Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Flatsider 6: Assembly Instructions

Download as pdf
Download as pdf
You are on page 1of 8

ASSEMBLY INSTRUCTIONS

6 ELEMENT - 11 METER
MONOBANDER

FLATSIDER 6
Mac0 Manufacturing Co. - Division of Majestic Communications, Inc.
4091 Viscount - Memphis, Tennessee 38118 (901) 794-9494
MAC0 FLATSIDER 6
PARTS LIST
0 D SIZE LENGTH
PART GTY a DESCRIPTION CHECKLIST
T52P 2 2” .057” 80” Alum. Tubing slotted one end
T31P 2 2” .047” 80” Alum. Tubing swaged one end/slotted
other end
T53P 1 1.845” .060” 80” Alum. Tubing
TllP 8 518” .047” 72” Alum. Tubing slotted both ends
T57P 2 2” .047” 36” Alum. Tubing swaged one end tol.875
TO1 8 l/2” .041” 72” Alum. Tubing
T04P 2 l/2” .041” 72” Alum. Tubing slotted one end
T58P 2 318” .035” I 1 718” Alum. Tubing - Hard
2600 1 5KW Gamma Match
WD2P 1 6/18 25’ Steel Guy Cable
VO3P 1 1”x 1” 24’ Vertical Guy Support
POlP 1 8” 2” Boom to 2” Mast Plate
WO4P 14 GA. 90’ Stranded Copper Antenna Wire
FA2P 4 48” Multi-Screen Fiberglass Rods

UOl 20 2” Plated U-Bolts

so1 20 2” Plated Saddles

EGl 4 Egg Insulators


N18 2 5/l 6” Eye Bolts
PLl 2 318” Plastic Caps - Black
PL2 10 .437” Plastic Caps - Black
PL5 1 2” Plastic Caps - Black
PLSR 1 2” Plastic Cap - Red
co2 2 l/2” Metal Clamps - Al l/2
S42 1 Coax. Conn. w/ Mounting Nut
ZO2P 2 4” Gamma Straps
ZO8P 2 Gamma Straps f/ Coax Connectors
NO1 44 5/l 6” Hex Nuts
NO2 40 5116” Lockwashers
Nil 22 1 O-24 Square Nuts
s21 21 1 O-24 l/2” Machine Screws
W58P 1 2 518” Extruded Alum. Clamps
N12 8 No. 10 Lockwashers
N26 4 No. 10 Flatwashers

BE2P 7 2” Boom to 5/8” Element Mounts


WHEN ORDERING REPLACEMENT PARTS, ALWAYS GIVE PART NUMBER AND DESCRIPTION.
PLEASE NOTE: In an effort to keep the price on Mace Antennas down, we have decided not to clean up all the burrs and rough
edges on the parts. We recommend that you debut-r and clean up each part with files, sandpaper, etc. so that they go together
easily. We are aware this needs to be done, but have elected not to do it to save you the money we would have to add to the
price of the kit for this service.
1 FLATSIDER 6
r REFLECTOR
(SEE FIG. 38)

i I- D R I V E N ELEMENT
PL5 - BLACK
PLASTIC CAP

GA .MMA MATCH
(SEE FIG. 4)

1 st DIRECTOR

2nd DIRECTOR J
(16’ - 6”) A
PLSR - RED
3rd DIRECTOR PLASTIC CAF ,
(16’ - 6”)
A

4th DIRECTOR -/
(16’ - 2”)
A

NOTES:
&OR DETAILS OF BOOM & GUY ASSEMBLY AND MAST MOUNTING, SEE FIG. 2.
AFOR DETAILS OF ELEMENT ASSEMBLY AND MOUNTING, SEE FIG. 3.

GENERAL ASSEMBLY <@%D

FLATSTDER 6 2
MAC0 FLATSIDER 6
ASSEMBLY INSTRUCTIONS

FIGURE 1 GENERAL INSTRUCTIONS


This drawing depicts an overall view of what the antenna should look like upon completion of
assembly. Refer to Figures 2 thru4 for specific assembly details. All hardware should be coated with a silicon
rubber sealant or similar compound to insure that wind vibration does not cause it to work loose.
Upon completion of assembly, install the red plastic cap (PLSR) on the director end of the antenna,
and the black cap (PL5) on the reflector end. This will allow you to determine at a glance the direction of
transmit and receive.

FIGURE 2 BOOM & GUY ASSEMBLY


To assemble the boom, first mark the center of the boom coupler (T53) and slide the unslotted ends
of the center boom sections (T52P) over the each end of the coupler so that they butt in the center. Next attach
the boom-to-mast plate (POlP) and the vertical guy support (VO3P) at the boom center using 2” U-bolts,
saddles and hardware as shown. (Refer to Detail 2A.)
Now, slide the swaged ends of the intermediate boom sections (T3 1P) into the slotted ends of the
center boom sections. Secure with 2” U-bolts, saddle and hardware as shown. (Refer to Detail 2B.) Next,
slide the swaged ends of the boom sections and secure in the same manner. (Refer to Detail 2B.)
The first step in assembling the guy cable is to cut four lengths of 2 feet each off the roll of cable.
Take two 2 foot lengths and attach one end of each to an egg insulator (EGl) and the other end to an eyebolt
(N18) so that the distance between the eyebolt and the insulator is 1 foot. Attach both eyebolts to the vertical
guy support with 5/l 6” hexnuts as shown in detail 2C. Run the outside hex nuts only a couple of turns onto
the ends of the eyebolts and leave the inside nuts loose so that you can take the slack out of the cable later.
Now take two 2 foot lengths and attach an egg insulator to one end of each in the same manner. (At this point,
it is necessary to go on to element assembly and mounting, before completing the guy cable assembly.
Take both 2 foot cable lengths with the egg insulators attached and fasten one to the boom and the
driven element and the other at the 3rd director. Wrap as shown in Detail 2D so that the distance between
the boom and insulator is 1 ft.
Now take the remaining cable and allowing approximately 9” at each end for wrapping, stretch it
between the insulators one end of the boom and cut it off. Leaving as little slack as possible, wrap each end
of the cable around the insulators as shown in details 2C and 2D.
Do the same thing for the cable on the other end of the boom. Take the rest of the slack out of the
cables by tightening the outside hex nuts on the eyebolts. Lock them in place by tightening the inside hex
nuts. This antenna is designed for mounting on a 2” O.D. heavy duty mast. Mount using 2” U-bolts, saddles
and hardware as shown in Detail 2E.

FIGURE 3 ELEMENT ASSEMBLY


Prior to assembling elements slide a boom-to-element mount (BE2P) onto each ofthe (6) element center sections
(TllP). Assemble each element as shown using the clamps and hardware specified. Refer to the element table to
determine dimensions for each element. Install a black plastic cap (PL2) onto both ends of each element. Assemble the
reflector elements in the same manner, sliding the fiberglass arms approximately 6 inches into the ends of the center
sections (TllP). Snug the clamps but don’t tighten at this time because the arms will have to be adjusted after installing
the reflector wire.

3 FLATSIDER 6
FIGURE 3B ELEMENT MOUNTING
Mark each element at the center and be sure that the boom-to-element mounts (BE2P) are centered on the
elements before tightening hardware. Starting 1” from the director end of the boom, mount each element using 2” U-
bolts, saddles, boom-to-element mounts and hardware as shown. Refer to Figures 1 & 3B for element spacing
dimensions. (At this point go back and complete the guy cable assembly.)

FIGURE 3C REFLECTOR ASSEMBLY


The length of the reflector wire is very critical. It must be the correct length to operate correctly. Take the wire
(WO4P) and uncoil it making sure that there are no kinks; secure it to a nail. Pull the wire until it stretches an inch or
so. The easy way to get the correct length for the reflector loop is as follows:
1. Drive 2 nails in a board or fence l/2 the length of the loop apart --which is 22% l/2” between them.
2. Stretch the wire around the nails by hand as tightly as possible and splice ends together. Solder the splice. Remove
one nail and remove the loop. Cut any excess wire off.
3. Loosely assemble the machine screws (S2 l), flatwashers (N26), lo&washers (N12), and hex nuts
(NO6) onto the lugs of the fiberglass arms, adjusting the length as shown.
4. Tighten 3 of the 4 clamps that hold the fiberglass rods.
5. Install the wire as shown.
6. Tighten the wire by pulling the fourth fiberglass rod until the wire is the same tightness as it was
around the nails. The wire loop is now the correct length. Note the total length of the loop is critical, and also is the
length of each side. REMEMBER: Reflector dimensions are only preliminary. Change to get equal sides of 9’ 4-3/
4” . Fiberglass length is not critical, however the equal wire length of 9’ 4-3/4” is very critical.
7. Take the remaining reflector wire and thread it through the drill holes in the four spreaders pulling stung and splicing
each piece. This completes the reflector assembly.

FIGURE 4 GAMMA MATCH MOUNTING


Mount the gamma match (GO 1P) to the horizontal driven element, using the gamma strap (ZO2P, ZOSP) and
attaching hardware as shown. Attach your 52 ohm coaxial cable to the connector (S42) and dress along boom and down
the mast.

ADJUSTING STANDING WAVE RATIO


Refer to Figure 4. The dimensions given are approximate and should be used as a starting point. The following
instructions cover the adjustment of one gamma match. To adjust the second gamma match, simply repeat this
procedure.
The gamma match has 2 adjustments. First is the capacitor adjust and the second is the slider adjust. Connect
a S W .R bridge to the coax between your transmitter and the antenna and check the S .W .R. If adjustment is required
loosen the clamp on the gamma match and the screws holding the slider (Gamma Straps ZO2P). Next move the capacitor
adjustment first in one direction then the other until a minimum S.W.R. reading is obtained. If S.W.R. is not yet
satisfactory, move the slider out 2” away from the boom. Ifthe reading has gone up, move the slider back to the original
position and then 2” toward the boom. Now readjust the capacitor for minimum S.W.R. you should now be able to
determine which direction to move the slider. Repeat the above procedure moving the slider in smaller increments until
a satisfactory S.W.R. reading is obtained. Tighten all hardware. Disconnect the S.W.R. bridge and reconnect your
coaxial cable.
the screws. Bring the ends together and lineup the marks that are 2” from each end. Now twist the loose
ends together and solder as shown. Adjust each fiberglass arm so that the reflector wire becomes taut and
each leg of the square is 9’ -4 3/4” and tighten the clamps. A slight natural bowing of the fiberglass is normal.
This will not affect normal operation of the antenna as long as the lengths of wire are correct.

FLATSIDER 6
c--__-__-------- --w-v-----.
I 3P -VERTICAL
I Y SUPPORT PO1 P - BOOM-
TO-MAST PLATE

I / i
, SLOTTED
BOOM
; SECTION

I I
L UOl. SOI. NOl. N O 2 I
I 2” U-BOLT a SADDLE
5116” N U T S A N D W A S H E R S
I 5116” N U T S a W A S H E R S
I DE1 A l l 2A
D E T A I L 28 (TYP 5 PLACES),/
\ (TYPICAL 4 PLACES) I
L------------ - ---k ,_________ - - - - - - - - - e - w - - -
* -.
NO’I‘E.
HORIZONTAL ELEMENTS ONLY ARE SHOWN FOR REFERE

3rd DIRECTOR
* DRIVEN ELEMENT

COUPLER

I i
I OOM WITH BOOM-TO-
1 EGl - I N S U L A T O R MAST PLATE ATTACH&
VO3P - V E R T I C A L I
GUY SUPPPPORT I i
I I I
I I
I I
I I
I I
I I
I I
I
I
I
I 1
I I
I I
I I
I
I
I I 1
I I I
I N16, NO1 I
4” EYEBOLT I I
I I
5/16” HEXNUTS I
I I I
I WD4P LUOI, SO1, NOl. N 0 2 . I
I GUY CABL 2 ” U-BOLTS a S A D D L E S
I
I
I
I
a I
i
/
LHORIZONTAL
” I
5116” N U T S a WASHFRS

I BOOM-TO- I L 2” O.D. MAST


I I E L E M E N T M O U N TI (CUSTOMER FURNISHED) ;
I INSULATOR I I
I I
I DETAIL 2D
D E T A I L 2C 1, ( T Y P I C A L 2 P L A C E S ) A D E T A I L 2E I
\
N4 --._ __----- _ _ _ _ _ _ _ _ _ _ ---/ d_____ _------__ / k----------- - - - - - - /

5 FLATSIDER 6
_-----__---- _______--- - __-_______-_----
W58P. SZI. Nil.
I 1 A
DIMENSION
I R I
C L A M P W I T H #10-24x l/2”
S C R E W & SQ N U T \SCREW 8 SQ. NUT
\

FAl P
FIBERGLASS
ARM

\
\ /.6-y. \ IREFLECTORDIM$NSI~NSA~~NLYPRELIMI- I

5/8” 0. D
TUBING

I
I
I
I
I
I I
I I
I I
I I
I - ---I i
I “A”- I
\ E L E M E N T A S S E M B L Y ( F I G U R E 3A)
___-__--__-----------
I
~-----~--~~-~------ .------------------(
I TllP-
B
B
E
MOUNT

VERTICAL
ELEMENT I
IOM
UOl. Sol. NOl, N O 2 / I
IUO,. S O 1 NOI. NOA 2” U-BOLT & S A D D L E
12” U-SOL-r 8 SADDLE 5/16” NUTS t?. W A S H E R S
u
l5/16” NUTS & W A S H E R S I
I H O R I Z O N I AL ELEMENT MOUNTING ELEMENT SPACING I
I VERTICAL ELEMENT MOUNTING
\ F I G U R E 38 :
> - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - ---------------------------------<
\
I
IPlease read the Assembly and Troubleshooting Tips at the 1 I
end of this instruction booklet before assembling elements.
I
I
I
I
I FIBERGLASS ARM
I
I
I /
I ,/’ S21, Nil, Nl
I /’ #I u-24 x l/Z”
I .’ FLT WSHR
8tSQ N U T REFLECTOR ASSEMBLY
( F I G U R E 3C)
;z
Y,-4 3
wo4 P - -
4 E Q RtFLEClOR W
I / (.i-WIS-r ENDS T
’ VERY 8 SOLDER)
’ CRITICAL
\

ELEMENT ASSEMBLY & MOUNTING @@k@


FLATSIDER 6 6
* NOTE: THESE DIMENSONS ARE APPROXI-
MATE. REFER TO THE INSTRUCTIONS ON
ADJUSTINNG THE S.W.R. TO DETERMINE EX-
ACT SETTINGS. THERE ARE 2 SEPARATE
GAMMA ADJUSTMENTS, 1. CAPACITOR AD-
JUSTMENT, 2. SLIDER POSITION.
DO NOT MOVE BOTH AT THE SAME TIME.
MOVE THE CAPACITOR FIRST, THEN, IF NEC-
ESSARY MOVE THE SLIDER, AND GO BACK TO
THE CAPACITOR.

ZO8P - GAMMA STRAPS


HORIZONTAL SLIDER ADJUST: 23” (INSTALL FLUSH AGAINST
VERTICAL SLIDER ADJUST: 17” BOOM-TO-ELEMENT MOUNT)

LK. WSHR. & SQ. NUT

HORIZONTAL DRIVEN
ELEMENT r-.
\

\
I I-. .
\ \
I 3/8” 24 NUT
\ ‘-. \
‘ C U S T O M E R FURNISHEiI
COAXIAL CABLE

3/8” S T A R W S H R . ‘ - xi I
7521. Nil. N 1 2

sy~~~~HER \

3/8” PLASTIC
SHOULDER-
ZO2P WASHER
GAMMA STRAPS
(SLIDER)

HORIZONTAL CAPACITOR ADJUSTMENT: 1”


VERTICAL CAPACITOR ADJUSTMENT: 1 112”

L GO1
P HORIZONTAL/VERTICAL
GAMMA MATCH

GAMMA MATCH MOUNTING c=D


FLATSIDER 6

You might also like