Innovative drilling fluid technology and global support for greater drilling productivity.
AMC Drilling
Fluids
Topics to be discussed
Blast hole rigs and BHS application.
BHS usage rates.
Feedback.
Costs and savings.
Future forecasts.
Future trials.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Innovative drilling fluid technology and global support for greater drilling productivity.
Feedback
15 holes drilled with BHS in total.
4 Camera sent up
8 No mud holes
2 PVC Casing
29th March - second camera footage was completed.
31st March - meetings with management team at Evolution.
11th April - Peter Keen, UG Drill Supervisor, will present to entire UG
crew. JB will be present.
11th April - 2nd rig timeframe will be announced and converted as
soon as possible.
22nd 25th April Trial with new formulation.
Innovative drilling fluid technology and global support for greater drilling productivity.
Cost Savings
Initial cost to resource
company
20M PVC @ $14.50
20M BHS @ 10LCube
20M BHS @ 10LPOD
350M Quota for 2 rigs
175M Converted Rig 24 hour
period
PVC
BHS Cube
BHS POD
Per Annum
BHS Cube
BHS POD
Redrills
2nd Vehicle Fuel
Labour time
Cost
$2,000
$96.66
$66.00
$59.40
$845.75
$577.50
$519.75
Innovative drilling fluid technology and global support for greater drilling productivity.
Saving
$30.66
$41.40
$268.25
$326.00
$97,911.25
$118,990.00
700,000.00
600,000.00
500,000.00
Costs
400,000.00
300,000.00
200,000.00
100,000.00
PVC Full
BHS
No redrills
No Fuel
Innovative drilling fluid technology and global support for greater drilling productivity.
No Labour
No Driller time
Total Costs
Other benefits
Storage PVC
pallets BHS.
QHSE
personnel
Drilling
More metres can be achieved because drillers do not need to
install casing.
Contractors Evolution have already stated that if the trials are successful then
they will
enforce contractors to use it in place of PVC. Evolution are
buying direct so
the fluid is already paid for.