Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

"A Fluid Heuristic for Minimizing Makespan in Job Shops."

Jim G. Dai, Gideon Weiss (2002)

Details and statistics

DOI: 10.1287/OPRE.50.4.692.2860

access: closed

type: Journal Article

metadata version: 2022-03-07