Process Improvement Template - ONS
Process Improvement Template - ONS
Process Improvement Template - ONS
Scope
The dongle based licence key will not have to be managed and synced with physical server
Users of EO application will be able to access application without any hault in case of network issue as well.
Process Flow – As Is
Before this project, there was dependency on physical server due to which DR drill could not be done , also to
insert the dongle USB port dependency was prevailing.
WHY 3 Database had to be accessed from different server increasing application response time
WHY 4
HOW 1 – Application response time is reduced to much extent by installing applications and database on single
HOW server .
Error Proofing
What needs to be changed
A new way of managing the licenses on IP based has been introduced .
USB port does not have to be managed, DR drill can be done , do not need different servers
for managing application and database seprately .
Process Flow – New
New physical server has been introduced
Product installed on virtual server registered with the IP based license file
All the other servers running different production environment of EO application will now access the new
virtual server
Sustainability
How will you maintain improvement
The new system has already been implemented and since then all the applications are running good
in terms of license usage . So far, the system has been successfully running.
Control Room No IT infrastructure and A new system has New Process was Control Room 3rd August 2016 Done and No pending issues
information communication been introduced, required Successfully
shared with platforms not namely the Outage being used
consumers suitable to cater to Notification System.
regarding our process
outages.
List of annexures