SV - Highway DesignOverview
SV - Highway DesignOverview
SV - Highway DesignOverview
SV -Tunnels
• Salient Features
• Geology assessment
• Design Updates
• Support Class
Key point
Project starts at Chhatro, Kishtwar district and east portal of tunnel is at Singhpora (17.088km from Chhatro). The
unidirectional tunnel of 10331/10363m upto west portal at Gadole and ends at Vailoo. These are summarized as
below:
LHS RHS
Design Chainage
Design Chainage (Km) Length (Km) Length
(m) Remarks (m) Remarks
From To From To
The section 3 (ii) of Schedule –B states that minimum design speed of 40 km per hr. for mountainous/hilly terrain
as per IRC: SP:48-1998 & IRC: SP:73-2018.
Pavement Design: Minimum Design Requirement
Section Code
Design Traffic (min) CBR Design Period
Main CW 20 MSA 10% 20 IRC :37-2018
Details of Bridges and Structures
Span
S.No Type of Structure Design Total Length Arrangement (No. Deck Width Remark
Chainage (Km) (m) x length) in m (m)
Viaduct cum
1 111+315 300 5X50+2X25 12.50 2 Lane bridge
Bridge
Viaduct cum
2 Bridge 112+675 80 2X40 12.50 2 Lane bridge