Slope Protection Design Specifications
Slope Protection Design Specifications
00
59.00
58.00
54.00
53.00 57.0
0
52.00 56.0
0
51.00 55.00
50.00 54.00
49.00 53.00
49.00
49.0 0
52.00
51.00
N
PI2
IO
CT
° 50
RO .58
= 92 T2 .00
TE
PI2 =1
E P 014
3.9
2m
B
OP +
SLTA. 0
60.00
S T1
0 20 cm thk. 211 kg/[Link]
49.0
P
conc. inclined wall cut off wall w/
m
.92
12mm Ø bars sp. 30cm
T1
13
O.C. B.W.
=
59.0
I 1=
Ss=
T2
0
04
59.00
24
2
1:1 LL
.54.
ON
PI 1
PC
SI
EL
TI 0
ZA 04 D
LI . 0 + EN
SL NA
OP STA
A
ST CA
EP .0 58.00
RO + 0
TE 36.1 B
CT
58.00 ION6
T1
A N 57.00
See End Wall Cut off 0 CTI
ON
PL
.00
PT Detail for Structural
00 TE
0 + PRO KS
57
2
Concrete Inclined Wall
A.
ST OPE OR
SL W 4
PC
.0
0 N 56.00
N
. 49
.00
1
.0 IO EL
56 0
S
49 0 R S D/
.0 50.0 VE
55 0 DI
55.00
0
.0 02 E
54 0
0 + ON
A. TI
ST LIZA
50.
00 SE
.0 ON
TI 053
NA
54.00
53 0 CA
ZA
LI . 0 +
.0 A NA A
CA ST
52 0 51 t EL
.5 1.14
.0 .00 es
53
51 0
Cr
Da
m
.00
.0
50 52.00
A 4
.2
. 49
EL
S
U/
ON
Ss= TI 0
ZA + 06 . 57
.0
4
04
LI . 0
.5:1 EL
00
NA A
.54.
50.00 CA ST 53.0
EL
0
0+0
04
.54.
EL
54.0 .5
4.
04
0 EL
.00
. 50
0
CB
49.0
52
55.0
)
1:1
0
0
51.0
s=
(S
0
56.0
52.00
52.0
E
0
UT
0
00
00
RO
.00
50.0
0+
50.
A.
.00
52
D
ST
AN
.00
53
54
53.00
RY
K 57.0
00
0
55.
0
DA
N
.0
A
56
B
UN
T
BO
H SL
ON
TI 080
IG S
O PE TA. 0
0
+ ZA
.00
58.0
ON
LI 0
.0
NA A.
R 0
52.00 PR CA ST
52
OT + 134
51
Point
I
CT
of
EC .6
TIO 8
Intersection
(Ss=
TE
( PI )
1:1 N
O
I = Deflection Angle
) PC
PR
E
50.00
3 59.0
G
0
E
ED
OP
51.00
SL
R
AL
TE
IN
E = External T
=
A
60.00 Tan
IG
Distance ge
W
nt
m
OR
h Len
50.00
gt
.42
gt
Len h
T
nt
ge Lc = Length of curve
4
H
Tan
=1
=
E
IG
T
.00
G
T3
53
R
D
49.00
E
60.00
M = Middle Ordinate
R
E
T
PC = Point of Curvature
A
PT = Point of Tangency LC = Length of Chord
SL
W
°
3
30
OP
PI
10 N
FT
0 TIO
I3=
0
59.00
ST ROT
A. A
EP
ST LIZ
E
A. EC
NA
49.00 ST
CA
0
D A
0 + TIO
CA RA . 0 + 4.0
5 58.00
16 N
2m N IN 09
4.4
2.8
=1 A A 7
LI G .5
T3
6
ZA E 0
48.00 TI CR
D
PT
N 57.00
N
Ra
U
.0
s
diu
55
O
57
diu
MIXTURE) MORTAR/CONCRETE BINDER
.0
R
Ra
0
s=R
AND CLASS B (1:3 MIXTURE) FOR
.00 58.0
G
51
R=
FINISHING 0
L
A
.00
52
R
FORMULA:
TU
SL
.00
0
OP
53
0+ N
.0
A
A. TIO
12
ST ROT
58
ST ZA
N
A. E
P
LI
NA
I/2 I/2 LENGTH OF CURVE= 2*(pi)*R*(I/360)
0 + CT
CA
0
18 ION
.0 WHERE:
54
4.9
0 .0
5
0 T- TANGENT (m)
57
.0
49 R- RADIUS (m)
PC
0
.0
9m O pi- 3.1416
= 7.9
T4
PI4
SL
O PE ST
PR A. 0
14 N
. 0 TIO
9m
0
A A
OT + 7.9
ST LIZ
+
EC 200 =
N
T4
CA
0
TI .89 .0
ON 56
47
SL
.0
PT C5
0
OP
P
4
ST ROT
0
EP
.0 D
A. EC
48
L
N
U
0 + TI
O
E
G
R
CAPPIN
21 ON
G
R
3.0
L
R
A
0
R
53.0
A
U
T
B
PILE W/
A
SLOPE A. 0 + 262.5
N
ST
7
PROT
SHEET
+ 171.0
TION
.00
0
16
.00
Ss=
50
LIZA
SLOPE PRO + 255.41
0+
51
ECTION0
A.
NA
C
1.5
ST
0
48.0
CA
STEEL
STA. 0
:1
STA. 0
49.00
=2
9 .3
0
GENERAL NOTES:
TECTION
T5
ST AIN IZAT
STATION OF
CA
POINT OF INTERSECTION
NO. (m) (m) (m) OTHERWISE SPECIFIED.
ATION
+ 180
PC PT
A
K
BAN
CANALIZATION
STA. 0 + 200
LEF
T 2 0+28.50 92 92 00 00 13.92 13.44 21.58 0+14.58 0+36.16 OTHERWISE SPECIFIED.
SLUICE 210
CANALIZATION