Electricity Generating Authority of Thailand
Introduction
The mean wind speed is varies from 2.5 m/s Wind speed and direction
10 kW WTG
Electricity
INCENTIVE
Solar 250 MW
Wind 100 MW
Electricity MSW 100 MW
Solar 6 MW RPS Hydro 350 MW
Wind 0.2 MW Biomass 1,040 MW
Biomass 560 MW
2800
2800
2800
2800
47332.6
41852.6
New Installed - Fossil
39647.6
45000
RPS
44392.6
37442.6
2500 Incentive + อื่ นๆ
34577.6
40000
33702.6
Installed Capacity
1
31382.6
28582.6
2000
2100
2100
27045.7
New Installed (MW)
26352.2
26372.4
30000
25363
1373.3
1400
1500 25000
1057
20000
1
1000
15000
673.3
700
10000
462
500
5000
140
140
140
105
105
20.2
70
235
235
2
0 0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Year
Wind
Low Known
Potential
R&D
Small Hydro Goal = Higher Potential or Lower Cost
Unknown
Potential
Geothermal
Tidal Wave
• Mini-hydro 76.70 MW
• Biomass 27.00 MW
• MSW 21.00 MW
• Solar 10.05 MW
• Wind 5.25 MW
Hydro 22.70 48.00 6.00 17.00 11.00 9.00 7.00 5.00 125.70
Biomass 9.00 4.00 14.00 90.00 60.00 60.00 94.00 90.00 421.00
MSW 0.00 18.00 3.00 20.00 18.00 16.00 11.00 9.00 95.00
Wind 2.25 0.00 3.00 6.00 9.00 12.00 16.00 20.00 68.25
Solar 1.05 0.00 9.00 7.00 7.00 8.00 12.00 16.00 60.05
Capacity
35.00 70.00 35.00 140.00 105.00 105.00 140.00 140.00 770