LITERATURE STUDY PRECAST CONCRETE TECHNOLOGY
PRECAST COLUMNS TRANSPORTATION
Can either be done in CIS or precast, provided with corbel for simple beam
column connections Precast elements should be
PRECAST STAIRCASE loaded and delivered with
They can either be a single precast unit containing all flights and landings or proper supports ,frames ,
separate precast flights & landings cushioning and tie downs to
Weld Plates prevent in transit damage.
Attachment of precast members is by use of steel weld plates, the Adequate packing or protection
members have embedded plates that can be used as welding surfaces for to the edges of elements should
loose connecting plates or angles also be provided
Rebar and Grout
Reinforcing bars are spliced into slabs and grouted in place STACKING OF PRECAST MEMBERS
The storage support position
for beams and planks should
be within 300 mm from the
lifting points. Do not use more
than two support points in
particular for prestressed
The support spacers should
CONNECTIONS OF PRECAST CONCRETE ELEMENTS not be misangled Wall panels
S.UMAIRA PARVEEN M.ARCH CPM 2ND SEM 1ST YR DR.M.G.R.EDUCATIONAL AND RESEARCH INSTITUTE
CASE STUDY DREAM ACRES ,BANGALORE PRECAST CONCRETE TECHNOLOGY
DREAM ACRES ,BANGLORE Building Data
Type: Township Area: 81 acres Column size (Base to 3rd) 300 mm × 675 mm
Column size (4th to 9th) 230 mm × 675 mm
No. of units: 6500
Column size (10th to 13th) 230 mm × 600 mm
1 BHK - 59 Sq. mts to 61 Sq. mts
Column size (14th to 18th) 230 mm × 525 mm
2 BHK Regular - 69.28 Sq.mt- 94. Sq. mts
Beam size = 230 mm × 450 mm
2 BHK Large - 87 Sq. mts - 112.Sq. mts
Thickness of slab = 115 mm
PROMINENT LOCATIONS Hollow core slabs - 150, 200, and 265 mm.
Sarjapur Marathahalli ORR 4.0 km Stair case slab thickness = 150
IT PARKS Embassy Tech Square 4 .4 km Parapet wall 1 m Height = 230 mm
MALLS Forum Value Mall 4.9 km Live load = 2 kN/m2 Floor Finish = 1 kN/m2
DREAM ACRES Yield strength of steel = 415 MPa
Density of concrete = 25kN/m3 5% Damping
Start year 2015
Hybrid design with precast & CIS together
End year 2016
Precast construction of beams, balcony, staircase, wall panels & hollow
Contractor SOBHA LTD- PRECAST DIVISION
core slabs .
Consultant VAN BOXSEL ENGINEERING, GURGAON
This hybrid design facilitated the overall faster
Overall built-up Area (Precast+CIS) 10 Million Sq. ft. erection and allowed for timely production &
Built-up area planned in Precast 3.79 million Sq. ft. delivery of other precast members.
Built-up area of A series (A1-A7) 8.82 lacks Sq. ft. The connection were simple and special dowel
Total apartments 1500 apartments; 12 Structural bars, corbels and provisions for connection were
system (Sub-structure) Raft foundation (CIS) planned in advance for the members as per the
Structural system (Super-structure) Hybrid Precast Const. Basement, design. M40 grade of concrete was used for all
Ground & terrace work Cast In Situ 1st to 18th flr the tilt elements and M60 was used for the
Total precast concrete volume (m3) ~ 16000 production of hollow core slabs.
S.UMAIRA PARVEEN M.ARCH CPM 2ND SEM 1ST YR DR.M.G.R.EDUCATIONAL AND RESEARCH INSTITUTE