Globe Telecom Inc3
Globe Telecom Inc3
Globe Telecom Inc3
PRACTICOM REPORT
TELECOM 101
Wireless Communication Systems (CS to PS to EPC)
• Locating the Subscriber
-Locating the subscriber can be done by the entire VLR area. Each MSC has several location areas. A
location area is an area where in the switch searches for the addressed mobile station
• Base Station Sub-System (BSS)
• BSC- Base Station Controller
- Controls the radio network, and is responsible for the following
• BTS- Base Transceiver Station
- Maintain the air interface, it does the ciphering and speech processing
• TC- Transcoder(old)
- It takes care of the speech transcoding by converting speech from digital format to another
MSISDN- Mobile Station International Subscriber Directory Number
PUBLIC USER
• COUNTRY CODE (CC): +63
• NATIONAL DESTINATION CODE (NDC): 917
• SUBCRIBER NUMBER (SN) 1234567
PRIVATE USER
• MOBILE COUNTRY CODE:515
• MOBILE NETWORK CODE:02
• MSIN:01234569
MOBILITY MANAGEMENT
• LOCATION AREA CODE:1234
NETWORK MANAGEMENT SUBSYSTEM
• Fault Management
• Configuration Management
• Performance Management
MOBILITY MANAGEMENT
• PAGING
• HANDOVER
Call Set-up(Mobile Originating-Mobile Terminating)
-HLR Databased contents
ISLACOM-01
GLOBE-02
SMART-03
BAYANTEL-04
SUN-05
DITO-66
Call Establishment (MO-MT)
2G X G900 1,2,3
G1800 11,12,13
4G F L1800 11,12,13-101,102,103
W L2100 91,92,93,-191,192,193
L L700 171,172,173
Y L900 121,122,123
H L2600-LEGACY 31,41,51
K L2300 131,141
V L2600MM 61,71,201,211,231
5G P NR700
N NR2600
M NR3500
700-900 LOW BEAM
1800-2100 MID BEAM
2300>=HIGH BEAM
2G KEY PERFORMANCE
INDICATOR (KPI)
AVAILABILITY.
TRAFFIC.
BLOCKING.
CALL SETUP FAILURE RATE(CSFR).
DROPPED CALL RATE (DCR).
IMMEDIATE ASSIGNMENT FAILURE RATE
(IAFR).
4G KEY PERFORMANCE
INDICATOR (KPI)
AVAILABILITY.
RADIO RESOURCE CONTROL CONNECTED.
PHYSICAL RESOURCE BLOCK UTILIZATION.
TRAFFIC VOLUME DOWNLOAD/UPLOAD
THROUGHPUT.
E-UTRAN RADIO ACCESS BEARER SUCCESS
RATE.
RADIO RESOURCE CONTROL SUCCESS RATE.
LEARNINGS FROM FIELD
• INTRODUCE INSIDE OF THE CELL SITE.
• ALARM MONITORING.
• HANDS ON ACCESS BTS TECHNOLOGY ONE BY ONE.
• WORST CELL MONITORING.
• INTIGRATE CELL SITE.
• GRIPPING ARG45.
• DIVE TEST VOLTE CALL DROP/INTERFERENCE
SCANNING.
• CHANGE EQUIPMENT AND TECHNOLOGY.