Software Testing

Software Testing Life Cycle


(STLC)

Software Engineering Software Testing Slide 1


STLC

Software Engineering Software Testing Slide 2


Requirement Analysis

During this phase of STLC, analyze and study
the requirements. Have brainstorming sessions
with other teams and try to find out whether the
requirements are testable or not.

This phase helps to identify the scope of the
testing.

If any feature is not testable, communicate it
during this phase so that the mitigation strategy
can be planned.

Software Engineering Software Testing Slide 3


Test Planning


This phase is also called as Test Strategy phase.

In this phase, the Test Manager is involved to determine
the effort and cost estimates for the entire project.

It defines the objective & scope of the project.

Software Engineering Software Testing Slide 4


Test Case Development

The Test case development begins once the
test planning phase is completed.

This is the phase of STLC where testing team
notes the detailed test cases.

Along with test cases, testing team also
prepares the test data for testing.

Once the test cases are ready then these test
cases are reviewed by peer members or QA
lead.

Software Engineering Software Testing Slide 5


Test Environment Setup

Setting up the test environment is vital part of the Software Testing Life Cycle.

A testing environment is a setup of software and hardware for the testing
teams to execute test cases.

It supports test execution with hardware, software and network configured

he test environment involves setting up of distinct areas like :

Setup of Test Server – Every test may not be executed on a local machine. It
may need establishing a test server, which can support applications.

Network – We need to set up the network as per requirements.

Test PC Setup – We need to set up different browsers for different testers.

Bug Reporting – Bug reporting tools should be provided to testers.

Creating Test Data for the Test Environment – Many companies use a
separate test environment to test the software product. The common approach
used is to copy production data to test.

Software Engineering Software Testing Slide 6


Test Execution

The next phase in Software Testing Life Cycle
is Test Execution.

Test execution is the process of executing the
code and comparing the expected and actual
results.

When test execution begins, the test analysts
start executing the test scripts based on test
strategy allowed in the project

Software Engineering Software Testing Slide 7


Test Cycle Closure

The final phase of the Software Testing Life Cycle is
Test Cycle Closure. It involves calling out the testing
team member meeting & evaluating cycle completion
criteria based on Test coverage, Quality, Cost, Time,
Critical Business Objectives, and Software.

A test closure report by the test lead is published after
accomplishing the exit criteria and finishing the testing
phase.

Software Engineering Software Testing Slide 8