PROGRESS

OVERVIEW

EMISSION REDUCTION IN CITIES (ERiC) PROGRAMME SOLID WASTE


MANAGEMENT IN JAMBI - INDONESIA
DATA PROYEK
INFORMASI UMUM
Nama Proyek Emission Reduction in Cities (ERiC) Programme Solid Waste Management
Lokasi Jambi
Pemberi Pekerjaan Direktorat Kementerian Pekerjaan Umum dan Perumahan Rakyat
Perencana Fichtner GmbH & Co KG Germany
Kombinasi Unit Price dan Lump-sum
Tipe Kontrak
FIDIC Pink Book (Part 1) dan Yellow Book (Part 2)
Nilai Kontrak Jambi : € 14,281,046.86 min PPN
Sumber Dana Pinjaman (Loan) Pemerintah Federal German
Part 1: Landfill, Leachate Treatment Plant (Step 1&3), Fasilitas Pendukung
Uraian Singkat Pekerjaan
Part 2: Sorting Plant, Composting Plant, Leachte Treatment Plant (Step 2)
Waktu Pelaksanaan 688 Hari Kalender (23 Bulan) s/d 30 Juni 2020
Waktu Pemeliharaan 730 Hari Kalender (24 Bulan)
Uang Muka 12.75% dari Nilai Kontrak
Part 1: Monthly Progress Payment. Min 1% NK setelah potongan
Sistem Pembayaran
Part 2: Progress Termin sesuai Schedule of Payment (Pengajuan)
Denda Keterlambatan 1 ⁰/ₒₒ dari biaya pekerjaan per hari keterlambatan. Maksimal 10%
SOLID WASTE MANAGEMENT PROCESS

Truk Area Entrance:


Sampah
Sampah Administrasi
dibuka/potong
Datang Timbang

Pemilahan Jenis
Sampah

Sampah Bernilai Sampah Tidak


Sampah Hijau
Recycle Dapat Digunakan

Composting
Sorting Plant
Plant

Material Kompos Material Recycle


Landfill Gas Collection
Hijau Bernilai

REMARKS
: Input Leachate
: Main Process
: Process Leachate
Clean Outflow
: Output Treatment Plant
LOKASI PROYEK
ERiC Jambi
TPA Talang Gulo, Kenali Asam
Bawah
± 12.0 km from Jambi City
Centre
LINGKUP PEKERJAAN
1 2
New Landfill Cell Leachate Treatment Plant
Layer:
Compacted Clay Liner Anaerobic Pond
Geomembrane Aerated Pond
Geotextile Anoxic Pond
Leachate Collection Layer Setting Pond
Constructed Wetland
LTP Building

Road Road
3 Landfill Storage
Sorting & Composting Area Area New Stream
Area
Reception area for sorting River
Baling station
Reception area for composting
Mobile shredder & screen Reservoir
Composting Entrance
Maturation
Storage
Water & leachate storage tank
Manipulation area Ancillary Works
4
Weighbridge office
Building
Parking
Transformer station
Workshop
Hangar for heavy equipment
Petrol station & Wheel washing
LINGKUP PEKERJAAN
LINGKUP PEKERJAAN
KONDISI EKSISTING
Layout

n dary
Bo u
en ll
New Landfill t we ndfi
be La
d
R oa New
s d
c es an
Ac stin g
i
Ex

Existing Landfill

Existing Landfill

Boundary

Existing New Landfill

Access Road between


Existing and New Landfill
EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

Pump Station for Existing


Pond
- Excavating for the Pump
Station
- HDPE pipe da 90 is already
on site complete on 29 June,
- Work
2020

PUMP STATION 1 Dokumentasi 22 June 2020


VISUALISASI 3D PEKERJAAN
FLOW MANAGEMENT

2
Composting Plant
Truk sampah berisi material hijau /
organik
Kapasitas Input: 15 Ton / Hari
1
Pintu Masuk dan Penimbangan
Jembatan timbang: 2 unit x (12 m x
3.5 m) Kapasitas @40 Ton
Sistem manajemen kendaraan

3
Sorting Plant
Truk sampah berisi material potensi
daur ulang
Kapasitas Input: 35 Ton / Hari
FLOW – SORTING PLANT

2
4
3 1
5

1 3 5
Reception Area Conveyor Belt a Magnet Separator
Penerimaan material dari truk Konveyor pembawa material Pemilah material besi dengan system
sampah yang datang Belt 1200 mm magnet

2 4 6
Bag Opener Stationary Screen Conveyor Belt
Pembuka plastik sampah Pemilah material ukuran </> 80 Konveyor pembawa material tidak
mm dapat digunakan < 80 mm (-> Landfll)
FLOW – SORTING PLANT

2
7 4
3 1
5

6
8
9

7 8 9
Manual Sorting Horizontal Baler Storage Area
Pemilahan material >80 mm Pengepakan material Area penumpukan material daur
melalui konveyor dengan tenaga menjadi bale ulang bentuk bale atau dalam
manusia kontainer
FLOW – COMPOSTING PLANT

3
4 5
7

1 3
Reception Area Tipping Area
Penerimaan material dari truk sampah yang datang Penumpukan material hasil potongan sampah hijau

2 4
Shredder Fermentation
Pemotongan material hijau Proses fermentasi material hijau menjadi kompos
dengan proses aerob menggunakan alat Turner
Proses selama 4-6 minggu
FLOW – COMPOSTING PLANT

3
4 5
7

5 6 7
Maturation Mobile Screen Storage Area
Proses pematangan kompos Pemilahan material dengan Area penumpukan material produk
dengan proses aerob ukuran </> 8 mm kompos
menggunakan alat Turner
Proses selama 6-8 minggu
LAPORAN PROGRESS

MONTHLY REPORT SUMMARY


Package Works : Emission Reduction in Cities (ERiC) Project
Solid Waste Management in Jambi Municipality
Contractor : PT. PP (Persero) Tbk.
Contract Number : 08.08/SP-FISIK/PSPLP-JBI-06/2018
Commencement Date : August 13, 2018
Notice to Proceed : KU.08.09/SPMK/PSPLP-JBI/05/2018
NTP Date : August 13, 2018
Contract Value : € 14,281,046.86 exc VAT

Progress Report
Up to This Remain Works
No Performance Weight ( % ) Up to Last Month This Month
Month Weight ( % )
(%) (%) (%)
1 2 3 4 5 6 7

0 CONTRACTUAL REQUIREMENTS 0,6874 0,6874 0,0000 0,6874 -


1 SITE PREPARATION 1,2746 1,0404 0,0000 1,0404 0,234
2 SITE CLEARING AND GENERAL EARTHWORKS 0,5167 0,4919 0,0000 0,4919 0,025
3 ROAD CONSTRUCTION AND PLATFORMS 13,6176 11,3938 -0,4494 10,9444 2,673
4 LANDFILL CELLS 19,5062 19,5062 0,0000 19,5062 -
5 LEACHATE TREATMENT PLANT 24,1004 18,3648 3,0501 21,4149 2,686
6 LANDFILL GAS COLLECTION AND TREATMENT 1,4970 0,7446 0,0000 0,7446 0,752
7 SURFACE WATER MANAGEMENT 2,3004 2,0522 0,2481 2,3004 -
8 CIVIL WORKS BUILDINGS 5,0533 4,9089 0,0000 4,9089 0,144
9 GENERAL ELECTRICAL INSTALLATIONS, FRESH WATER SUPPLY AND 4,7027 3,9613 0,0000 3,9613 0,741
FIREFIGHTING, SEWAGE NETWORK AND OTHERS
10 GROUNDWATER MONITORING SYSTEM 0,1701 0,1428 0,0000 0,1428 0,027
11 EQUIPMENT 1,5109 0,3423 0,0000 0,3423 1,169
12 DAY WORKS - 0,0000 0,0000 - -
13 YELLOW BOOK 25,0627 6,3857 0,0000 6,3857 18,677

AMOUNT 70,0222 2,8488 72,8710 27,1290


COMULATIVE REALIZED PROGRESS 72,8710
COMULATIVE PLANED PROGRESS 77,8415
DEVIATION (4,9705)
EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

LANDFILL CELL Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

ACCESS ROAD Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

ENTRANCE & FACILITY AREA Dokumentasi 21 Juli 2020


Dokumentasi 7 April 202
EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

ENTRANCE GATE Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

WEIGHTBRIDGE Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

WORKMANSHIP BUILDING Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

ADMINISTRATION BUILDING Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

TRANSFORMER BUILDING Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

HANGAR ALAT BERAT – PETROL STATION - Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

WORKSHOP BUILDING Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

SORTING PLANT Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

COMPOSTING PLANT Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA
Wetland
Storage Pond

Aerobic Pond

Anaerobic Pond

Access Road Section 5

LEACHATE TREATMENT PLANT Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

LEACHATE STORAGE POND Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

AEROBIC POND (STEP 1) Dokumentasi


Dokumentasi 21
21 Juli
Juli 2020
2020
EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

AEROBIC POND (STEP 2) Dokumentasi 21 Juli 2020


EMISSION REDUCTION IN CITIES (ERiC)
PROGRAMME SOLID WASTEMANAGEMENT IN JAMBI
- INDONESIA

CONSTRUCTED WETLAND Dokumentasi 21 Juli 2020


PROGRESS
OVERVIEW

Terima Kasih