-
The upgrade of the ALICE TPC with GEMs and continuous readout
Authors:
J. Adolfsson,
M. Ahmed,
S. Aiola,
J. Alme,
T. Alt,
W. Amend,
F. Anastasopoulos,
C. Andrei,
M. Angelsmark,
V. Anguelov,
A. Anjam,
H. Appelshäuser,
V. Aprodu,
O. Arnold,
M. Arslandok,
D. Baitinger,
M. Ball,
G. G. Barnaföldi,
E. Bartsch,
P. Becht,
R. Bellwied,
A. Berdnikova,
M. Berger,
N. Bialas,
P. Bialas
, et al. (210 additional authors not shown)
Abstract:
The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. Gas Electron Multiplier (GEM) detectors arranged in stacks containing four GEMs each, and continuous re…
▽ More
The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. Gas Electron Multiplier (GEM) detectors arranged in stacks containing four GEMs each, and continuous readout electronics based on the SAMPA chip, an ALICE development, are replacing the previous elements. The construction of these new elements, together with their associated quality control procedures, is explained in detail. Finally, the readout chamber and front-end electronics cards replacement, together with the commissioning of the detector prior to installation in the experimental cavern, are presented. After a nine-year period of R&D, construction, and assembly, the upgrade of the TPC was completed in 2020.
△ Less
Submitted 25 March, 2021; v1 submitted 17 December, 2020;
originally announced December 2020.
-
Secondary discharge studies in single and multi GEM structures
Authors:
A. Deisting,
C. Garabatos,
P. Gasik,
D. Baitinger,
A. Berdnikova,
M. B. Blidaru,
A. Datz,
F. Dufter,
S. Hassan,
T. Klemenz,
L. Lautner,
S. Masciocchi,
A. Mathis,
R. A. Negrao De Oliveira,
A. Szabo
Abstract:
Secondary discharges, which consist of the breakdown of a gap near a GEM foil upon a primary discharge across that GEM, are studied in this work.
Their main characteristics are the occurrence a few $10\,μ\textrm{s}$ after the primary, the relatively sharp onset at moderate electric fields across the gap, the absence of increased fields in the system, and their occurrence under both field directi…
▽ More
Secondary discharges, which consist of the breakdown of a gap near a GEM foil upon a primary discharge across that GEM, are studied in this work.
Their main characteristics are the occurrence a few $10\,μ\textrm{s}$ after the primary, the relatively sharp onset at moderate electric fields across the gap, the absence of increased fields in the system, and their occurrence under both field directions.
They can be mitigated using series resistors in the high-voltage connection to the GEM electrode facing towards an anode. The electric field at which the onset of secondary discharges occurs indeed increases with increasing resistance. Discharge propagation form GEM to GEM in a multi-GEM system affects the occurrence probability of secondary discharges in the gaps between neighbouring GEMs.
Furthermore, evidence of charges flowing through the gap after the primary discharge are reported. Such currents may or may not lead to a secondary discharge. A characteristic charge, of the order of $10^{10}\,\textrm{electrons}$, has been measured as the threshold for a primary discharge to be followed by a secondary discharge, and this number slightly depends on the gas composition. A mechanism involving the heating of the cathode surface as trigger for secondary discharges is proposed.
△ Less
Submitted 21 January, 2019; v1 submitted 17 January, 2019;
originally announced January 2019.
-
Particle identification studies with a full-size 4-GEM prototype for the ALICE TPC upgrade
Authors:
M. M. Aggarwal,
Z. Ahammed,
S. Aiola,
J. Alme,
T. Alt,
W. Amend,
A. Andronic,
V. Anguelov,
H. Appelshäuser,
M. Arslandok,
R. Averbeck,
M. Ball,
G. G. Barnaföldi,
E. Bartsch,
R. Bellwied,
G. Bencedi,
M. Berger,
N. Bialas,
P. Bialas,
L. Bianchi,
S. Biswas,
L. Boldizsár,
L. Bratrud,
P. Braun-Munzinger,
M. Bregant
, et al. (155 additional authors not shown)
Abstract:
A large Time Projection Chamber is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019/20, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 50 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivit…
▽ More
A large Time Projection Chamber is the main device for tracking and charged-particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2019/20, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 50 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivity to rare probes that are considered key observables to characterize the QCD matter created in such collisions. In order to make full use of this luminosity, the currently used gated Multi-Wire Proportional Chambers will be replaced. The upgrade relies on continuously operated readout detectors employing Gas Electron Multiplier technology to retain the performance in terms of particle identification via the measurement of the specific energy loss by ionization d$E$/d$x$. A full-size readout chamber prototype was assembled in 2014 featuring a stack of four GEM foils as an amplification stage. The performance of the prototype was evaluated in a test beam campaign at the CERN PS. The d$E$/d$x$ resolution complies with both the performance of the currently operated MWPC-based readout chambers and the challenging requirements of the ALICE TPC upgrade program. Detailed simulations of the readout system are able to reproduce the data.
△ Less
Submitted 17 June, 2018; v1 submitted 8 May, 2018;
originally announced May 2018.