2018 GoMaximo Asset MGMT From MX Perspective
2018 GoMaximo Asset MGMT From MX Perspective
2018 GoMaximo Asset MGMT From MX Perspective
as defined by the
Uptime Elements Framework
Session #1 Session #2
J o h n Re eve , A u t h o r, C R L , C M M S C h a m p i o n
Speaker Background Grand Gulf
Nuclear Station
2nd consultant hired by the company that invented 13,000 LinkedIn followers
Maximo. 100 postings on industry best practices, numerous
Spent the first 10 years as an international consultant trade magazine articles
in project management supporting cost/schedule Frequent speaker at Reliability Web and Maximo
design. Aerospace and defense industries, as well as software venues
nuclear power, depended on this software. Book: Failure Modes to Failure Codes
U.S. Patent in maintenance scheduling – called the Able to comfortably discuss advanced processes for
“order of fire” for resource leveling both asset reliability and work force productivity.
In the following 20 years, specialized in asset Significant overseas assignments include Australian
management design. Defence Industry (Sydney), Australian Submarine
Certified Reliability Leader Corporation (Adelaide), Pohang Steel (South Korea),
100 Guangdong Nuclear Power (China) and Power
Posts Generation Company of Trinidad.
Aided in 1st RCM for Maximo Industry Best Practices
course, taught as PSDI consultant
RELIABILITY LEADERs
Asset Reliability
CMMS PRACTITIONERS
Journey MX S/W CONSULTANTs
COST/SCHED. ANALYSTs
Asset Management is what you extract
from the Asset Management System
Advanced processes provide
the largest potential
MAXIMO return on investment
CMMS
The software may be world class but you still need someone to
state the vision, and then, develop supporting processes.
How to get Certified
Read these or, attend a 1
books week course
Five main
Passport set verticals
What makes up an
Asset Management System?
What value do the How do these
Uptime Elements elements relate
provide? to Maximo?
Reliability Asset
Criticality Strategy Condition Vibration fluid executive operational strategy and corporate strategic asset
analysis development information analysis analysis sponsorship excellence plans responsibility management plan
Reliability Root cause Ultrasound Infrared motor risk asset asset lifecycle
testing Thermal human capital competency management knowledge management
engineering analysis testing
imaging management based learning
Lets start
here.
Reliability LeaderTM, Uptime® ElementsTM, Reliability Framework and Asset Management SystemTM and Reliability LeadershipTM are the trademark(s) or registered trademark(s) of
NetexpressUSA Inc. d/b/a Reliabilityweb.com and its affiliates in the USA and in several other countries.
Reliability is Everyone’s Job -- including Operations
Goal #1: Build a proactive maintenance program which involves failure mode identification by O&M staff; precision
maintenance training for technicians; and RCM training for senior staff. Lastly, get Reliability Engineer involved.
Goal #2: Operations personnel should be used in 10-40% of all PM duties. This would free-up maintenance to
increase PdM activities, and gain a partner in asset reliability.
Operator Driven Reliability has operators performing minor & recurring maintenance tasks. Operators need to
accept ownership of asset reliability. They can (1) identify and report failure modes sooner, and, (2) perform basic
servicing by replacing filters, and performing lubrication. They could also have basic PdM tools with them on rounds.
ODR Basic Tasks – qualifying criteria
1. No more than one basic skill is involved, such as mechanical or electrical; but no special tool requirements
2. Only minor adjustments or lubrication activities
3. Troubleshooting “if then … then this”, e.g. electrical resets or clearing a jam
4. Defect elimination or improvement activities are encouraged
5. No significant disassembly
6. Before starting ODR program, there should be some type of “buy-off” to verify proper operator knowledge.
Senior maintenance staff should conduct walkdown to discuss possible failure modes.
7. Every operator who is assigned an ODR task should have access to the single point lesson (SPL).
Best-in-Class Tips:
Some organizations have Defect Elimination teams who work together to make improvements.
In some organizations, the maintenance staff is offered advance training in Condition Based Technologies.
Some Organizations focus heavily on Cost Management
How do you optimize Reliable companies will have a competitive advantage due to best-
in-class practices. This allows them to maintain a positive margin
costs to improve even in a depressed market place. Maximo Advanced Processes
reliability?
Maximo WBS 1.0
CMMS
OPERATOR DRIVEN RELIABILITY
Select CMMS based on I M P L E M E N T --- U T I L I Z E --- O P T I M I Z E
1. Ability to configure DEFECT ELIMINATION
2. User community size PLAN & SCHEDULE
3. Industry-product ratings RCM ANALYSIS
4. Number of available add-ons DAILY
PLAN PM OPTIMIZATION
Design CMMS to manage by exception BACKLOG
5. Identify failure analytic and M A NAGEMENT RCM SCREEN INSIDE CMMS
other key reports WEEKLY
2. Reverse engineer SCHEDULE
input reqmts. EMER/URGENT – PLANNED CORRECTIVE – PM/PdM - MINOR
CRITICALITY ANALYSIS
RACI SAFETY-HAZARD REVIEW cron ROOT CAUSE ANALYSIS
1.3 ORGANIZATION WORK PRIORITIZATION + CATEGORIZATION CHRONIC FAILURE ANALYSIS
RELIABILITY TEAM
STRATEGIC TACTICAL 1.2 BUSINESS PROCESS
Vision-mission ANALYTICAL REPORT DESIGN
WO Initiation Dept Goals ASSET CONDITION
1.1 F O U N DAT I O N DATA Business Rules
Flow charts WORK ORDER FEEDBACK
CMMS SOPs FAIILURE MODE ON WO
FAILURE ASSET PM LABOR KPIs + metrics MAINT.DOWNTIME CAPTURE
CODES INVENTORY M STO SCHEDULING
JOBPLAN CRAFT CALENDAR auto RO
ITEM replenish PROJECT COST TRACKING
LOCATION rop, eoq, RISK BASED
COMPANIES lead-time, safety PRIORITIZATION MATRIX
Strategic Asset Management Policies
00
50
-5
O
IS
Asset Category; Asset Criteria/Definition
Replacement Cost; Asset Condition Tracking
Expected Service Life; Average Age
Levels of Service
Maintenance Schedules
Cost Tracking; Growth Plan; Capital Projects
Disaster Planning; Risk Management
Asset Management Plan by Category showing SLA
Reliability LeaderTM, Uptime® ElementsTM, Reliability Framework and Asset Management SystemTM and Reliability LeadershipTM are the trademark(s) or registered trademark(s) of
NetexpressUSA Inc. d/b/a Reliabilityweb.com and its affiliates in the USA and in several other countries.
Maximo WBS Design the CMMS
to manage by
exception
ASSET MGMT
1.0 SHAREHOLDERS 1.1 CMMS DATA 1.2 KNOWLEDGE 1.3 END-GAME
TY
S I B AT E
ILI
MISSION-VISION
ON R
PRACTICES
ASSET MANAGEMENT STRATEGY ANALYTICAL
TRANSACTION REPORTS
DATA
ASSET MANAGEMENT PLANS
RISK ACTION
MGMT TRACKING
Continuous
KPIs provide
Improvement
This initiative is certainly valid but if The analytical
MANAGEMENT measures;
reports could very The LRP is a
left up to the day-to-day worker, OF CHANGE analytics provide
well impact the greatly
minimal benefit may occur. Therein insight. Too
several techniques are warranted such data capture under-utilized
tool for often the CMMS
as WO Feedback, asset condition requirements.
consolidating user assumes
capture, chronic failure analysis, RCA, Thus if the CMMS
improvement the product
defect elimination, auditing, SQL error team fails to
checks, benchmarking, RACI chart, initiatives o.o.b. will have
think ahead,
asset owners, story boards, posters, and adding the analytics
capabilities
and of course training. clarity. they need.
will be lost. -- Steven Covey
Create a Culture of
Reliability, Responsibility, and Accountability
Leadership for Reliability states that leadership comes from everyone.
Foundation for Reliability Executive Sponsor should be the champion of asset management – at the
executive level. He sets the AIM where reliability is an imperative. The executive
sponsor communicates goals and helps initiates change, assigns accountability,
and explains benefits. He also reviews expectations, addresses resistance, and
reviews risks/roadblocks. Lastly, he explains why continuous improvement is
critical. Top management is also responsible for creating and resourcing the Long
Range Plan – containing improvement initiatives.
Reliability Leader - defined: Reliability Leaders promote excellence; develop
innovative ideas in support of improve work force productivity and asset
integrity’ plus, they nurture the development of others through demonstration
and engagement. Reliability Team is coordination central for improvement ideas.
Anyone can be a reliability leader – including P&M Technicians. To be a
reliability leader, you must be able to lead and exercise reliability leadership
effectively with no title, no position, and no authority. A reliability leader strives
to create a better future that might not otherwise exist.
Reliability Culture is created through leadership. And optimized performance is
a principal result of this culture.
Reliability LeaderTM, Uptime® ElementsTM, Reliability Framework and Asset Management SystemTM and Reliability LeadershipTM are the trademark(s) or registered trademark(s) of
NetexpressUSA Inc. d/b/a Reliabilityweb.com and its affiliates in the USA and in several other countries.
Maximo WBS Someone at the executive
level should be the
Understand shareholder values
primary sponsor of
Document goals & objectives 1.0 EXECUTIVE SPONSOR asset management
Promote reliability culture strategy
Communicate vision
1.1 1.2
SENIOR MANAGERS AL STEERING TEAM
N
IC
IO
G
T
TE
PROJECT MANAGER A
E R CMMS CORE TEAM RELIABILITY TEAM
RA
P
O
ST
RELIABILITY CHAMPIONS
CMMS BUSINESS P&S RELIABILITY HSE MATLS
ASSET CARE SPECIALISTS ADMIN ANALYST MGR ENGR MGR MGR
Goal: Create a OPS MAINT
Culture of Reliability POWER USERS MGR MGR
1.4 1.3
HR MGR
S
TECHNICIANS
Strategic
IE
Tactical
DIFFERENCE MAKERS
R
MGR
N
Team between
IO
Approach MGR
DRIVEN ELIMINATION SYSTEM shared goals
RELIABILITY TEAMS OWNERS TRAINING MGR
Only 11% of all failures are age related
Condition Based Technologies are scheduled activities, non-intrusive, and provide early warning.
Reliability LeaderTM, Uptime® ElementsTM, Reliability Framework and Asset Management SystemTM and Reliability LeadershipTM are the trademark(s) or registered trademark(s) of
NetexpressUSA Inc. d/b/a Reliabilityweb.com and its affiliates in the USA and in several other countries.
Maximo WBS Goal: The organization must
continually improve
1.Perform investment planning processes, reduce costs,
2.Ensure reliability in design 1.0 IDENTIFY & MANAGE RISKS and cut waste to
3.Manage capital projects remain competitive.
4.Operate & maintain It’s not possible to design out all possible defects therefore the organization
must deploy methods to detect failure, find true cause and mitigate it’s effects. RCA
Trigger
Points
CBT = Condition Based Technologies
NORMAL PLANT OPERATION 1.6
Root
PERFORM PRECISION
1.1 1.5 SIGNIFICANT Cause
O&M TECHNICIAN
CRITICALITY 1.2 RCM 10-15% EVENT
CMMS PM/CBT
Analysis
MAINTENANCE
ANALYSIS ANALYSIS Time-
LIBRARY
70-75% Usage Monthly
1.3 PMO Meeting
ANALYSIS based
Work 1.7
M
G G
CBT
Discovery
ROUTINE + URGENT REPAIR WORK WO COMPLETION UPDATES
Store RCM
Analysis
1.8
results inside WO
CMMS One-off WO failure mode comparison
Feedback
Pareto sort identifies worst offenders and drills down on failure mode to find true cause
Present LRP to Stakeholders
Road
Upper Mgmt Conduct Review LRP Conduct User Surveys CRL Accreditation
Setup/Configure Fields: Activate CMMS Functionality: Perform RCM Cost Avoidance Report
• 5 Annual Maint Costs to Asset • Type-Ahead Analysis
• Functional Failure on WO • Prefix WO with “YY-”
• Out-of-Service on WO
• TypeWork field (with pic list)
• WO Feedback
• Capture Actions Performed
• Setup Capital Tool Tracking
• Meter-based PMs
Perform PMO
Analysis
Store RCM
Analysis
inside
CMMS
Map
Create Power Applications: Perform
Bus. Rule: Criticality Gather OEM Enhance Understanding
• Defect Tracking Recommendations
• RCM Analysis Screen CM Analysis Perform Asset the end-game
• WO Ranking Matrix Worktype Defect Reliability gives an
• HSE Accident/Incident Tracking for Repair Design- Elimination organization
• PM Basic & Commitment Repository Setup Reliability Build significant
Team Failure Chronic competitive
Analytic Failure advantage.
Analysis
Failed Component Capture Capture
Setup