PPT3-Quality in Production
PPT3-Quality in Production
PPT3-Quality in Production
Week 3
Quality in Production
Quality in Production
SUB TOPIC
Process Control
The Control Charts
Control Chart for Variable
PROCESS CONTROL
Process Control
Environment
• Machinery
Input Output
• Manpower
• Methods (Products)
(Material)
• Measurements
RECEIVING INSPECTION
Sampling
100% inspection 5%, 10%, etc
High cost Based on regulation or agreement
Even with 100% inspection, only MIL-STD-1916 required SPC
80% of the defects are found implementation reduction cost of
tools and operator limitation sampling and surveillance
THE CONTROL CHARTS
The Control Charts
as shown on the control chart. These are typically called three-sigma control
limits.2
Photolithography Example
Important quality characteristic in hard bake is resist
flow width
Process is monitored by average flow width
– Sample of 5 wafers
– Process mean is 1.5 microns
– Process standard deviation is 0.15 microns
Note that all plotted points fall inside the control
limits
– Process is considered to be in statistical control
Shewhart Control Chart Model
How the Shewhart Control Chart Works
Control Chart Development
– Variables
• Continuous scale of measurement
• Quality characteristic described by central tendency and a
measure of variability
– Attributes
• Conforming/nonconforming
• Counts
Statistical Basic of
Chart
There is no mathematical
or statistical relationship
between the control
limits and the
specification limits
Rational Subgroups
Solution :
and
The s2 Control Charts
REFERENCES