Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

About: Taki Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Taki Dam (滝ダム) is a gravity dam on the Tadami River, 7.3 km (5 mi) east of Tadami in Fukushima Prefecture, Japan. Surveys for the dam were carried out in 1958, construction began in 1959 and the dam was complete in 1961. The primary purpose of the dam is hydroelectric power generation and it supports a 92 MW power station consisting of 2 x 46 MW Kaplan turbines. The dam is 46 m (151 ft) tall and 264 m (866 ft) long. It creates a reservoir with a 27,000,000 m3 (21,889 acre⋅ft) capacity, of which 10,300,000 m3 (8,350 acre⋅ft) is active (or "useful") for power generation. The dam's spillway is controlled by four sluice gates and has a 200 m3/s (7,063 cu ft/s) discharge capacity.

Property Value
dbo:Infrastructure/length
  • 0.264
dbo:abstract
  • Taki Dam (滝ダム) is a gravity dam on the Tadami River, 7.3 km (5 mi) east of Tadami in Fukushima Prefecture, Japan. Surveys for the dam were carried out in 1958, construction began in 1959 and the dam was complete in 1961. The primary purpose of the dam is hydroelectric power generation and it supports a 92 MW power station consisting of 2 x 46 MW Kaplan turbines. The dam is 46 m (151 ft) tall and 264 m (866 ft) long. It creates a reservoir with a 27,000,000 m3 (21,889 acre⋅ft) capacity, of which 10,300,000 m3 (8,350 acre⋅ft) is active (or "useful") for power generation. The dam's spillway is controlled by four sluice gates and has a 200 m3/s (7,063 cu ft/s) discharge capacity. (en)
  • La diga di Taki (滝ダム Taki damu?) è una diga a gravità sul , 7,3 km ad est di Tadami nella prefettura di Fukushima, in Giappone. I sondaggi per la diga furono condotti nel 1958, la costruzione cominciò nel 1959 e la diga fu completata nel 1961. Lo scopo primario della diga è la produzione di energia idroelettrica; essa alimenta una centrale idroelettrica da 92 MW che consiste di 2 turbine Kaplan da 46 MW. La diga è alta 46 m e lunga 264 m. Essa crea un invaso con una capacità di m3, dei quali 10.300.000 m3 sono attivi (o "utili") per la produzione di elettricità. Lo sfioratore della diga è controllato da quattro paratoie e ha una capacità di scarico di 200 m3/s. (it)
dbo:buildingStartDate
  • 1959
dbo:buildingStartYear
  • 1959-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Concrete gravity (en)
dbo:height
  • 46.000000 (xsd:double)
dbo:lake
dbo:length
  • 264.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 1961-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:river
dbo:thumbnail
dbo:volume
  • 120343.000000 (xsd:double)
dbo:wikiPageID
  • 19665797 (xsd:integer)
dbo:wikiPageLength
  • 4286 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 974041995 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 1959 (xsd:integer)
dbp:damCrosses
dbp:damType
  • Concrete gravity (en)
dbp:location
dbp:locationMap
  • Japan (en)
dbp:name
  • Taki Dam (en)
dbp:opening
  • 1961 (xsd:integer)
dbp:owner
dbp:plantCapacity
  • 92.0
dbp:plantCommission
  • 1961 (xsd:integer)
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 37.386944444444445 139.3838888888889
rdf:type
rdfs:comment
  • Taki Dam (滝ダム) is a gravity dam on the Tadami River, 7.3 km (5 mi) east of Tadami in Fukushima Prefecture, Japan. Surveys for the dam were carried out in 1958, construction began in 1959 and the dam was complete in 1961. The primary purpose of the dam is hydroelectric power generation and it supports a 92 MW power station consisting of 2 x 46 MW Kaplan turbines. The dam is 46 m (151 ft) tall and 264 m (866 ft) long. It creates a reservoir with a 27,000,000 m3 (21,889 acre⋅ft) capacity, of which 10,300,000 m3 (8,350 acre⋅ft) is active (or "useful") for power generation. The dam's spillway is controlled by four sluice gates and has a 200 m3/s (7,063 cu ft/s) discharge capacity. (en)
  • La diga di Taki (滝ダム Taki damu?) è una diga a gravità sul , 7,3 km ad est di Tadami nella prefettura di Fukushima, in Giappone. I sondaggi per la diga furono condotti nel 1958, la costruzione cominciò nel 1959 e la diga fu completata nel 1961. Lo scopo primario della diga è la produzione di energia idroelettrica; essa alimenta una centrale idroelettrica da 92 MW che consiste di 2 turbine Kaplan da 46 MW. La diga è alta 46 m e lunga 264 m. Essa crea un invaso con una capacità di m3, dei quali 10.300.000 m3 sono attivi (o "utili") per la produzione di elettricità. Lo sfioratore della diga è controllato da quattro paratoie e ha una capacità di scarico di 200 m3/s. (it)
rdfs:label
  • Diga di Taki (it)
  • Taki Dam (en)
owl:sameAs
geo:geometry
  • POINT(139.38389587402 37.386943817139)
geo:lat
  • 37.386944 (xsd:float)
geo:long
  • 139.383896 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Taki Dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License