Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
An Entity of Type: Tram, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The T5 Eminönü–Alibeyköy Coach Station tram line (Turkish: T5 Eminönü–Alibeyköy Cep Otogarı tramvay hattı) is a tram line following the coastline of the Golden Horn on the European side of Istanbul, Turkey. Construction of the line began in 2016. The first section consisting of 12 stations between (tr) and at a length of 8.8 km (5.5 mi) was officially opened on 1 January 2021.

Property Value
dbo:abstract
  • The T5 Eminönü–Alibeyköy Coach Station tram line (Turkish: T5 Eminönü–Alibeyköy Cep Otogarı tramvay hattı) is a tram line following the coastline of the Golden Horn on the European side of Istanbul, Turkey. Construction of the line began in 2016. The first section consisting of 12 stations between (tr) and at a length of 8.8 km (5.5 mi) was officially opened on 1 January 2021. When completed, the line will be 10.1 km (6.3 mi) long with 14 stations each 60 m (200 ft) of length, and is expected to go into service in 2021. 30 trains will carry up to 114,000 passengers a day. Its route mostly follows the western coastline of the Golden Horn, and is built on the bank next to the existing street. In some places, it crosses the water on piles. The total travel time will be 35 minutes. The line uses Alstom's APS (a third rail embedded in the ground between the tracks) for electrification to avoid visual pollution, a difference from other tram lines in the city, which have traditional overhead wires suspended from roadside posts. (en)
  • Трамвайна лінія T5 Еміньоню–Алібейкьой (тур. T5 Eminönü–Alibeyköy tramvay hattı) — трамвайний маршрут, що прокладено вздовж берегу Золотого Рогу європейською частиною Стамбулу, Туреччина. Будівництво лінії було розпочато в 2016 році. Першу чергу, що має 12 зупинок між Джібалі та автостанцією Алібейкьой завдовжки 8,8 км було офіційно відкрито 1 січня 2021 року. Після завершення будівництва, що планується протягом 2021 року, довжина лінії сягатиме 10,1 км, на маршруті має бути 14 зупинок (довжина кожної 60 м). 30 трамваїв щоденно перевозитимуть 114 тисяч пасажирів. Його маршрут переважно прокладено вздовж західного узбережжя Золотого Рогу, колії прокладено вздовж наявної вулиці. Місцями, трамвай проходить над водою на палях. Повний час проїзду складає 35 хвилин. Маршрут електрифіковано контактною рейкою, що розташована між коліями аби уникнути візуального забруднення, що відрізняє цей маршрут від інших у Стамбулі, що обладнані звичайними контактними дротами. (uk)
dbo:isPartOf
dbo:location
dbo:numberOfStations
  • 14 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2021-01-01 (xsd:date)
dbo:openingYear
  • 2021-01-01 (xsd:gYear)
dbo:operator
dbo:routeEnd
dbo:routeStart
dbo:status
  • Operational (Cibali-Alibeyköy Coach Station)
  • Under construction (Cibali-Eminönü)
dbo:thumbnail
dbo:trackLength
  • 10100.000000 (xsd:double)
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 56199175 (xsd:integer)
dbo:wikiPageLength
  • 8627 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1106583897 (xsd:integer)
dbo:wikiPageWikiLink
dbp:color
  • 7 (xsd:integer)
dbp:dailyRidership
  • 114000 (xsd:integer)
dbp:depot
  • Alibeyköy Coach Station (en)
dbp:electrification
  • Third rail (en)
dbp:end
  • Alibeyköy Coach Station (en)
dbp:event
  • Operational (en)
  • Under construction (en)
dbp:event1label
  • First section (en)
dbp:event2label
  • Last section (en)
dbp:locale
dbp:logo
  • Istanbul T5 Line Symbol.svg (en)
dbp:logoWidth
  • 50 (xsd:integer)
dbp:mapName
  • Route diagram (en)
dbp:mapState
  • uncollapsed (en)
dbp:name
  • T5 Eminönü–Alibeyköy Coach Station (en)
dbp:open
  • 2021-01-01 (xsd:date)
dbp:operator
dbp:planopen
  • 2023 (xsd:integer)
dbp:start
dbp:stations
  • 14 (xsd:integer)
dbp:status
  • Operational (en)
  • Under construction (en)
dbp:stock
  • 30 (xsd:integer)
dbp:system
dbp:type
dbp:website
dbp:wikiPageUsesTemplate
dct:subject
rdf:type
rdfs:comment
  • The T5 Eminönü–Alibeyköy Coach Station tram line (Turkish: T5 Eminönü–Alibeyköy Cep Otogarı tramvay hattı) is a tram line following the coastline of the Golden Horn on the European side of Istanbul, Turkey. Construction of the line began in 2016. The first section consisting of 12 stations between (tr) and at a length of 8.8 km (5.5 mi) was officially opened on 1 January 2021. (en)
  • Трамвайна лінія T5 Еміньоню–Алібейкьой (тур. T5 Eminönü–Alibeyköy tramvay hattı) — трамвайний маршрут, що прокладено вздовж берегу Золотого Рогу європейською частиною Стамбулу, Туреччина. Будівництво лінії було розпочато в 2016 році. Першу чергу, що має 12 зупинок між Джібалі та автостанцією Алібейкьой завдовжки 8,8 км було офіційно відкрито 1 січня 2021 року. (uk)
rdfs:label
  • T5 (Istanbul Tram) (en)
  • T5 (Стамбульський трамвай) (uk)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • T5 Eminönü–Alibeyköy Coach Station (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License