Job
A B C D E
Activities Predecessors A1.Decide data, venue and budget for seminar ---A2.Identify speakers and participants ---A3.Contact the speakers and finalize the dates A2 A4.Print seminar brochure A1,A3 A5.Mail brochure to tentative participants A4 A6.Estimate no of participants A5 A7.Decide menu for lunch ,tea and coffee. A6 A8. Arrange Catering A1,A7 A9. Arrange Projection facility at venue A6 A10. Receiving guest at registration A8 ,A9 A11.Conduct seminar A8 A9 A10 A12. See off Guests A11
Predecessors
A,B B,C
20
4/8/2012
Example
Durations 2
a
1
2 c
d 4 e 3
Topological ordering
Select the job which has no predecessors and place it on top of the list step 1 Delete the job just placed from the predecessor list of remaining jobs step 2 Identify any new source step 3 Again repeat step 2 till 1> There are no sources on the list of remaining jobs . This shows the presence of inconsistency in the network 2 >All jobs are placed in the list ,which now topologically ordered showing there are no inconsistencies.
21
4/8/2012
Example 1
Consistency Network :
Job Predecessors A1 A2 A3 A1 A4 A1 A5 A2,A3 This is Topologically ordered list Job A1 A2 A3 A4 A5 Predecessors A2,A5 A1,A3 A4
Example 2
Inconsistency Network :
A1
1
2 A3
A4 4 A5 3
1
A1 A2
2 A3
A4 4 A5 3
A2
Example 1
Fulkersons Numbering Rule Step 1
Fulkersons Rule
Step 2
Fulkersons Rule
2 1
22
4/8/2012
Matrix Representation
No source ..Unable to Number.. Inconsistency exists in the network 1 2 3 4
??
1 0 0 0 0
2 1 0 0 0
3 1 1 0 0
4 0 1 1 0
2 A1 4 A3 1 A2 3 A5
Circuit Matrix
a1 L1 1 L2 0 L3 1 a2 -1 0 -1 a3 1 -1 0 a4 0 1 1 a5 0 -1 -1
2 A1 4 A3 1 A2 3 A5
1 2 3 4
1 0 0 0 0
2 1 0 0 1
3 0 1 0 0
4 1 0 1 0
23
4/8/2012
Squaring Matrix
1 2 3 4 M 1 2 3 0 1 0 0 0 1 0 0 0 1 0 0 4 1 0 1 0 X M 1 2 3 4 1 0 1 0 1 2 0 0 1 0 3 4 0 0 0 1 0 0 1 0 = Sq(M) 1 2 3 1 0 1 1 2 0 0 0 3 0 4 0 1 0 0 1 M 4 0 1 0 0 1 2 3 4 1 0 0 0 0 2 1 0 0 1 3 0 1 0 0 4 1 1 0 = 2 1 0 3 4 1 0 0 0 0 M3 2 0 1 0 0 3 1 0 1 0 4 1 0 0 1 X
Assignment
Convert this N/W into Matrix Using Adj.squ. matrix Method find out inconstancy.
2 3
-> See the 1s in the diagonal shows that inconsistency exists in this network -> Indicated that 2nd ,3rd and 4th nodes are having loop and inconstancy
Assignment
Convert this N/W into Matrix Using Adj.squ. matrix Method find out inconstancy is there or not. Find M4 and show the result
2 3 1
Marimonts Procedure
Draw the network diagram Number the Nodes Name the arcs Remove the source and Sink Node and Arc cant be deleted means ..Residual network exists and inconsistency exists
Marimonts Procedure
3 4
6
2 5
24
4/8/2012
Immediate Predecessors
--A A B,C B,D C,D B,D,E,F
Network
Job A B C D E F G Predecessors A B C D E F G X X 0 X X 0 X 0 X 0 0 X X 0 X 0 X
X X
B
-> List should be in topological order -> Convert the detail into tabular form as above with cross. Go to each and every cross and find the corresponding jobs and populate the cell with 0 -> If the cell is not empty and already crossed X then highlight ..Highlighted X is redundancy in network..
Time-Cost Relationship
Even you spend more money We cant reduce the time Direct Cost Of Job
Normal Cost
Crash Duration
Norma Duration -
Job Duration
25
4/8/2012
Duration
Project schedule influence the direct and indirect cost of the Project
A (Acitivity A)
A (Acitivity A)
A (Acitivity A)
26
4/8/2012
Discontinuous-Cost tradeoffs
J C O S t
Sample Project
F 2 A D
B 4 1
G 5 H
27
4/8/2012
Computations P1
Identify all the paths in the n/w Find the critical path Crashing has to be done in the critical path. Calculate the Cost Slope for Individual activity Tabulate the same -> All paths in the row -> All Activity in Column -> End of the row mention the total length of the path -> End of the column mention the how many days can be crashed -> In each cell mention the Cost slope of the activity
Computations P1
Activities Length Paths A B C D E F G H ADG 100 80 140 16 * (Critical Path) AF 100 60 14 BG 120 140 14 CEG 50 X 140 12 CH 50 100 5 ----------------------------------------------------------------------------1 2 1 2 0 2 2 1
Computation P2
Activities Length Paths A B C D E F G H ADG 100 80 140 14 * AF 100 60 14 * BG 120 140 14 * CEG 50 X 140 12 CH 50 100 5 ----------------------------------------------------------------------------1 2 1 0 0 2 2 1 - Activity Ds Cost slope is low. We have to choose first. - If we crash D we can reduce 2 days but we have to spend (80*2)=160 - Path length will change from 16 to 14 and D crash time become 0 - There are 3 critical paths . All are having 14 values
P3
Activities Length Paths A B C D E F G H ADG 100 80 140 13 * AF 100 60 13 * BG 120 140 13 * CEG 50 X 140 11 CH 50 100 5 ----------------------------------------------------------------------------0 2 1 1 0 2 1 1 We have to take all the 3 paths now AB (220) 1 (Minimum of AB) AG (240) -> 1 ( Min of AG) FG (200) -> 2 (It is cheapest ..But it is not optimal) DFB (260) D cant be crashed ..This option is not available New Option -> Crash AG by 1 day and relax D by 1 day (Not 2 days) ie (100+140-80)=160..This has become cheap and we have to work on this. D has become again 1 (Relaxed) G has become 1 (2-1) Path CEG become 11 Now Critical paths are same.
P4
Activities Length Paths A B C D E F G H ADG 100 80 140 12 * AF 100 60 12 * BG 120 140 12 * CEG 50 X 140 10 CH 50 100 5 ----------------------------------------------------------------------------0 2 1 1 0 1 0 1
We have to take all the 3 paths now AB (220) 1 (A is already crashed) AG (240) -> 1 (A is already crashed) FG (200) -> 1 (Minimum of F and G) ----We can take this DFB (260)-> 1 (Minimum D F B) G has become 0 F has become 1 from2 All critical path length bcome 12 Again 3 critical path
P5
Activities Length Paths A B C D E F G H ADG 100 80 140 AF 100 60 BG 120 140 CEG 50 X 140 CH 50 100 ----------------------------------------------------------------------------0 1 1 0 0 0 0 1
We have to take all the 3 paths now AB (220) 1 (A is already crashed) AG (240) -> 1 (A is already crashed) FG (200) -> 1 (G is already crashed) DFB (260)-> 1 (Minimum D F B) - Only option available D has become 0 F has become 0 B has become 1 All critical path value from 11 ADG Cant be crashed further because all A and D and G -Project cant be reduced further.11 day is the crash day.
11 * 11 * 11 * 10 5
28
4/8/2012
200 520
P4
Crash 1 day on AG and Relax 1 day on D 160 (100+140-80) 320 80*2 160 P3 Crashed D by 2 days
P2
P1 12 13 14 15 16
11
Managerial Decision on Z-T Curve Bounds of project duration and cost. Minimum budget for the project duration Minimum duration achievable for given budget The total project cost curve (Direct and indirect ) The project duration and schedule to achieve the minimum project cost (Graph for direct cost ,indirect cost and total cost)
Resource-Profiling
Project Network Activity Times
A C T I V I T Y
A1 A2
Resource 5 Resource 7 Resource 3 A3 Schedule Time No of resource required 3 No of resource required 10 Resource Usage Profile
RU ES 15 SA OG 10 UE 3 R C E Time
Renewable resources
In renewable resource the concern is with the total resource usage at each point of time
29
4/8/2012
Renewable resources
Manpower , Machines , Power - Resource Aggregation (What are the resource required during the schedule) - Resource Leveling (Change the schedule to get better profiling) - Limited resource allocation (Minimize the project duration)
Resource Aggregation
To construct resource usage profiles from The project schedule and activity resource data.
R(t)
Resource Levelling
To smoothen the resource usage profile By shifting the slack jobs without worsening Project duration.
Original Profile Job has been shifted to get better profile R(t) R(t)
Resource Allocation
By shifting the duration we can maintain the profile.
Resource Limited More resource is required Original Profile
Original t t
Changed Duration
Team Building
Projects are executed by the people Projects are managed by people working together as a team. Network technique should not be viewed as merely mathematical tool for planning and controlling the schedule for the projects. Network technique should be an integral part of the total process of team building.
Nature of Project Teams The project team is usually a new, temporary group with out previous experience working together. Complex projects require complex teams with the set of work rules and norms. High degree of learning and interdependency requires a well functioning cohesive teams.
30
4/8/2012
Operating Culture
Group Mind. Common set of objectives. Explicit Vs Implicit contract.
-
Group Maturation
Forming (First meeting)- They are individuals Purpose is not clear leadership pattern and Life span , hand shaking. Storming (Conflict stage), fight and negotiations some clarity stage Norming : Norms and Practices. Performing : Team is started performing.
31
4/8/2012
Leadership styles
Structuring
- Organize and direct the work of others. - Make each person accountable - Demonstrate Coaching - Tutoring - Role model - Joint effort Encouraging -Greater responsibility with doer -Recognize and praise the good work. Delegating Motivating by giving control
32