Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Introduction To Reliability

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 95
At a glance
Powered by AI
The key takeaways are the differences between reliability and quality, various reliability tools like QFD, DOE, and the importance of designing for reliability from the start.

Reliability is concerned with product performance over its entire lifetime while quality is concerned with product performance at a single point in time, usually during manufacturing. Reliability assures components function without failure for the desired period while quality assures conformance to specifications.

Some reliability tools discussed are Quality Function Deployment (QFD), Design of Experiments (DOE), Reliability Centered Maintenance (RCM).

Introduction to

Reliability
Dan Burrows
ASQ Reliability Division Region 12 Reliability Councilor
Corporate Reliability Director, Panduit Corporation
d1c1b1@hotmail.com
708-532-1800 ext. 81894

Introduction to Reliability 1
Reliability vs. Quality (Glesner, Kececioglu, et al.)

Reliability Assurance
is the ability of a system or component to
perform its required functions under stated
conditions, for a specified period of time.

Quality Assurance
is a set of activities whose purpose is to
demonstrate that a product meets all quality
requirements.

Introduction to Reliability 2
Reliability vs. Quality (Glesner, Kececioglu, et al.)

Reliability
is concerned with the performance of a product over its entire lifetime
assures that components, equipment and systems function without
failure for desired periods during their whole design life, from
conception (birth) to junking (death)

Quality
is concerned with the performance of a product at one point in time
usually during the manufacturing process
assures conformance to specifications
checks that the incoming parts and components meet specifications
assures products are inspected and tested correctly
is a single, albeit vital, link in the total reliability process

Introduction to Reliability 3
Reliability vs. Quality (Burrows)

I hope this isnt true or stops being true


Quality in many organizations has devolved into being inspection
after the fact instead of designing for what is needed to assure
customer satisfaction.
Reliability is Quality and Quality is Reliability
Reliability is Quality Over Time
Quality and Reliability Must be Designed For!
If you are not involved in the product and process design, you
will be playing catch up and clean up your entire career.
If you are not teaching and coaching others, you are not helping
as much as you can.

Introduction to Reliability 4
Agenda
Facilitator
Dan Burrows, ASQ Reliability Division Regional Councilor
E-mail: d1c1b1@hotmail.com
Phone: 708-532-1800 ext. 81894
Agenda
Reliability Approach
Reliability Roles
Reliability Tools
Discussion
Questions/Comments Encouraged
We may Parking Lot some questions

Introduction to Reliability 5
Its All About Excellence!

Introduction to Reliability 6
Recommended References / Training Guides

www.qualitycouncil.com www.quanterion.com www.theriac.org

Introduction to Reliability 7
Reliability Approach

Introduction to Reliability 8
This Is Where We Want To Go
Reliability is an integral part of how your company
develops products and production systems
Plan for it - Design for it - Do it (and verify) - Learn from it (and
get even better)
Customer focus
External customers stay and new customers come to your
company based on reliability
Internal customers get better designs and more effective
production systems to succeed with
Business performance improves
Better and Possibly Faster Product and Production System
Launch
Increased Customer Satisfaction
Increased Overall Equipment Effectiveness
Introduction to Reliability 9
Scope of Efforts

Some companies choose to scope their efforts...

Complex Products - Products that have several layers of


complexity and active electrical and mechanical elements

Critical Applications - Products that are used in critical


applications with stringent government or industry requirements

Production Systems - Production Systems that are critical to


internal performance even if the product made is not a risk

Introduction to Reliability 10
Reliability Definition vs. the Real World
Reliability is the probability that an item can perform its intended
function for a specified interval under stated conditions following
prescribed procedures.

There are Real World conflicts with this textbook definition


that we need to keep in mind
Probability Customers expect a probability of 1, It Works
Intended Function The product may be used in unintended
ways and still be expected to work
Under Stated Conditions The product may be operated
outside of the stated conditions and still be expected to work
Prescribed Procedures Customers may not have the
required tools or skill level and may not follow procedures and
still expect the product to work

Customers are looking for Quality over Time


Introduction to Reliability 11
Kano Model Where Is Reliability?
Customer Satisfaction
Very
Satisfied l
n a
Exciting or Attractive io
s
en re,

Over Time
Customer Delight
Unexpected im o
New e -D is m ss
n re le
O o si s
M s
Le
Did Not Do Fully Degree of
Achieved Achievement
Expected or Must Have
Basic Requirements
Industry Standard
Goes Without Saying

Very
Dissatisfied

Introduction to Reliability 12
How Can Reliability Help?
Reliability Tools
Focused Efforts on Critical Areas
Efficient and Effective implementation
Supports Product Development (e.g.. Stage Gate)
Life Cycle Perspective
Customer expectation of reliability does not stop when the product ships
or the warranty period is over
We must know how the product performs over the intended life and feed
that knowledge back for Continuous Improvement
Total Cost of Ownership versus Lowest Sticker Price
Higher Overall Equipment Effectiveness leads to Lowest Production
Cost
Quality System
Reliability efforts support ISO 9001
Clause 7 Product Realization
Clause 8 Measurement Analysis and Improvement

Introduction to Reliability 13
The Right Tool at the Right Time

Product Development Stages


Forward Project Detail Prototype Pilot Build Production
Project Planning & Design & Build & & Final &
Planning Conceptual Costing Test Documenta Operation
Design tion
Field Data QFD FMEA FMEA FMEA Field Data
Collection FMEA R&M R&M R&M Collection
& Analysis R&M Analysis Analysis Analysis & Analysis
QFD Analysis DOE Reliability Reliability CAPA
LCC DOE LCC Test Test FMEA
LCC DOE DOE DOE
LCC LCC LCC

Introduction to Reliability 14
Reliability Training
Body HRS Senior Marketing New Prod Sourcing Mfg Support & Quality
Of Mgmt Finance Develop Matl Plan Mfg Eng Training
Knowledge Tech Service

Overview 1 A (All) A (All) A (All) A (All) A (All) A (All) A (All)


Quality Function D-8 D (All) D (Key) D (Key) D (Key)
Deployment
A-1 A (Other) A (Other) A (Key) A (Other)
Failure Mode and D-8 D (Key) D (Key) D (Key)
Effects Analysis
A-1 A (All) A (All) A (Other) A (Key) A (Other) A (Key) A (Other)
Reliability & D-8 D (Key) D (Key) D (Key) D (Key)
Maintainability
Analysis A-1 A (All) A (All) A (Other) A (Key) A (Other) A (Other)

Field Data D-4 D (Key) D (Key) D (Key) D (Key)


Collection and
Analysis A-1 A (All) A (Other) A (Other) A (Key) A (Other) A (Other)

Corrective and D-4 D (All) D (Key) D (Key) D (Key) D (Key) D (Key) D (All)
Preventive Action
A-1 A (Other) A (Other) A (Other) A (Other) A (Other)

Design of D-16 D (Key) D (Key) D (Key)


Experiments
A-1 A (All) A (Other) A (Other) A (Other)

Life Cycle Cost D-4 D (All) D (Key) D (Key) D (Key) D (Key) D (Key) D (Key)
A-1 A (Other) A (Other) A (Other) A (Other) A (Other)
Reliability Testing D-4 D (Key) D (Key) D (Key) D (Key)
A-1 A (All) A (All) A (Other) A (Key) A (Other) A (Other)
D Detailed Off(12,22h) Key(8,24h) Key(11,57h) Key(8,13h) Key(11,45h) Key(8,27h) Key(4,57h)
A - Awareness Oth(28,8h) Oth(65,9h) Oth(55,3h) Oth(50,7h) Oth(93,3h) Oth(16,12h)
Total = 3921 Hrs 264 416 1212 269 845 495 420
Introduction to Reliability 15
Managing Reliability
Reliability Engineering
A systems approach to planning for, designing in,
verifying, and tracking the reliability of products
throughout their life to achieve reliability goals.
Bathtub Curve
Failure Rate

Early Life Useful Life Wearout

Introduction to Reliability 16
In Unison

Drain the bathtub.

Introduction to Reliability 17
Reliability Roles

Introduction to Reliability 18
Management Role
Management must visibly and vocally support Reliability efforts
Incorporate reliability requirements into business system gates
Incorporate reliability goals into personnel development and
evaluations
Reliability Tools
Quality Function Deployment
Life Cycle Cost
Corrective and Preventive Action
Awareness of Reliability Prediction, Maintainability Analysis,
FMEA, DOE, Reliability Testing, Field Data Collection and
Analysis
Note that I recommend that management is at least aware of
and conversant in all that is needed since reliability is a way of
doing business

Introduction to Reliability 19
Sales & Marketing Role
Sales & Marketing gathers and interprets the Voice of the
Customer
Reliability Tools
Quality Function Deployment
Field Data Collection and Analysis
Life Cycle Cost
Corrective and Preventive Action
Awareness of Reliability Prediction, FMEA, Reliability Testing
Coordinated effort with Engineering - Realism vs. Wish List
Coordinated effort with Service - Targeted Responsiveness vs.
Fire Drills
Use Reliability efforts to your advantage
Be careful of overselling you must do what you say you do

Introduction to Reliability 20
Engineering Role
Engineering designs in reliability for the product life cycle
Reliability Tools (all of them)
Quality Function Deployment
Reliability Prediction
Maintainability Analysis
Failure Mode and Effects Analysis
Design of Experiments (Product Development/Optimization)
Reliability Testing
Field Data Collection and Analysis
Life Cycle Cost
Corrective and Preventive Action
Using the tools to focus efforts on the critical items
Standardize on what is proven to work
Life Cycle viewpoint in an environment of cost and schedule
pressures
Introduction to Reliability 21
Purchasing Role
Purchasing helps make sure supplied items are reliable and
suppliers are partners in this journey
Supplier Designs Suppliers have full life cycle responsibility
Commodities Your responsibility to ensure proper application
Standardize on what is proven to work
Reliability Tools
Life Cycle Cost
Corrective and Preventive Action
Awareness of Reliability Prediction, Maintainability Analysis,
FMEA, DOE, Reliability Testing, Field Data Collection and
Analysis
Include Reliability requirements in procurement process
(supplier selection, requirements, data, testing)
Lead suppliers by example

Introduction to Reliability 22
Manufacturing Role
Manufacturing preserves the designed in reliability and can be a
source of improvement
Well organized work flow with a 5S shop and trained personnel
using clear procedures eliminates errors that can become failures
Coordinate with engineering to simplify manufacture and
standardize content to improve reliability and maintainability
Overall Equipment Effectiveness is plant floor reliability
Reliability Tools
Maintainability Analysis
Failure Mode and Effects Analysis
Design of Experiments (Process Optimization)
Reliability Testing
Corrective and Preventive Action
Awareness of Life Cycle Cost

Introduction to Reliability 23
Customer Service Role
Service helps understand the product life cycle
Entire life cycle
Usage environment
Reliability Tools
Maintainability Analysis
Field Data Collection and Analysis
Life Cycle Cost
Corrective and Preventive Action
Awareness of QFD, Reliability Prediction, FMEA
Feeding back needed information to the rest of the
organization
Full knowledge beyond Out-of-the-Box and Warranty
expected usage life is often much longer than these!
Introduction to Reliability 24
What If Folks Dont Play Their Roles?

Introduction to Reliability 25
Reliability Tools

Introduction to Reliability 26
Basic Reliability Terms
Reliability - The probability that an item can perform continuously,
without failure, for a specified interval of time when operating under
stated conditions.

Failure - A failure is an event when an item is not available to perform its


function at specified conditions when scheduled or is not capable of
performing functions to specification.

Failure Rate - The number of failures per unit of gross operating period in
terms of time, events, cycles.

MTBF - Mean Time Between Failures - The average time between failure
occurrences. The number of items and their operating time divided by
the total number of failures. For Repairable Items

MTTF - Mean Time To Failure - The average time to failure occurrence.


The number of items and their operating time divided by the total number
of failures. For Non-repairable Items
Introduction to Reliability 27
Basic Reliability Terms
Maintainability - A characteristic of design, installation and operation,
usually expressed as the probability that an item can be retained in, or
restored to, specified operable condition within a specified interval of
time when maintenance is performed in accordance with prescribed
procedures.

MTTR - Mean Time To Repair - The average time to restore the item to
specified conditions.

Maintenance Load - The repair time per operating time for an item.

Introduction to Reliability 28
Basic Reliability Terms
Overall Equipment Effectiveness - A measure of a production systems
ability to meet requirements for availability, efficiency, and yield. This
represents the systems ability to operate, at specified production rate,
to specified quality standards, when needed.

Availability - A measure of the time that a system is actually operating


versus the time that the system was planned to operate.

Efficiency - A measure of the actual production rate that a system


produces product versus the specified production rate of the system.

Yield - A measure of the portion of product that meets defined product


quality specifications versus the total amount of product produced.

Introduction to Reliability 29
Reliability Plan

Introduction to Reliability 30
Planning A Solid Start
Planning Is Critical
If you fail to plan, plan to fail
Integral to Product Development Process
Product Development Process is the roadmap for projects
We do not want Reliability to stand alone or apart from the
process
Reliability Planning is Flexible Too
Certain Must Haves
Options based on the nature of the project
Planning is the responsibility of the Project Manager
Project Manager is the leader
Some elements can be delegated

Introduction to Reliability 31
Basic Elements of a Reliability Plan
General Information
Whos and Whats
Environmental and Usage Factors
These factors must be known in order to properly design
Reliability Performance Targets
Select targets based on specific customer or industry requirements
Select targets based on meeting project-specific requirements
Reliability Tasks
Some tasks are driven by the projects reliability performance
expectation
Other tasks may be performed based on project-specific
requirements
Due Dates and Completion Dates keep the project and tasks on
track
Resource Needs - identify who does what
Introduction to Reliability 32
Reliability Analysis

Introduction to Reliability 33
Similarity Analysis
Compare the Proposed Design to Previous / Similar Designs
Test Data
Customer Complaints
Warranty
Anything Else
Consider any Differences with the New Design
Application, Environment, Customer Requirements, Industry
Requirements, Materials, Software, Firmware, Supplier, Etc
Are Previous / Similar Designs Adequate?
Document your findings
Are Previous / Similar Designs Not Adequate?
Document your findings
Determine actions necessary to address the inadequacies

Introduction to Reliability 34
Design Analysis

Design Analysis is performed to ensure that the


stress applied to a part is below its specified
rating

Design Analysis is used to


Design parts properly
Make proper part selection
Screen out the use of marginal parts
Provide for design uncertainties
Reduce the effects of part variation, parameter drift and
transient stresses

Introduction to Reliability 35
Design Analysis -
Stress-Strength Probability Analysis
It is more useful to understand the variability of
stresses and strengths to prevent overlap of the
stress distribution onto the strength distribution in
order to improve the reliability of a design

Little Chance of Failure

Greater Chance of Failure

Introduction to Reliability 36
Reliability Prediction
Predict product reliability based
on the content of the design and
its stresses

Several Reliability Prediction Models


Telcordia/Bellcore SR-332 (Electrical for Telecommunications)
MIL-HDBK-217F (Electrical for Military, some Automotive)
NSWC-98/LE1 (Mechanical)

Introduction to Reliability 37
Reliability Prediction Example

Using Telcordia/Bellcore SR-332 prediction techniques

Part Qty Base Qual Env Temp Elec Total


Failure Factor Factor Factor Stress Device
Rate Factor Failure
Rate

Per 109 Per 109


hours hours
IC, Bipolar 17 26 1.0 1.0 1.0 442
IC, NMOS 14 58 1.0 1.0 1.0 812
Transistor 5 6 1.0 1.0 1.0 1.0 30
Capacitor 5 2 2.5 1.0 1.0 1.0 25
LED 1 4 3.0 1.0 1.0 12

Total Design 1321

Introduction to Reliability 38
Reliability Modeling / Redundancy
Series

Item 1 Item 2 Item 3 Item n

Active
Parallel Item 1
Redundancy can
Item 2 get you more
reliability but
Standby usually at a cost,
Parallel Item 1 size, or weight
penalty
Item 2
Introduction to Reliability 39
Maintainability Analysis
Maintainability Analysis enables you to design for maintenance
so that crisis maintenance is handled quickly and
scheduled/preventive maintenance is performed with ease and
economy
Maintainability Assessment Matrix
Accessibility, Diagnosis, Skill Level, Tools, Alignment
Fault Detection and Isolation
Troubleshooting Charts
On-Board Diagnostics
Maintainability & Design for Manufacture
DFM is very supportive of Maintainability needs
Total Productive Maintenance
Improving Overall Equipment Effectiveness
Applies to your operations and your product in the customers
hands

Introduction to Reliability 40
Maintainability Assessment Matrix
RATING ACCESSIBILITY DIAGNOSIS SKILL LEVEL TOOLS ALLIGNMENT
REQUIRED

Clear View and Highly Detectable No Training No Tools Self


1 Accessible (indicates
problem)
Clear View but Reasonably General Skill Basic Mechanics Single Point No
3 Inaccessible Detectable Level Tools Tools Required

Unclear View and Moderately Skilled Trades Trade Specific Single Point With
5 Inaccessible Detectable Tools Tools
(special tools) (fault light) (micrometer,
multimeter, etc.)
Unclear View and Difficult to Detect Special Training Specialty Tools Multiple Points
7 Inaccessible (shows up in (tool room) With Tools
(awkward body product/parts)
motions)
Unclear View and Not Detectable Unique OEM Patented Multiple Points
9 Inaccessible Technology Tools and/or by Making Parts
(additional people Training Sophisticated Test
and/or equipment Equipment
required)
Introduction to Reliability 41
Reliability & Maintainability Analysis Example

Probability Plot
Lognormal base e Distribution - ML Estimates - 95.0% CI

99

95
90

80
70
60
50

Perc ent
40
30
20

10
5

0.1

100 300
Time to
Failure

System

Subsys 1 Subsys 2 Subsys 3

Comp 1 Comp 1 Comp 1

Comp 2 Comp 2

Comp 3

Introduction to Reliability 42
Failure Mode and Effects Analysis

Introduction to Reliability 43
Failure Mode and Effects Analysis

FMEA is a team approach to identifying and addressing


potential failure modes and their effects on product or
process performance before they occur

Used to
Identify and address failure
modes or potential failure
modes early on
Initiate and track Actions
Provide a Living Document
for the current project and as
lessons learned for future projects

Introduction to Reliability 44
FMEA Flow

What are What are How What Does something


the Functions, the bad is need to be changed?
Item, or Effect(s)? is it? the - Design
Process? Risk? - Process
- Control
- Procedure
What are How
What can
the often
go wrong?
Cause(s)? does it
Did the
happen?
action taken
lower the
risk?

How is it How good


Prevented is this at
or preventing
Detected? or
detecting?

Introduction to Reliability 45
Combined Approach to FMEA

Combined Approach
Combining Design and Process elements on one
form helps to eliminate things being overlooked or
not communicated
Product Development teams are an excellent vehicle
for accomplishing combined approach FMEA

Other Methods
Interfaces and Interactions
Boundary Diagrams

Introduction to Reliability 46
Reliability Testing

Introduction to Reliability 47
Reliability Testing
Reliability Testing is used to find failure modes,
demonstrate reliability, and screen out defects.
Finding failure modes can be accelerated and performed on a
limited number of units ahead of production go ahead or product
release
Reliability demonstration often requires multiple units and
regimented procedures. Often done on commodity type items
where it is more affordable.
Screening is often done on items that have a burn-in period
May be possible to bootstrap off of existing testing
It is better to find potential reliability problems early
than to prove unreliability late in the process
Never dismiss a failure without proper investigation

Introduction to Reliability 48
Types of Reliability Tests
What is appropriate for your project?
Qualification Test
Stress Test
Life Test
Demonstration Test
Run-In / Burn-In Test
there are more

Introduction to Reliability 49
Qualification Test
All products shall successfully pass product
qualification tests as defined by the product
specification.
Qualification test should include:
Operating Stresses include operating load and environmental
extremes and rates of change.
Storage Environments include storage extremes and rates of
change.
Shipping Environments include shipping extremes and rates of
change.
Assess pre and post test performance, looking for outright
Failures and Performance Degradation

Introduction to Reliability 50
Step Stress Test (aka HALT)
PURPOSE
Step stress testing is intended to identify weaknesses in product design
to improve product performance and identify overdesign to reduce
product cost. In some cases, product reliability may be estimated from
step stress test results.
SCOPE
Step stress testing should be performed on new or significantly changed
products as early in the product design phase as possible with
functionally representative test units in order to identify needed design
changes as early as possible.
Step stress testing typically includes temperature step stress, rapid
temperature change, and vibration step stress.
Step stress testing might also include other stresses as appropriate for
the product being developed.
Step stress testing is intended to be a test to failure test in order to learn
as much as possible about the product.

Introduction to Reliability 51
Step Stress Test Example High Temperature
Destruct Limit

Step Up 10 C

Operational Limit

Step Up 10 C

Start at 20 C

Test Preparation

Introduction to Reliability 52
Accelerated Life Test (aka AGREE Test)
PURPOSE
Accelerated life test is intended to accelerate the accumulation of
life stresses on a product to simulate usage life in a rapid manner to
verify product usage life or identify weaknesses in the product
design. Product reliability may be estimated from accelerated life
test results.
SCOPE
Accelerated life test should be performed on new or significantly
changed products as early in the product implementation phase as
possible with production representative test units in order to identify
product life issues as early as possible.
Accelerated life test typically includes the simultaneous application
of temperature stress, humidity stress, and vibration stress.
Accelerated life test might also include other stresses as appropriate
for the product.
Introduction to Reliability 53
Accelerated Life Test
Test Preparation

1st Interval

1st Test Interruption


for Temperature
Cycling and Other
Stresses

10th Interval

Final Temperature
Cycling and Other
Stresses

Introduction to Reliability 54
Combined Acceleration Factor

Introduction to Reliability 55
Reliability Demonstration Test
Reliability Demonstration Test involves
demonstrating a certain level of reliability
performance with a certain level of confidence to a
specified test condition.
Testing may be failure-free or may involve failures.

Introduction to Reliability 56
Reliability Demonstration
MTTF or Failure Rate
MTTF and Failure Rate Demonstration

Failure Free MTTF Failure Rate


Time per Unit 100 Enter Point Estimate 5000 0.000200000
Number of Units 50 Enter Confidence Intervals
Confidence Level Desired 0.90 Enter One-Sided Lower 2171 0.000460517
Two-Sided Lower 1669 0.000599146
Two-Sided Upper 97479 0.000010259

MTTF Desired to be Demonstrated 2000 Enter Required Time per Unit 92


Number of Units 50 Enter
Confidence Level Desired 0.90 Enter

MTTF Desired to be Demonstrated 2000 Enter Required Number of Units 46


Time per Unit 100 Enter
Confidence Level Desired 0.90 Enter

Failures Occur MTTF Failure Rate


Total Time on All Units 5000 Enter Point Estimate 1250 0.000800000
Total Number of Failures 4 Enter Confidence Intervals
Confidence Level Desired 0.90 Enter Stop after Predetermined # of Failures
One-Sided Lower 748 0.001336156
Two-Sided Lower 645 0.001550731
Two-Sided Upper 3659 0.000273263
Stop after a Predetermined Time
One-Sided Lower 626 0.001598717
Two-Sided Lower 546 0.001830703
Two-Sided Upper 3659 0.000273263

Introduction to Reliability 57
Overall Equipment Effectiveness
Overall Equipment Effectiveness is a measurement of a
production systems ability to meet requirements for
availability, throughput, and quality. It is a percentage
calculation that represents the portion of the time that
the system is operating, at specified production rate, to
specified quality standards versus the time that the
system was planned to operate.

OEE = Availability x Efficiency x Yield

Introduction to Reliability 58
Overall Equipment Effectiveness

OEE = Availability x Efficiency x Yield How is the


Production
System
performing?

Availability = Uptime / (Uptime + Downtime) Is it running?

Efficiency = Design Cycle Time / Actual Cycle Time At design


rate?

Yield = Good Parts / Total Parts Are the parts


good?
Introduction to Reliability 59
What Would You Try To Improve?
System
OEE Availability Efficiency Yield
Effectiveness

85% = 90% 95% 98%

70% = 75% 95% 98%

66% = 90% 75% 98%

64% = 90% 95% 75%

Introduction to Reliability 60
Field Data Collection and Analysis

Introduction to Reliability 61
Data Collection
Minimum Data Needs for each item
Design Configuration
When Produced
How Many Produced
Total Population
Or Sample Population being studied
When Entered Service
When Failed
How Many Failed
Additional Data Needed to better identify Failure Modes and
Corrective/Preventive Action
Usage Application and Environment
How Failed Failure Mode
Immediate Action Taken to Repair or Replace
Time to Repair or Replace
Root Cause of Failure

Introduction to Reliability 62
Usage Time and Calendar Time Analysis

Usage Time Pattern?


Calendar Time Pattern?

Total Quantity Failed or Recalled During Period


Ship Period Ship Qty Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03
Jan-03 500 75 20 10 5 10 30 25 10 15 30 55
Feb-03 1000 125 25 10 10 25 30 5 30 55
Mar-03 1500 75 20 25 50 45 5 15
Apr-03 2000 70 15 30 45 30 10 5 5
May-03 2000 75 25 55 35 5 10
Jun-03 2000 65 45 50 5 5
Jul-03 2000 55 45 5 5
Aug-03 2000 40 10 5 10 5
Sep-03 1500 25 5 5
Oct-03 1500 10 5 5
Nov-03 1000 10 5
Dec-03 1000 5

Introduction to Reliability 63
Usage Time Analysis
Failure Rate versus Accumulated Usage (Repairs Included)
0.1600

0.1400
Failure Rate (Failures/Population)

0.1200

0.1000

0.0800

0.0600

0.0400

0.0200

0.0000
1 2 3 4 5 6 7 8 9 10 11 12
Usage Period

Introduction to Reliability 64
Calendar Time Analysis
Failure Rate versus Calendar Period
0.1600

0.1400

0.1200
Failure Rate (Failures/Population)

0.1000

0.0800

0.0600

0.0400

0.0200

0.0000
Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03
Calendar Period

Introduction to Reliability 65
Distribution Analysis
Distribution Analysis involves identifying the
statistical distribution that the field data follows and
estimates of reliability and confidence intervals
based on the identified distribution

The most basic types of Distribution Analysis involve having a


complete set of data for the population or sample population and
knowing all failure times (uncensored) or failure times and times
at which the field study was ended (censored).

Minitab or other specialized software can be used to perform this


analysis.

Introduction to Reliability 66
Survival Plot
Parametric Survival Plot for Failure Time
3-Parameter Weibull - 95% CI
Complete Data - LSXY Estimates
Table of Statistics
100 Shape 2.14176
Scale 21905.9
90%
Thres 3111.82
80 Mean 22512.0
StDev 9535.60
Median 21572.2
I QR 13270.9
60
Percent

Failure 12
Censor 0
AD* 1.102
Correlation 0.996
40

20

0 10000 20000 30000 40000 50000


Failure Time

Introduction to Reliability 67
Life Cycle Cost Analysis

Introduction to Reliability 68
Life Cycle Cost

Life Cycle Cost looks at the complete picture of all of the costs
involved with a product to identify the most cost effective
solution for a specific application
Marketing Viewpoint: Introduction-Growth-Maturity-Decline
Operations Viewpoint: Research-Design-Develop-Produce-Sell-
Ship-Warranty
Customer Viewpoint: Purchase-Operate-Maintain-Dispose
It is difficult to break the fixation on the Price Tag
Lower LCC often requires a higher initial investment
LCC encourages design decisions based on the life of the
product
LCC encourages customers to service and maintain the
product
Manage the product life cycle to maximize profits

Introduction to Reliability 69
Up Front Efforts Drive Life Cycle Cost

it ted
omm 100%
st C 95%
C o
yc le
C 90%
Life

50%
Cost

50%
Life Cycle Cost Expended
30%
15%
5%
Concept Design Produce Operate
Time

Introduction to Reliability 70
LCC Example

Introduction to Reliability 71
Corrective and Preventive Action

Introduction to Reliability 72
Corrective and Preventive Action
What if things do fail?
Corrective and Preventive Action is a systematic and
documented approach to solve problems and feed the
information back into the system for continuous improvement
Use techniques that close the loop
8-Discipline: Problem-Containment Action-Team-Root Cause-
Verify Corrective Action-Implement Corrective Action-Prevent
Recurrence-Congratulate Team
Six Sigma: Define-Measure-Analyze-Improve-Control
Screening to determine which items get worked, which items get
stored, and the priority need to be established otherwise the
organization can get swamped
Everyone can and should be involved you, customers, and
suppliers

Introduction to Reliability 73
Corrective and Preventive Action System

Everyone

N
Problem Screening Storage
Report

Y
Y

Corrective &
Preventive Feed Back
Action Lessons Learned

Introduction to Reliability 74
Total Productive Manufacturing / Predictive
Maintenance / Reliability Centered Maintenance

Introduction to Reliability 75
Evolution of PM
Preventive Maintenance
Actions taken to prevent failures from arising, like oil changes
Predictive Maintenance
Monitoring techniques such as Vibration, Thermal, Infrared
Photography, or Electrical Load to identify the precursors to failure
Planned Maintenance
Term to avoid implied legal guarantees of failure free operation if PM
is adhered to
Productive Maintenance
Term to relate improved productivity to applying good maintenance
techniques
Productive Manufacturing
Term to relate improved business operations performance to
applying good maintenance techniques.
Percussive Maintenance
When all else fails, whack it with a hammer!
Introduction to Reliability 76
What is TPM?
My Opinion
I prefer the term Total Productive Maintenance because it
acknowledges the link between maintenance and productivity.
I use the term Maintenance broadly to cover whatever tools
or techniques an organization uses to keep their production
systems in good shape and running at peak performance.

Overall Equipment Effectiveness is the goal you


need to reach

If it helps, use it and do it. - Burrows

Introduction to Reliability 77
Nakajima (Father of TPM)
TPM Is Profitable
With zero breakdowns and zero defects, how much more profitable would you be?
Challenge Limits
Do not stagnate at Breakdown Maintenance by the maintenance department
move forward to Preventive, Productive, and eventually TPM focusing the broader
organization on maximizing equipment effectiveness and attaining economic life
cycle cost
Maximizing Equipment Effectiveness
Measure it, with accurate data, to understand
Overall Equipment Effectiveness = Availability X Efficiency X Yield
Successful Implementation:
Eliminate the six big losses
Autonomous Maintenance Program
Scheduled Maintenance Program for the Maintenance Department
Increased Skills of Operations and Maintenance Personnel
Initial Equipment Management Program

Introduction to Reliability 78
Nakajima continued
Organizing For Implementation
Must be Led and Championed by Top Management
Preparation
Announce > Educate > Create Teams and Organizations > Create Policies and
Goals > Formulate Master Plan
Implementation And Stabilization
Preliminary Implementation
TPM Kickoff > Targeted Area
TPM Implementation
Improve Effectiveness of Each Piece of Equipment > Develop Autonomous
Maintenance for Workers (5 S) > Develop Scheduled Maintenance for
Maintenance Department > Conduct Training to Improve Operation and
Maintenance Skills > Develop Early Equipment Plan
Stabilization
Implement TPM Fully and Set Higher Goals
Small Group Activities
Empowered and Autonomous Teams whose Goals Coincide with Company Goals

Introduction to Reliability 79
OEE vs. 7 Big Losses

Overall
Equipment = Availability x Efficiency x Yield
Effectiveness

Breakdowns Reduced Quality


Speed Defects

Setup and Idling/Minor Start-Up


Adjustment Stoppage Losses

Tooling
Losses

Introduction to Reliability 80
Machine Signature / Predictive Analysis

Machine signature
analysis, predictive
maintenance, and
condition monitoring are
all terms used to describe the application of techniques to
detect the signs of problems on equipment before they
become failures.
And detecting the signs of problems and addressing
concerns before they become failures can save you time
and money.
Some of the techniques involved include
Introduction to Reliability 81
Machine Signature / Predictive Analysis
Thermal Analysis - This is typically thermography pictures to identify hot spots in control
panels, electrical boxes, electrical connections, and motors before you notice a
problem. This is especially useful for finding hot spots that are causing strange or
intermittent operation that can be very frustrating to trace.
Vibration Analysis - This is done on moving elements to identify damage, degradation, and
misalignment that reveal themselves in unusual vibration frequencies and energies.
This is very useful in identifying the signals of problems before they become hard
failures.
Noise Analysis - This is typically ultrasonic noise detection. Air leaks, bearing whine,
pump cavitation, and even electrical arcing give off ultrasonic noise that the human ear
can't detect.
Tribology/Oil Analysis - This detects the condition of and contaminants in lubrication and
fluid power (hydraulics) and, depending on what is found, points towards problems that
can become failures.
Electrical Load Analysis - This detects instabilities in electrical load or supply that can
point to problems that can become failures.
Electro Magnetic Interference - This detects EMI fields and interference that can affect
equipment operation.

Introduction to Reliability 82
A Possible TPM Roadmap
The Way I See It
Measure and Monitor System Effectiveness
Automated Data Collection, Paper Logs/ Spreadsheets, Field Studies
Define Measure Analyze Improve - Control
Data-Driven Improvement Efforts
Knock Down High Drivers for Maximum Effort/Benefit Leverage
Autonomous Maintenance by Operators
Treat it like you paid for it and own it / 5 S
Planned & Predictive Maintenance by Maintenance Experts
Learn and acquire more predictive techniques
Equipment Acquisition Requirements with Teeth
Overall Equipment Effectiveness
Life Cycle Cost
Supplier Support
If management really commits to allowing this and workers commit
to really doing their best, the barriers go away but it will take time

Introduction to Reliability 83
Some call it Reliability Centered Maintenance
The Way I See It

Fundamental Design for Reliability and Maintainability of


production systems
plus
Total Productive Maintenance
equals
Reliability Centered Maintenance
Since you are intentionally driving reliability and
maintainability into the design, using what you learn to drive
best practices on the shop floor, and measuring, monitoring,
and refining what you are doing for continuous improvement.

Introduction to Reliability 84
What If Folks Dont Use The Tools?

Introduction to Reliability 85
Some Other Useful Tools

Introduction to Reliability 86
Quality Function Deployment
Quality Function Deployment helps to ensure that
the Voice of the Customer drives product
development
Up front activity
Team approach to determine the Whats and Hows
House of Quality approach allows you to add rooms to show
relationships, correlations, how much, and competitive
assessments
Weighted matrix scoring focuses scarce resources on the most
important issues
Also used for Competitive Analysis
Also used for internal customers (process redesign)

Introduction to Reliability 87
QFD - House of Quality Example

Importance To Customer
Recommend using a
1 to 10 scale to provide
better separation of values
Relationship Matrix
Strong Relationship =9
Moderate Relationship = 3
Weak Relationship =1

Correlation Matrix
Strong Positive Correlation
Positive Correlation
Negative Correlation
Strong Negative Correlation

Introduction to Reliability 88
4 Phase Approach to QFD

Technical
Requirements
Part
Characteristics
Requirements

Process
Characteristics
Customer

Requirements

Process Control
Technical

Methods

Characteristics
Phase 1

Characteristics
Product Phase 2

Part
Planning Product

Process
Design Phase 3
Process
Planning Phase 4
Process
Control
Planning
Introduction to Reliability 89
Design of Experiments
Design of Experiments is a very powerful tool for
determining which factors drive desired responses
Show interactions between factors and higher order effects
Optimize performance and cost
More efficient than varying one factor at a time
Design
Can it be done?
Optimize performance
Production
Optimize yield and cost
Can be used for Data Mining

Introduction to Reliability 90
One Factor At A Time Testing Doesnt Work

One Factor At A Time


100

One Factor At
90 A Time Might
Never Find
This Optimum
80

100

70 90

80
60
70 One Factor At A Time

50

40
40 50 60 70 80 90 100

DesignOfExperiments 91
DOE Example

Introduction to Reliability 92
What If Folks Do Reliability Right?

Introduction to Reliability 93
One Last Time In Unison

Drain the bathtub.

Introduction to Reliability 94
Wrap-Up

Questions / Comments

Thanks

Introduction to Reliability 95

You might also like