OTHER ACTIVITIES
• Relevant officials of HRDC attended the monthly PRM with Director (Projects) held in conference hall, THP at Rinchentse on 7th May 2020.
• Conducted 2nd Quarterly HRDC Coordination Meeting on 29.05.2020.
• Board Directors visited HRDC facility on 16th May 2020. They were presented with HRDC brochures and were also briefed on the different testing
facilities and services provided by HRDC.
• Head CoEACaP attended condition assessment of CHP (Generator, Transformer & LPOF cables) meeting at CHP as a committee member.
• Mr. Rinchen Wangdi participated in the preliminary studies on Plant Digitization as a team member from 22 nd May-1st June 2020.
• Monthly data analysis and report generation for geotechnical instrumentation & monitoring for PHPA-II ( submitted on 14 th May 2020).
• Site visit to KHP to inspect the sites of crack repair works in Powerhouse & Dam( 15 th to 18th May 2020).
• Tender evaluation for the work “ Repair of Cracks in Powerhouse and Dam of KHP” ( 20 th to 22nd May 2020).
• Tender evaluation and report submission for the work “ Extension of HRDC Block at THP” (25 th to 28th May 2020).
• Data analysis and report generation of bathymetric survey for KHP dam reservoir (21 st May 2020).
Monthly Operating Dashboard
• Stack Emission Test of Diesel Generator Set at THP Dam, CHP Dam and BHP.
• Chain Pulley inspections of CHP Dam.
• Thermography Scanning of all the electro-mechanical equipment installed at CHP Dam and THP Power House.
• Ultrasonic Testing conducted on Stator Brazed Bars of Unit#1 at CHP.
• Ground Vibration data downloading at THyE.
• Ultrasonic Testing conducted on Governor OPU Pipelines at THP .
• Vibration Measurement of Generating Unit#II Upper stage at BHP.
• Acoustic leak detection on ABC cable using SDT 270 at Phobjikha , BPC.
• DGA for U # 1 & 2 (R, Y & B) phase of DHPCL and BPC, Phuentsholing.
• DGA and oil condition assessment for GT # 1, 2, 3, 4, 5 MVA transformers & Spare transformer of KHP, 30MVA (1, 2 & ICT) U/Stage transformers,
15MVA (1 & 2) transformers and 5MVA DT transformer of BHP.
• Lubricating oil condition assessment for U # 1 (Gov. tank, UGB, LGB & TGB), U # 2 (Gov. tank, UGB, LGB & TGB), Desilter Inlet, Desilter Outlet, Intake
Gate and TRCM samples of DHPCL and U # 1 & 2 (Bearing oil) Upper Stage BHP.
• Suspended sediment concentration analysis of Intake Dam, THP for the month of April 2020, Intake Dam, TRT and Lubichhu of CHP for the month of
April 2020, THyE for the month of March and April 2020 and CHP Intake Dam during Cyclone Amphan.
Profit & Loss Amount (Million Nu.) Inventory Amount (Million Nu.) Assets Purchase Amount (Million Nu.)
Total Income Electromechanical
Direct Expenses Vehicle
Tools & Plants
Operation & Maintenance Tools & Plants
Expenses
Information & Fire & Safety
Employee Remuneration Technology
& Benefits
General Items Office Equipment
Human Resource
Development Expenses Printing & Stationary
Furniture & Fixture
Other General Expenses Stock of Liveries
Deadline/ Weightage
ISO SN Description Status
Target (%)
Q Prepare and submit a proposal to • New charge out rates of HRDC services have been
3.2.1 Feb 3
Management approved by the DGPC Management on 02.03.2020.
Conduct insulation diagnostics tests and • Insulation diagnostic tests are being carried out at CHP
and necessary coordination is undergoing for carrying
maintain corresponding test data repository
Q 3.2.4 Sep 10 out similar tests in other DGPC plants.
of instruments (CTs, PTs & CVTs-66kV & above)
across DGPC Plants
Complete the condition assessment of CHP’s • Insulation Diagnostic Test and PD measurement was
Unit’s-II & IV Generators, 35 MVA GTs, 20 MVA carried out for 35MVA GTs(unit 2,3 &4) and 20MVA
Q 3.2.5 Power Transformers, 220 kV LPOF Cables, Nov 10 Power Transformers at CHP
associated ancillaries and nozzle injector • Work in progress.
system and submit a report to management
Monthly Operating Dashboard
Deadline/ Weightage
ISO SN Description Status
Target (%)
Conduct geophysical testing at Dams of CHP, • Seeking of techno-commercial offers in progress. Head
Q 3.2.9 Dec 7 HRDC to follow up on Budget and further direction as
THP & KHP
per 2nd HRDC Coordination Meeting.
Monthly Operating Dashboard
Deadline/ Weightag
ISO SN Description Status
Target e (%)
Q 3.2.13 Implementation of safety culture Jan-Dec 5 • All the safety requirements are being adhered to &
maintained in place.