RAPDRP (Part-B) Implementation in MPPKVVCL Indore: K.L. Patidar
RAPDRP (Part-B) Implementation in MPPKVVCL Indore: K.L. Patidar
RAPDRP (Part-B) Implementation in MPPKVVCL Indore: K.L. Patidar
K.L. PATIDAR
Executive Engineer (RAPDRP) MP Paschim Kshetra Vidyut Vitaran Co. Ltd.
Introduction
As a part of distribution reforms, GOI launched APDP (Accelerated Power Development Program) in 2001 which was later rechristened as APDRP (Accelerated Power Development and Reforms Program) during the 10th Five Year Plan. To continue the support to distribution reforms during the 11th Five Year Plan, GOI has reintroduced R-APDRP (Restructured APDRP) with revised terms and conditions. The R-APDRP primarily aims at reducing Aggregate Technical and Commercial (AT&C) losses in urban areas.
It is a necessary condition of the scheme that the utilities would need to demonstrate performance improvement for availing financial benefits provided under the scheme.
Introduction
(Contd...)
The R-APDRP program covers urban areas towns and cities with population of more than 30,000 & having AT&C Losses above 15%. MOP, GOI has appointed Power Finance Corporation as the Nodal Agency for implementing this program.
Scope of Works
Part-A includes among others: Consumer Indexing, GIS Mapping, Asset Mapping Metering of Distribution Transformers / Feeders, Automatic Data Logging Feeder Segregation/ Ring Fencing IT applications for redressal of consumer grievances, meter reading, billing & collection,
Energy Audit
Scope of Works
Part-B will include among others:-
(Contd...)
New 33/11 KV substation. Augmentation of power transformers and installation of addl. PTs. 33KV line on single and double suspension with Panther conductor. New 33 KV and 11 KV line with AAA Dog conductor/XLPE Cable. Augmentation of conductor size of existing 33 and 11 KV lines. HVDS scheme using 16 KVA and 25 KVA transformer. Installation, Augmentation and Relocation of distribution transformers. New LT line & reconductoring by XLPE AB Cable size 3x50+1x35+1x16 sq.mm and replacement of bare conductor by 3x95+1x70+1x16
GoI through PFC is providing 25% Loan for Part B of the schemes (90% for special category States). The counterpart funding (75%) has been arranged from REC.
Nodal Agency
(PFC)
Process Consultant
Technical Advisors
Utilities
Monitoring Agencies
As on 31-07-2013
Provision/Progress
538.76 Crs.
23 Nos. 03 Nos. 375.30 Crs. 116.31 Crs. 20 Nos. 117.41 Crs.
Total Cost
Total Towns Towns on Turn-Key Cost of Turn-Key Award Progress of Turn-Key Project Towns of Departmental Works Cost of Departmental Works
8 9
115.96 Crs.
Nepanagar, Burhanpur, Mandsaur, Barwani, Khargone, Khandwa, Baranagar & Sanawad
As on 31/07/2013
Total Financial Planned Amount Effective Progress Completion Disbursed Date Date Rs. Cr. Rs. Cr.
1 Indore Indore
87.31
101.01
M/s Ramky Infra, Ujjain Ujjain 83.77 23-02-2012 23-03-2012 22-09-2013 Hyderabad
9.74
3.76
M/s Ramky 3 Dewas Dewas Infra, 58.55 17.12.2011 11.01.2012 10.07.2013 Hyderabad
10.55
11.53
Name of Town.
Nepanagar Jhabua Khandwa Mandsaur
Cost of Scheduled Executed Present status of Sanctioned completion cost work completion DPR(Rs. Lacs) Month (Rs. Lacs)
152 180 364 439 Dec-12 Dec-12 Dec-12 Dec-12 173.23 225.18 406.28 570.97 Dec-12 Dec-12 Dec-12 Dec-12
Remarks
5
6 7 8 9 10 11 12
Barwani
Khargone Barnagar Agar Dhar Mhow Barwah Shujalpur
211
509 325 404 249 664 221 370
Jan-13
Jan-13 Jan-13 Mar-13 Mar-13 Jan-13 Mar-13 Mar-13
244.88
556.5 329.33 410.65 248.79 721.74 221.71 364.14
Jan-13
Jan-13 Mar-13 Mar-13 Mar-13 Jan-13 Mar-13 Mar-13
13
Sendhwa
894
Mar-13
916.40
Apr-13
Remarks
1381.98
833.48 666.38 741.67 522.07
110%
97% 82% 87% 84%
Completed in July2013
439.89
10101.30 1152.95
49%
37% 21%
376.34
23243.65
4%
43%
EFFECT OF RAPDRP PART-B WORKS EXECUTED DEPARTMENTAL (PROJECT COST 117.41 CR) 120
100 80 60 96.69 99.07 99.34 79.08 99.81 83.23 AT&C LOSSES IN % BILLING EFFICIENCY IN %
72.19
75.07
40
20 0
30.22
25.63
21.44
16.93
COLLECTION EFFICIENCY IN %
Freeze AT&C
2010-11
2011-12
2012-13
EFFECT OF RAPDRP PART-B WORKS EXECUTED DEPARTMENTAL (PROJECT COST 117.41 CR) S.No. 1 2 3 4 5 6 7 8 PARAMETERS AT&C LOSSES IN % BILLING EFFICIENCY IN % COLLECTION EFFICIENCY IN % TOTAL INPUT UNITS IN (LU) TOTAL SOLD UNITS IN (LU) TOTAL DEMAND IN (Lacs) TOTAL COLLECTION IN (Lacs) SAVING IN INPUT ENERGY (LU) Freeze AT&C 30.22 72.19 96.69 0 0 0 0 0 2010-11 25.63 75.07 99.07 11129.7 8355.14 44983.33 44567.67 0 2011-12 21.44 79.08 99.34 11842.94 (6.4%) 9366.24 (12.1%) 53760.1 (19.51%) 53407.11 (19.83%) 633.24 2012-13 16.93 83.23 99.81 12117.57 (8.87%) 10085.97 (20.71%) 63837.7 (41.91%) 63716.9 (42.96%) 1317.73
Freeze in Jan-11
18.19
2010-11
11.24
2011-12
8.44
2012-13
5.2
2 3
4 5 6 7 8 9 10 11
15.99 30.83
25.88 17 26.2 22.27 46.42 26.27 25.3 33.58
20.77 28
26.45 17 21.4 18.6 61 28.5 29.1 31.66
16.57 20.53
21.52 16.8 19.2 18.6 36.7 23.4 24.6 21.77
8.87 12.2
12.88 13.9 14.8 14.9 15.1 17.5 19.9 19.9
The scheme also envisages the provision of incentive for utility staff in towns where AT&C loss levels are brought below 15%. Details of the incentive scheme and the milestones/ achievements that trigger incentive payments shall be decided. A separate amount equivalent to 2% (max.) of the grant for Part-B project is allocated for this purpose.