62nd Esc Meeting Final Presentation
62nd Esc Meeting Final Presentation
62nd Esc Meeting Final Presentation
MEETING
Item403A-Diesel-Electric-Cont.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Diesel to Electric loco conversion
RDSO’s NOTE:
Item403A-Diesel-Electric-Cont.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Diesel to Electric loco conversion
Item403A-Diesel-Electric-Cont.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Diesel to Electric loco conversion
Item 403A-Diesel-Electric-Cont.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Diesel to Electric loco conversion
Proposed Layout
Proposed Layout
Item 403A-Diesel-Electric.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Diesel to Electric loco conversion
TE-Speed Curve
Item403A-Diesel-Electric-Cont.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
NEW ITEM NO. : 403
SUBJECT : Dual Mode Shunting Locomotive.
GROUP : Elect.(TRS)
PROPOSED BY : Railway Board
RDSO’s NOTE:
3 wires for MU
6 wires for BL key duplication
2 wires for LED indication signal
RDSO’s NOTE:
DPWCS Architecture
Item 405-DPWCS-Contd.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Radio equipment for DPWCS
• OEMs of DPWCS are using different Radio Equipment leading
to problem in Interoperability among different makes of
DPWCS.
Item 405-DPWCS-Contd.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
Radio equipment for DPWCS
• Common RF devices in DPWCS will help to achieve following
objectives.
Item 405-DPWCS.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
NEW ITEM NO. : 406
SUBJECT : a) Pan India maintenance schedule (IA, IB
and IC only) for Electric Locomotives.
b) All Electric Locos to be attended in the
nearest Electric Loco Sheds for attending
all defects not involving lifting and also
for attending schedule maintenance of IT,
RDSO’s NOTE: IA and IB.
GROUP : Elect.(TRS)
PROPOSED BY : SCR
NOTE of SCR:
RDSO’s NOTE:
Some advantages of this concept are as under:
RDSO’s Note:
• A UIC cable runs through the whole train which transmits the
electrical signals for brake application & release as well as
monitor the continuity.
BP (Pneumatic)
Distributor Valve
Brake Cylinder
UIC Plug
UIC Socket
UIC Dummy
Socket
FP
TEST BOX B
P
Distributor Valve
• At present the data of RDS for three phase loco and of MPCS
V3 for conventional loco are on private servers of the
vendors, who are supplying the equipment.
CLW’s NOTE:
• Nowadays, locomotives have three different systems for
recording operational data, video and voice.
Item 410-OSDR-Contd.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
OSDR for Electric Locomotives
Item 410-OSDR-Contd.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
OSDR for Electric Locomotives
RDSO’s NOTE:
Item 410-OSDR.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
NEW ITEM NO. : 411
SUBJECT : Up-gradation of existing OHE from 160 kmph
to 200 kmph.
GROUP : RE
PROPOSED BY : Railway Board
RDSO’s NOTE:
RDSO’s NOTE:
• Purchase from open market will mean discontinuing the
practice of CORE approving such vendors.
Item 412-Reduction.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
NEW ITEM NO. : 413
SUBJECT : Low cost OHE Design.
GROUP : RE
PROPOSED BY : Railway Board
RDSO’s NOTE:
Spacing of the TSS shall be 100 km. This will reduce the
cost of the project to a substantial extent and in the event
of a future increase in traffic, the FP can be installed at a
spacing of 50 km.
RDSO’s NOTE:
• The current Transformer of 0.2/0.2 s accuracy class and
potential transformer of 0.2 accuracy may be used at TSS
for ABT metering.
• For the layout of CTs & PTs in TSS for ABT metering the
Drawing no. TI/DRG/PSI/TSSLO/RDSO/00004/02/1 Rev.
‘A’ & Drawing no. TI/DRG/PSI/TSSLO/
RDSO/00005/02/1 Rev. ‘A’ has been issued by RDSO vide
letter no. TI/PSI/DRG/TSS-SPC/POLICY/15 dated
15.07.2015. Revising the earlier layout of TSS for new TSS.
RDSO’s NOTE:
• A committee comprising of EDTI, CEDE/NCR and CEDE/NR
had submitted a report, which was deliberated in the 61 st
ESC regarding the Periodicity of Maintenance of tower
Wagons.
RDSO’s NOTE:
• Closed
Item 418-Overhead Cross Feeders.
RESEARCH DESIGNS AND STANDARDS ORGANISATION
NEW ITEM NO. : 419
SUBJECT : Cadre of Tower Wagon Driver to be made
part of Running Staff.
GROUP : RE
PROPOSED BY : SCR
RDSO’s NOTE:
• RDSO is of the view that in the absence of running staff, the
OHE Lineman/Technicians may be utilized after suitable
category of medical examination, providing training related
to tower wagon operation, traffic safety & road learning etc.
RDSO’s NOTE:
• In diesel electric tower cars, uses of ac propulsion system in
lieu of DC propulsion system will replace rectifier and
traction motor only with IGBT based convertor unit and 3-
phase induction motor, whereas primary source of traction
power i.e. diesel engine shall be as it is.
b) Land based
RDSO’s NOTE:
a) The life of the wiring dependents on:
RDSO’s NOTE:
• Degradation of conductor-
oxidation /corrosion,
• With time, the occupant connect more and more load in the
existing wiring system leading to overloading.
c) Deterioration of insulation.
1. Role of IRIEEN
Its present role & future we envisage
What more needs to be done.
7. Future vision