Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

There are nineteen stations in the G:link, a light rail system serving the Gold Coast in Queensland, Australia. The system consists of a single 20-kilometre (12 mi) line that opened with sixteen initial stations on 20 July 2014, with another three stations opening on 17 December 2017. It is operated under contract by Keolis Downer and funded jointly by local, state and federal governments. Following public consultation, a 20.5-kilometre (12.7 mi) southern extension that will terminate at the Gold Coast Airport is in the planning stages.

Property Value
dbo:abstract
  • There are nineteen stations in the G:link, a light rail system serving the Gold Coast in Queensland, Australia. The system consists of a single 20-kilometre (12 mi) line that opened with sixteen initial stations on 20 July 2014, with another three stations opening on 17 December 2017. It is operated under contract by Keolis Downer and funded jointly by local, state and federal governments. Helensvale is the northern terminus of the system, connecting with Helensvale railway station, while Broadbeach South is the southern terminus. One station is located in Helensvale, two are located in Parkwood, seven stations are located in Southport, one is in Main Beach, six are in Surfers Paradise, and two are in Broadbeach. It takes 45 minutes to travel from one end of the line to the other. TransLink charges fares that increase as passengers travel through eight concentric zones radiating outward from the Brisbane central business district; all of the stations are located within zone 5. The system's average daily ridership is 21,000 as of February 2016. The most heavily trafficked station is Cavill Avenue, with an average 4,729 daily passengers in February 2016. Eighteen of the stations are street-level open-air structures featuring passenger canopies, and one is underground. Eleven stations have side platforms and eight have an island platform. Seven stations offer transfers to TransLink bus services. Park and ride facilities are also available at Helensvale and Parkwood stations: during the construction of Stage 2, 1000 car park spaces were built at the new Parkwood station, while 400 new car park spaces were built at Helensvale, in addition to the 877 existing spaces there. Following public consultation, a 20.5-kilometre (12.7 mi) southern extension that will terminate at the Gold Coast Airport is in the planning stages. (en)
dbo:thumbnail
dbo:wikiPageID
  • 49636150 (xsd:integer)
dbo:wikiPageLength
  • 31796 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1119886890 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdfs:comment
  • There are nineteen stations in the G:link, a light rail system serving the Gold Coast in Queensland, Australia. The system consists of a single 20-kilometre (12 mi) line that opened with sixteen initial stations on 20 July 2014, with another three stations opening on 17 December 2017. It is operated under contract by Keolis Downer and funded jointly by local, state and federal governments. Following public consultation, a 20.5-kilometre (12.7 mi) southern extension that will terminate at the Gold Coast Airport is in the planning stages. (en)
rdfs:label
  • List of G:link stations (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License