Bayside is a development, currently under construction, located on the eastern approach to Worthing town centre in West Sussex, England. Designed by Allies and Morrison, it consists of two main buildings, the tallest of which, Bayside Vista, is a 15-storey tower that reaches 52 metres (172 ft) and is the tallest building in Worthing. It replaced the Aquarena swimming pool. Construction began in November 2017 and the building was topped out on 1 October 2019. It was completed in 2022.
Property | Value |
---|---|
dbo:abstract |
|
dbo:address |
|
dbo:architect | |
dbo:buildingEndDate |
|
dbo:buildingStartDate |
|
dbo:cost |
|
dbo:height |
|
dbo:location | |
dbo:status |
|
dbo:thumbnail | |
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:address |
|
dbp:architectureFirm | |
dbp:buildingType |
|
dbp:completionDate |
|
dbp:cost |
|
dbp:elevatorCount |
|
dbp:floorCount |
|
dbp:location |
|
dbp:name |
|
dbp:opening |
|
dbp:owner |
|
dbp:startDate |
|
dbp:status |
|
dbp:toppedOutDate |
|
dbp:website | |
dbp:wikiPageUsesTemplate | |
dct:subject | |
georss:point |
|
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:homepage | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |