Final Report

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 33

Hotel Jen • By Shangri-la

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 1


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
PROJECT BRIEF -
INTRODUCTION
With the aim to propose a new Business Hotel in Kelana
Jaya where the old commercial centers and
administrative districts occupy. We seek to meet the
demand and introduce facilities for the younger
demograpic in order to draw a new crowd into the
neighborhood.

The Client is a 3-star hotel chain owned by the Shangri-La


group, and their purpose is to connect the world to the
energy and dynamism of Asia’s leading cities. To create a
place that draws one deep into the local immersion,
building global connections and cross-cultural
collaboration.

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 2


SENIBINA, LAM 2022
SUPERVISOR : AR. BOBBY LOW`
SITE ANALYSIS

LOCATION
PLAN VIEWS
INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 3
SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SITE ANALYSIS
WIND ROSE
DIAGRAM

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 4


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SITE ANALYSIS
BUILDING HEIGHTS/ FIGURE
GROUND MAP

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 5


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SITE ANALYSIS
SITE ACCESSIBILITY

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 6


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SITE ANALYSIS
Public Transport

Perumahan
PDRM Stop

Pangsapuri
7 Eleven Stop
PKNS Stop

Pos Malaysia Unitar PJ Stop


Stop
Perumahan
SS5B Stop

Rumah No
Stop

Jabatan
Kastam PJ

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 7


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 8
SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
JEN – JOHOR JEN – BEI JING JEN – BEI JING

PRECEDENT STUDIES
– HOTEL JEN
JEN - JOHOR JEN - SINGAPORE JEN - HONG KONG

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 9


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
JEN – BEI JING JEN – BEI JING

PRECEDENT STUDIES
– HOTEL JEN
JEN – HONG KONG JEN – SINGAPORE

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 10


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
BUSINESS MODEL- HOTEL
JEN
1. NETWORK 2. SOCIETY 3. MEMBERS 4. WORKOUT 5. GOURMET
We’ve provide spaces for We bring a connected We organise a dynamic A range of facilities and Lounges and restaurants
networking to create an community of the curious roster of curated events. programs to fuel your to experience wide
inclusive community of and creative. mind and body ranging international
innovators and influecers. cuisine

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 11


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
APPROACH & CONCEPT - HOTEL JEN
A BUSINESS HOTEL WITH A HOLISTIC WORK
ENVIRONMENT
- A NATURAL ENVIRONMENT TO ENCOURAGE PHYSICAL, MENTAL AND SOCIAL SENSE OF WELLBEING
- PROMOTING PHYSICAL FITNESS TO ENSURE YOU ARE PRIMED TO PERFORM
- TO CREATE AN INCLUSIVE ENVIRONMENT AT A CULTURAL LEVEL

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 12


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
APPROACH & CONCEPT
MASSING / SHADOW STUDY

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 13


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
APPROACH & CONCEPT CIRCULATION

Bomba appliance road

Loading/Unloading
Roofed Pedestrian
pathway

Driveway to sub-
basement

Bomba Appliance Road

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 14


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
APPROACH & CONCEPT ORIENTATION & FAÇADE TREATMENT

EAST

WEST

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 15


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
APPROACH & CONCEPT REFERENCE IMAGE

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 16


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
CONSTRUCTION DETAILS

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 17


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
STRUCTURAL
AXONOMETRIC

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 18


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
BOMBA

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 19


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
ELECTRICAL LAYOUT

20
INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 20
SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
COLD WATER LAYOUT

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 21


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
AIR-CON & MECHANICAL VENTILATION
DAIKIN VRV SERIES

While Daikin VRV System is a central airconditioning


systems, this system combines the air conditioning
system on a single refrigerant system, thus reducing the
space required for ductings, cooling tower and other
piping works needed for central air conditioning systems.

The VRV series also allows the shutdown


of individual indoor units without shutting
down the whole VRV system. Easing
works during maintenance period as the
indoor units can still operate.

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 22


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
AIR-CON & MECHANICAL VENTILATION
DAIKIN VRV SERIES

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 23


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SANITARY LAYOUT

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 24


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM
HITACHI MACHINE ROOM LESS ELEVATOR SYSTEM

Machine Room Less (MRL) Elevators basically require less


space and power. One difference between the MRLs and
the conventional lift with motor room is the absence of
the traction machine room, reducing the height
overhead, simplifying construction.

Furthermore, Hitachi is working in reducing energy


consumption through various design options provided for
the lift system.

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 25


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 26


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM
HITACHI MACHINE ROOM LESS ELEVATOR SYSTEM

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 27


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM
HITACHI MACHINE ROOM LESS ELEVATOR SYSTEM

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 28


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 29


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
MECHANICAL TRANSPORTATION SYSTEM
FRONT VIEW OF LIFT ENTRANCES

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 30


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
SKETCHES

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 31


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
BOARDS

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 32


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`
BOARDS

INTEGRATED DESIGN PROJECT, MAJLIS PEPERIKSAAN TEH TSU TSEN 33


SENIBINA, LAM 2022 SUPERVISOR : AR. BOBBY LOW`