Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The proposed Crows Nest Wind Farm, will be located in south-eastern Queensland, 40 kilometres north of Toowoomba. It initially was to have an installed generating capacity of 124 MW that would produce intermittent electricity that could power some 47,000 homes during periods of high wind. It is expected that the wind farm will create 460 manufacturing and construction jobs and a further 15 full-time maintenance jobs in Crows Nest. The Crows Nest location on the western edge of the Darling Downs, offers some of the best average wind speeds available in Queensland, and the project will provide additional security of electricity supply in this fast-growing area.

Property Value
dbo:abstract
  • The proposed Crows Nest Wind Farm, will be located in south-eastern Queensland, 40 kilometres north of Toowoomba. It initially was to have an installed generating capacity of 124 MW that would produce intermittent electricity that could power some 47,000 homes during periods of high wind. It is expected that the wind farm will create 460 manufacturing and construction jobs and a further 15 full-time maintenance jobs in Crows Nest. The Crows Nest location on the western edge of the Darling Downs, offers some of the best average wind speeds available in Queensland, and the project will provide additional security of electricity supply in this fast-growing area. The project was acquired by AGL Energy in 2009 after purchasing it and another wind farm at Barn Hill in South Australia from Transfield Services. In June 2009, AGL was allowed to increase the number of turbines by 20 units and therefore the output from 124 MW to 200 MW. The cost of the project is now expecting to be A$270 million. (en)
dbo:installedCapacity
  • 200000000.000000 (xsd:double)
dbo:location
dbo:owner
dbo:status
  • Approved
dbo:wikiPageID
  • 17126715 (xsd:integer)
dbo:wikiPageLength
  • 4473 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 970418812 (xsd:integer)
dbo:wikiPageWikiLink
dbp:cost
  • 2.7E8
dbp:country
  • Australia (en)
dbp:location
dbp:name
  • Crows Nest Wind Farm (en)
dbp:owner
dbp:psElectricalCapacity
  • 200.0
dbp:status
  • Approved (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • -27.230833333333333 151.95944444444444
rdf:type
rdfs:comment
  • The proposed Crows Nest Wind Farm, will be located in south-eastern Queensland, 40 kilometres north of Toowoomba. It initially was to have an installed generating capacity of 124 MW that would produce intermittent electricity that could power some 47,000 homes during periods of high wind. It is expected that the wind farm will create 460 manufacturing and construction jobs and a further 15 full-time maintenance jobs in Crows Nest. The Crows Nest location on the western edge of the Darling Downs, offers some of the best average wind speeds available in Queensland, and the project will provide additional security of electricity supply in this fast-growing area. (en)
rdfs:label
  • Crows Nest Wind Farm (en)
owl:sameAs
geo:geometry
  • POINT(151.95944213867 -27.230833053589)
geo:lat
  • -27.230833 (xsd:float)
geo:long
  • 151.959442 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Crows Nest Wind Farm (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License