dbo:Infrastructure/length
| |
dbo:abstract
|
- The East Klang Valley Expressway, EKVE or Kuala Lumpur Outer Ring Road (KLORR) is a new expressway under construction in Klang Valley, Malaysia. The 39.5-kilometre-long (24.5 mi) expressway will connect Ukay Perdana in Ampang, Selangor and Bandar Sungai Long in Kajang. This expressway is part of the Kuala Lumpur Outer Ring Road (KLORR). The construction of the expressway was started on 1 September 2015. Once completed, the expressway will benefit 140,000 motorists per day. The phase 1 of the expressway stretches 24.1 km and costs MYR 1.55 billion. (en)
|
dbo:length
|
- 39500.000000 (xsd:double)
|
dbo:routeEnd
| |
dbo:routeEndDirection
| |
dbo:routeJunction
| |
dbo:routeNumber
| |
dbo:routeStart
| |
dbo:routeStartDirection
| |
dbo:routeTypeAbbreviation
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 10921 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:alternateName
|
- East Klang Valley Expressway (en)
|
dbp:country
| |
dbp:destinations
|
- Ulu Klang, Ukay Perdana, Lembah Jaya, Ampang, Hulu Langat, Bandar Mahkota Cheras, Kajang, Sungai Long (en)
|
dbp:directionA
| |
dbp:directionB
| |
dbp:formed
| |
dbp:headerType
| |
dbp:history
| |
dbp:junction
|
- Jalan Hulu Langat (en)
- Jalan Lembah Jaya (en)
- Persiaran Mahkota Cheras 1 (en)
|
dbp:lengthKm
| |
dbp:maint
| |
dbp:route
| |
dbp:terminusA
|
- Kuala Lumpur Middle Ring Road 2 (en)
- Jalan Ukay Perdana (en)
|
dbp:terminusB
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
gold:hypernym
| |
rdf:type
| |
rdfs:comment
|
- The East Klang Valley Expressway, EKVE or Kuala Lumpur Outer Ring Road (KLORR) is a new expressway under construction in Klang Valley, Malaysia. The 39.5-kilometre-long (24.5 mi) expressway will connect Ukay Perdana in Ampang, Selangor and Bandar Sungai Long in Kajang. This expressway is part of the Kuala Lumpur Outer Ring Road (KLORR). The construction of the expressway was started on 1 September 2015. Once completed, the expressway will benefit 140,000 motorists per day. The phase 1 of the expressway stretches 24.1 km and costs MYR 1.55 billion. (en)
|
rdfs:label
|
- East Klang Valley Expressway (en)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- East Klang Valley Expressway (en)
|
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |