Basic ESP Training: Introduction To Electrical Submersible Pump (ESP) System
Basic ESP Training: Introduction To Electrical Submersible Pump (ESP) System
Basic ESP Training: Introduction To Electrical Submersible Pump (ESP) System
Motor Controllers
Surface Equipments
Wellhead
Junction Box
Transformer
Amp Chart Recorder
3-Phase Choke
WellHead
The Wellhead is the equipment that is installed at the surface of the well bore.
FROM
JUNCTION
BOX
SURFACE POWER
PLUG
PENETRATOR
WELL HEAD
CONNECTOR
ASSEMBLY
ATTACHABLE
CONNETOR
(ASSEMBLY)
STRAPPED
CABLE BAND
TUBING HANGER
O RING
PRODUCTION TUBING
POWER CABLE
FROM JBOX
GLAND NUT
WELL HEAD
PACK OFF
ASSEMBLY
O RING
RUBBER SEAL
METALSPLIT
RING
JUNCTION BOX
FUNCTION:
Ventilation for gas that possibly
comes up to surface through the
cable
Connection terminals, easier to
reverse motor rotation and to take
initial readings.
7
TRANSFORMER
The transformer sends the correct voltage
for designed surface voltage for the
proper motor operation.
This is based on power rating in KVA.
CORE
WINDING
Sample :
24
AWG #1
103
11
AmpChart Recorder
13
Current Transformer
14