Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Hitra Wind Farm is a 24-turbine wind farm located in the municipality of Hitra in Trøndelag county, Norway and operated by Statkraft. The farm is located on top of the Elsfjellet plateau in the central part of the island of Hitra, just 3 kilometres (1.9 mi) south of the village of Straum and about 15 kilometres (9.3 mi) west of Sandstad. Until the expansion of the Smøla Wind Farm in 2005, Hitra was the largest wind farm in the country and had total cost of 450 million kr. The Fosen Vind 1 gigawatt (1,300,000 hp) wind farm complex will include the nearby Hitra 2 wind farm.

Property Value
dbo:abstract
  • Hitra Wind Farm is a 24-turbine wind farm located in the municipality of Hitra in Trøndelag county, Norway and operated by Statkraft. The farm is located on top of the Elsfjellet plateau in the central part of the island of Hitra, just 3 kilometres (1.9 mi) south of the village of Straum and about 15 kilometres (9.3 mi) west of Sandstad. Until the expansion of the Smøla Wind Farm in 2005, Hitra was the largest wind farm in the country and had total cost of 450 million kr. Each of the 24 wind turbines can produce 2.3 megawatts (3,100 hp) of power for a maximum generated power of 55 megawatts (74,000 hp) and an annual production of 150 gigawatt-hours (540 TJ) for the whole farm. The farm was opened on 14 October 2004. The Fosen Vind 1 gigawatt (1,300,000 hp) wind farm complex will include the nearby Hitra 2 wind farm. (en)
  • ВЕС Хітра (Hitra) — норвезька наземна вітроелектростанція, споруджена в окрузі Сер-Треннелаг у регіоні Треннелаг (центральна частина узбережжя Норвезького моря, на захід від Тронгейма). Спорудження електростанції, розташованої на однойменному острові за 3 км південніше села Straum, розпочалось у 2003-му, а введення в дію припало на наступний рік. Вона складається з 24 турбін німецького виробництва Bonus B82/2300 одиничною потужністю 2,3 МВт. Діаметр ротора турбіни 82 метри. Загальна потужність ВЕС становить 55,2 МВт, розрахункове середньорічне виробництво електроенергії — 156 млн кВт·год. (uk)
dbo:buildingStartDate
  • July 2003
dbo:buildingStartYear
  • 2003-01-01 (xsd:gYear)
dbo:capacityFactor
  • 31.000000 (xsd:float)
dbo:country
dbo:location
dbo:openingDate
  • 2004-10-14 (xsd:date)
dbo:openingYear
  • 2004-01-01 (xsd:gYear)
dbo:owner
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageID
  • 14122476 (xsd:integer)
dbo:wikiPageLength
  • 3122 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 994406476 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 2004-10-14 (xsd:date)
dbp:constructionBegan
  • July 2003 (en)
dbp:country
  • Norway (en)
dbp:extra
  • Source (en)
dbp:imageCaption
  • View of the farm on top of the mountain (en)
dbp:location
dbp:name
  • Hitra Wind Farm (en)
dbp:nameOfficial
  • Hitra vindpark (en)
dbp:owner
dbp:psAnnualGeneration
  • 150 (xsd:integer)
dbp:psElectricalCapFac
  • 31.0
dbp:psElectricalCapacity
  • 55.200000 (xsd:double)
dbp:psUnitsOperational
  • 24 (xsd:integer)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dbp:windFarmType
  • Onshore (en)
dbp:windSiteUsage
  • Mountain plateau (en)
dcterms:subject
gold:hypernym
georss:point
  • 63.54194444444445 8.758888888888889
rdf:type
rdfs:comment
  • ВЕС Хітра (Hitra) — норвезька наземна вітроелектростанція, споруджена в окрузі Сер-Треннелаг у регіоні Треннелаг (центральна частина узбережжя Норвезького моря, на захід від Тронгейма). Спорудження електростанції, розташованої на однойменному острові за 3 км південніше села Straum, розпочалось у 2003-му, а введення в дію припало на наступний рік. Вона складається з 24 турбін німецького виробництва Bonus B82/2300 одиничною потужністю 2,3 МВт. Діаметр ротора турбіни 82 метри. Загальна потужність ВЕС становить 55,2 МВт, розрахункове середньорічне виробництво електроенергії — 156 млн кВт·год. (uk)
  • Hitra Wind Farm is a 24-turbine wind farm located in the municipality of Hitra in Trøndelag county, Norway and operated by Statkraft. The farm is located on top of the Elsfjellet plateau in the central part of the island of Hitra, just 3 kilometres (1.9 mi) south of the village of Straum and about 15 kilometres (9.3 mi) west of Sandstad. Until the expansion of the Smøla Wind Farm in 2005, Hitra was the largest wind farm in the country and had total cost of 450 million kr. The Fosen Vind 1 gigawatt (1,300,000 hp) wind farm complex will include the nearby Hitra 2 wind farm. (en)
rdfs:label
  • Hitra Wind Farm (en)
  • ВЕС Хітра (uk)
owl:sameAs
geo:geometry
  • POINT(8.7588891983032 63.541942596436)
geo:lat
  • 63.541943 (xsd:float)
geo:long
  • 8.758889 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Hitra Wind Farm (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License