Bridge Construction Work

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 15

COLLEGE OF TECHNOLOGY AND ENGINEERING

Maharana Pratap University Of Agriculture & Technology

Summer Training At
CONSTRUCTION OF EARTHEN DAM AND A GRAVITY FORCE
IRRIGATION TUNNEL(DEWAS PROJECT 2nd STAGE)
FROM 1/7/2012 TO 30/7/2012
Submitted To- Submitted By-
-> Sh. R. P. Arora -> Avinash Chechani
Training Incharge 4th yr,Civil Engineering
TRAINING SCHEDULE->
From 1/7/2012 to 10/7/2012 At->
EARTHEN DAM
From 11/7/2012 to 30/7/2012 At->

GRAVITY FORCE IRRIGATION TUNNEL

TRAINING UNDER->
COASTAL PROJECTS LIMITED
INTRODUCTION-
 Name of the project :
 CONSTRUCTION OF MAIN DAM AND
APPURTENANT WORKS OF MADRI (EARTHEN)
DAM, OPEN CUT, INTAKE STRUCTURE AND
LINK TUNNEL FROM MADRI DAM TO MAIN
TUNNEL

 Revised Estimated cost of the project : 379.19 crore


Line Diagram For
Swimming Pool
Steps for making Swimming pool->
- Excavation of the area.
- Steel or rebar to be bent and put in place in the excavated hole.

- Fitting the plumbing and electricity Connection.


- Filling the Concrete inside Steel Structure.
- Tile the inside of the swimming pool.
- Filling the pool.
- Excavation of the area. - Steel or rebar to be bent and put in place in
the excavated

Concrete Mixture
- Filling the Concrete inside Steel Structure.
Bridges are structures used by people and vehicles
to make crossing areas easier in travel.

TECHNICAL SPECIFICATION -
 
 Grade of concrete : M 50

 Grade of cement : OPC 53

 Grade of reinforcement : Fe 415


 
RIGID PAVEMENT- R
I
G
I
D
P
A
V
E
PA
V M
E
E
M
E
N
T
Q

N
U
A
LI
TY
C

T
O
N
C
RE
TE
(P
Q
C)
M
-
40

D
R
Y
L
A
N
D
C
O
N
C
R
E
T
E
(
D
L
C)
M
-
15

G
R
A
N
U
L
A
R
S
U
B
G
R
A
D
E

S
U
B
-
G
R
A
D
E

LAYERS IN RIGID PAVEMENT


Foundation
for bridge

Well
Foundation
The crew, using a
loader, excavator,
crane or other
equipment, off loads
the Bridge.

Beams are placed & secured on abutment ->


Doing the
Shuttering
Operation.

Placing the Steel


Bars.
PIER OF MAIN BRIDGE-

PIER
Beam Concrete Mixing

Using Vibrator
 
 
  Shuttering of
viaduct
 

VIADUCT
SPANARRANGEMENT
6sp2a4
nm
ofs414:m
 
 
 
 
 
sp2a7o
4 n
m
fs018:m
 
 
 

  VIADUCT

The viaduct rest


on pile.
THANKS
2
All….!!!