A SUMMER TRAINING PRESENTATION 0N
NATIONAL THERMAL POWER PLANT
KAHALGAON (BIHAR)

Jul 22, 2024 02


NTPC

CONTENTS
 Introduction
 Boiler
 Turbine & Auxillary
 Ash Handling
 Off- site
 Advantage/ Disadvantage
 Application
 Future Scope
 Reference
Jul 22, 2024 03
INTRODUCTION

India’s largest power company ,NTPC was set up in 1975 to accelerate power
develop in india.NTPC is emerging as a diversified power major with presence
in the entire value chain of the power generation ,which is the mainstary of the
company ,NTPC has already ventured into consultancy.power trading,Ash
utilisation and coal mining.
kahalgaon super thermal power station (khstpp) is located in kahalgaon in
Bhagalpur district of Bihar. The power plant is one of the coal based power plant
of NTPC.

CAPACITY :- The Total installed capacity of the plant is 2340 Mw

Jul 22, 2024 04


NTPC, Kshpp Project
Location : Kahalgaon , Dist-Bhagalpur(Bihar),813214
Total Land : 3,360 Acres
Land for plant : 883 Acres
Land for township : 432 Acres
Land for Ash dyke :1395 Acres
Configuration : stage - 1 (4*210 MW)
: stage - 2 : Phase 1 (2*500 MW)
: Phase 2 (1*500 MW)
Sourse of coal : Rajmahal coal field of ECL
Fuel Requirement : 4.1 million ton per year Stage - 1
: 6.62 million ton per year for Stage - 1
: 3 million ton per year for Stage - 2
Sourse of water : Ganga River
Beneficiary States : West Bengal, Bihar, Jharkhand, Orissa, Sikkim
Jul 22, 2024 05
LAYOUT OF POWER PLANT:

Jul 22, 2024 06


Basic Power Plant Cycle (Rankine cycle)
T-S DIAGRAM

Jul 22, 2024 07


BOILER MAINTENANACE DEPARTMENT
 Boiler:-

 Steam generating device for specific purpose.


 Capable to meet variation in load demand.
 Capable of generating steam in a range of operating pressure and temperature.
 For utility purpose ,it should generate steam uninterrupediy at operating pressure and
temperature for running steam turbine.

 Raw material for design of boiler:

 Cast iron:- It is too brittle to withstand years of continuous, high thermal and pressure
Resisting capacity.
 Carbon steel :- It has high fatigue strength, good yield strength, excellent thermal property.
(mostly used)
 A 500 MW steam generator consumers about 8000 tonnes of coal every day.
 It will be considered if it requires about 200 cubic meter of D M water in a day .
 It will produce about 9500 tonnes of carbon di- oxide every day.
Jul 22, 2024 08
BOILER ACCESSORIES :
 The integral part of the boiler are called boiler accessories.
 It increase Boiler Efficiency
EX- 1) Superheater: Increase the temperature of the steam
above its saturation point.
2) Economiser: A device which used to heating feed water
by waste flue gases.
3) Feed pump: Used to deliver feed water to the turbine.
4) Injector: Used to feed the water into the boiler.
5) Air preheater: It increase the temperature of air
before it enters the furnace.
6) Steam Separator
Jul 22, 2024 09
 Economiser
 Superheater
 Feed pump
Jul 22, 2024 10
TURBINE MAINTENANCE DEPARTMENT (TMD)

TURBINE :- A steam turbine is a rotating device which converts thermal energy


into mechanical energy.

OPERATING PRINCIPLE :-

 Steam enters into the turbine through a nozzle. In the nozzle, heat energy from steam
is converted into kinetic energy and the steam is expanding. Steam pressure at the exit
of nozzle is smaller when compared with at the time of enter into nozzle, but the
velocity of steam out from nozzle is greater than at the time of enter into the nozzle.

 The steam gushing out of the nozzle is directed to the turbine blades with arches
shaped and fitted around the wheel turbines. Steam flowing through gaps between the
turbine blades is deflected towards following the curve of the turbine blades. The
changes in steam velocity raise the force that encourages and then rotate the turbine
wheel and shaft

Jul 22, 2024 11


TURBINE SYSTEM

1 2 3 4 5 6 7

HPT LPT
IP
T GENERATOR
EXCITER
THREE STAGE TURBINE :
• HIGH PRESSURE TURBINE (HPT)
• INTERMEDIATE PRESSURE TURBINE (IPT) CONDENSER
• LOW PRESSURE TURBINE (LPT)

SEVEN NOS JOURNAL BEARINGS


BEARING N0. 2 THRUST CUM JOURNAL BEARING

FOUR NOS RIGID COUPLINGS BETWEEN


• HP-IP TURBINE
• IP-LP TURBINE
• LP-GENERATOR
•GENERATOR - EXCITER
Jul 22, 2024 12
CONDENSOR:

 The condenser condenses the steam


from the exhaust of the turbine into
liquid to allow it to be pumped. If the
condenser can be made cooler, the
pressure of the exhaust steam is
reduced and efficiency of
the cycle increases.
 To provide lowest economic heat
rejection temperature for steam.
 To convert exhaust steam to water for
reserve thus saving on feed water
requirement.
Jul 22, 2024 13
GENERATOR

 Generator or
Alternator is the
electrical end of a turbo-
generator set. It is
generally known as the
piece of equipment that
converts the mechanical
energy of turbine into
electricity. The
generation of electricity
is based on the principle
of electromagnetic
induction.

Jul 22, 2024 14


Coal Handling System Equipment
 Wagon Trippler
 Conveyor Belt
 Pulleys
 Take Ups
 Skirt Board
 Scrappers
 Magnetic seprator
 Vibrating screen
 Crushers

Jul 22, 2024 15


CRUSHERS
To crush the coal from 200mm to 20mm size
from vibrating screen
Crusher hammer are made of MAGNEESE STEEL .
Hammer row -4(stage 1)
(a)Row-1 & 2 =18 hammer each
(b)Row-3&4=20 hammers each

No of hammer in each Crusher-


•stage-1 = 76 hammers
•stage-2 = 92 hammers
•Weight of each hammer=18.5kg
•Crushing motor rating -740kw/3.3kv
•Life of hammer =4 lac MT of coal
Jul 22, 2024 •Normal capacity=600 tons/hr 16
CONVEYOR BELTS
Made of diff. Layers or piles of fabric duck with rubber
protected by a rubber cover on both sides & edges.
Fabric duck are designed to withstand tension created in
carrying the load .
Nylon rubber cover protect the fabric duck.

Material =fire resistant grade.


Belt Width=1600 mm.
Strength= 1000/1250 kN.
Belt speed=3.2-3 m/s.
Belt length=20km.

Jul 22, 2024 17


ASH HANDLING DEPARTMENT
WHAT IS ASH ?
Ash is the residue remaining after the coal has been
burn under standard conditions.
Typical ash composition : SiO , Al O , Fe O , CaO,
2 2 3 2 3
MgO etc.
Coal with more SiO & Al O , Ash MP > 1400ºC
2 2 3
Coal with more Fe O , CaO & MgO, Ash MP <
2 3
1100ºC

Jul 22, 2024 18


OFF-SITE DEPARTMENT:
Water Treatment
Cooling Tower : The cooling tower is a semi-
enclosed device for evaporative cooling of water by
contact with air. The hot water coming out from the
condenser is fed to the tower on the top and allowed
to tickle in form of thin sheets or drops. The air flows
from bottom of the tower or perpendicular to the
direction of water flow and then exhausts to the
atmosphere after effective cooling.

Jul 22, 2024 19


WATER TREATMENT PLANT

Jul 22, 2024 20


Why water treatment ?
 Raw water contains many dissolved minerals and organic
materials.
 At high temperature certain minerals left scaling on the tube
metal of the boiler and cause permanent damage.
 Some dissolved minerals leads to corrosion of tube metals.
Some leads to foaming .
 At high pressure and temperature an element, silica can be
carried away with steam causing damage to turbine low
pressure stage.
 A Thermal Power Station needs water of varying quality for
different process and hence the requirement.
 The performance and life expectancy of the station greatly
depends on water chemistry compliance.
Jul 22, 2024 21
COOLING TOWER:

Jul 22, 2024 22


COOLING FAN SPECIFICATION:

Description Stage-I Stage-II


Type Axial Flow Axial Flow
No. of fans / tower 16 12
Diameter 24 feet 28 feet
No. of blade 6 7
Blade angle 13o 13o
Fan speed 151 Rpm 118 Rpm
Absorbed power 35 KW 56 KW

Jul 22, 2024 23


CHIMNEY SPECIFICATION:
No. Of Chimney – 3
Height – 214 m

Jul 22, 2024 24


ADVANTAGE : DISADVANTAGE :

 Steam engines and turbines  Maintenance and operating


can work under 25 % of cost are High.
overload continuously.  Cost of plant increase in
 Cheaper in initial cost Temperature and Pressure.
compared to Diesel power  Large quantity of water is
plant. required.
 Can be located very  Environment trouble due to
conveniently near the load Smoke and heat in the plant.
station.  Difficulty in coal handling.
 They can respond to rapidly  Maximum of heat energy
changing loads without lost.
difficulty.
Jul 22, 2024 25
APPLICATION :
Household heating
appliances
 Incandescent electric bulb
Electric fuse
Industry
Railway

Jul 22, 2024 26


FUTURE GOAL :

 The Company has developed a long term plan to


become 128000 MW company by the year 2032
 Company has 23004 MW under construction ,
 NTPC also developing a joint-venture coal-based
power plant 1,320 MW (2x660) with
Bangladesh Power Development Board known as
Bangladesh India Friendship Power Company in
Bangladesh

Jul 22, 2024 27


REFRENCES :
 https://en.wikipedia.org/wiki/Kahalgaon_Super_Th
ermal_Power_Station
 http://www.ntpc.co.in/power-generation/coal- base
d-power-stations/kahalgaon

Jul 22, 2024 28


NTPC

Jul 22, 2024 28

You might also like