Man Sys Design and Control
Man Sys Design and Control
Systems
Manufacturing System
Design & Control
Manufacturing System Design & Control
3 hybrid layouts:
•Cellular
•Flexible Manufacturing Systems
•Mixed-model Assembly Lines
Manufacturing System Design Control
Process Layout:
•Similar activities grouped together in work areas
•Suitable for low volume or batch production
•Flexible
•Not very efficient
•Storage space – large receiving, small shipping
•Large aisles for movement of material
Lathe Milling Department Drilling Department
Department
D D D D
M M M
L L
D D D D
L L
Grinding Department Painting Department
L L G G G G P
P
L L
Receiving and Shipping
Assembly
A A A
Manufacturing System Design Control
Product Layout:
•Arrange activities in sequence of operation
•Line set up for one product
•Specialised machines
•Suitable for mass production
•More automated than process layouts
•Efficient
•Line flow – avoid bottlenecks
•Not flexible
IN
OUT
Manufacturing System Design Control
Fixed Position Layout:
•Large projects too big to move
•Equipment and parts moved in and out of work area
•Highly skilled workers - costly
Manufacturing System Design Control
Hybrid Layouts:
Try to mix flexibility of process layout with efficiency of
product layout
Cellular Layouts:
•Machines grouped into cells
•Cells process parts with similar features
•Work cell resembles a small assembly line (product)
•Layout between cells treated as process layout
Manufacturing System Design Control
4 7 9
6
5 8
2 10
12
1 3 11
Raw Materials
Manufacturing System Design Control
Assembly
4 8 10 12
9
6
2
11
3 5 7
1
Raw Materials
Manufacturing System Design Control
Progressive FMS:
•All parts follow same progression through the work
stations
•Best where group technology can be applied
Unload Station Load Station
Pallet
Progressive FMS
Manufacturing System Design Control
Closed Loop FMS:
•Larger variety of parts
•Parts can follow different paths
•Parts can skip stations
Load Unload
Pallet
Traditional line
U Shaped Line
Manufacturing System Design Control
Capacity Management:
•Demand for product can fluctuate over time
•Capacity < demand - Lose business
•Excess capacity: storage cost, labour cost etc.
•Capacity planning: match capacity to present and
anticipated demand
Capacity Planning
•Capacity Lead Strategy
•Capacity Lag Strategy
•Average Capacity Strategy
Manufacturing System Design Control
Capacity
Quantity
Demand
Time
Manufacturing System Design Control
Demand
Quantity
Capacity
Time
Manufacturing System Design Control
Capacity
Quantity
Demand
Time
Manufacturing System Design Control