Haapco Scaffolding Presentation General 2017

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 44

Locations of Company Headquarter and Company Facilities

HEAD OFFICE :
YARD & BRANCH OFFICES :
2nd Floor.Al Qahtani Bulding. •Jubail (Yard)
Dammam/daharan Road
P.O box 66101,Dammam 31576 •Riyadh
Tel: +966 (013)8324550/8340955
Fax :(013)8329551 •Rabigh
www.haapco.com
info@haapco.com •Jeddah
ISO Certification
Current workload

Current Scaffolding Projects

SN PROJECTS Contractor Sub-Contractor Location

1
WA’AD AL SHAMMAL PROJECT ,Package 2 Dragados Gulf Zamil Steel Ras Al Khair
2
WA’AD AL SHAMMAL PROJECT ,Package 2 Dragados Gulf Zamil Cool Care Ras Al Khair
3
WA’AD AL SHAMMAL PROJECT ,Package 2 Dragados Gulf IBSF Ras Al Khair
4 KFIA - SATS Project SATS Absal Paul KFIA

5 Aramco Drilling - Nabors Project Nabors


Nabors Drilling Absal Paul
6
Duba Green Intregrated Solar Power Plant. INITEC-SSEM SAUDI ELECTRCITY COMPANY   Duba
7
WA’AD AL SHAMMAL PROJECT ,Package 2 Ma'aden Dragados Gulf Ras Al Khair
Previous experience

Completed Scaffolding Projects


SN PROJECTS End User Client Location
1 Sadara- Polyethylene LSPB-2 Sadara Larsen & Toubro Jubail
2 Marafiq Sidem Facilities Projects at Sadara Marafiq CCCO Jubail
3 Halbutoyul Project Petro Kemya Technip GS Neotek Jubail
4 Sadaf Tank Project in Jubail Sadaf AGMF Jubail
5 Hawayah Gas plant Maintenance Saudi Aramco TISCO Udaliya
6 Petrorabigh Shutdwon Petrorabigh PCMC Rabigh
7 Petrorabigh Shutdwon Petrorabigh Kanooz Rabigh
8 Petrorabigh Shutdwon CP2 Petrorabigh Arabian Project Rabigh
9 Sipchem Office Facilities Sipchem Absal Paul Dhahran
10 Satorp Expansion Project Satorp Al Ammara International Jubail
11 Sharbati Warehouse Project Sharbati Absal Paul Dammam
12 Aramco Residential Drinking Water Tank Maintenance Saudi Aramco QYD Dhahran
13 Aramco Cooling Tower & Chiller Room Maintenance Saudi Aramco QYD Dhahran
14 WA’AD AL SHAMMAL PROJECT ,Package 2, Tank Dragados Gulf AGMF Ras Al Khair
Erection
Qumaish Yahya Al -Dagheer
15 Rastanura Saudi Aramco Chiller Unit Maintenance Saudi Aramco & Partners Company Rastanura
Experience on Riyadh Metro

Scaffolding Projects at Riyadh (Including Riyadh Metro)


SN PROJECTS End User Client Location
1 Riyadh Metro Project BACS Gulf energy Riyadh
2 Riyad Saudi Aramco Refinery Shutdown Saudi Aramco Kanooz Riyadh
3 Riyad Saudi Aramco Refinery Shutdown Saudi Aramco Anabeeb Riyadh
Experience on Riyadh Metro
HSE Plan

1. D A I L Y O BS E RV A T I O N
2. T O O L BO X M E E T I N G
3. J O B S A F ET Y A N A L Y S IS
Safety Record & Details
Copy of scaffolding procedures
Data Sheets
Training Record
Details of training provided i.e modules

SCAFFOLDING TRAINING MODULES


1 Periodical Training
2 Quarterly Training
3 Half yearly Training
4 Yearly Training

5 Training after vacation

SUBJECT OF TRAINING
1 Awareness of site safety procedure

2 P.P.E and Special PPE, as well as in case of emergency with hazards Identify

3 Work at height, Fall Protection, 100% Tie OFF procedure


4 Introduce of scaffold and component
5 Type of Scaffolding

6 Identify the damage materials and removal from site.

7 Materials handling and lifting procedure.

8 Foundation and dimensions with erection of scaffold

9 Functions of each clam and bracing


10 Selection of Scaffold materials
11 Ladder and position
12 Platform’s and guard rail system’s
13 Tie and out Rigger
14 Procedure of modification and dismantling
15 Materials Segregation’s & demobilizations
16 Mobile scaffolding
17 Tools used for scaffolding

Name of Instructor:
Date:
Signature
Explanation of how training is conducted and where
SL.No Designation Name Qualification Experience
Industrial Scaffolding,
1 Operations Manager Mr. Nikhil M MBA Electrical works

B.E Civil, M.E Industrial Estimation &


2 Technical Manager Mr. Gurusamy Structural, Planning, Mechanical,
Balasubramanian
M.B.A Structural

B.E
QA/QC, Industrial
3 Construction Manager Mr. Mohammed Mechanical , Scaffolding ,Structural
Shafeeque CSWIP LEVEL
Steel
II
Scaffolding TUV,ITI Design, Industrial
4 Mr. Renjith Lal Draftsman
Designer/Inspector Civil Engg. Scaffolding

5 Scaffolding In Charge Mr. Regunathan B.A,TUV Industrial Scaffolding


1. ANALYSING JOB SCHEDULE GIVEN FROM THE CLIENT

2. EVALUATING THE CURRENT MANPOWER AVAILABLE AT SITE

3. EVALUATING CURRENT MATERIAL AVAILABLE AT SITE

4. MOBILIZATION OF EXTRA MATERIAL AND MANPOWER IF NEEDED

5. RISK ASSESMENT AND PERMIT RECEIVING

6. TASK ASSIGNED BY SCAFFOLDING SUPERVISOR TO SCAFFOLDERS IN ORDER TO MEET


THE SCHEDULE OF THE CLIENT.

7. SCAFFOLDING INSPECTOR PERIODIC INSPECTION

8. SCAFFOLDING MODIFICATION IF NECESSARY

9. DAILY PRODUCTION ANALYSIS AND CORRECTIVE ACTIONS IF NEEDED


1. ARRANGING “FTA” FOR EMPLOYEES

2. ALLOCATING STORAGE AREA (20 M X 20 M)FOR THE


SCAFFOLDING MATERIAL WITH PROPER BARRICATION

3. ALLOCATING PROPER SIGN BOARDS

4. MATERIAL MOBILIZATION

5. MATERIAL SEGREGATION
RESOURCES AVAILABLITY (MANPOWER)

SCAFFOLDERS 250 Nos


INSPECTORS 7 Nos
DESIGN ENGINEERS 2 Nos

ADDITIONAL RESOURCES

INDUSTRIAL SUPPORT DIVISION-HAAPCO

RESOURCES AVAILABLITY & PROOF OF ABLITY

SCAFFOLDING AVAILABLE – 50,000 CUBIC MTR

ENOUGH RESOURCES TO PLAN BASED ON SCHEDULE


Other Services offered:

Fabrication
Blasting/Painting
Erection
Civil works
Maintenance
Camp & Catering
Industrial Support
Electrical Works
CCTV and Networking