Export Citations
Save this search
Please login to be able to save your searches and receive alerts for new content matching your search criteria.
- ArticleJune 2024
Research on the Taxation of Mobile Commerce Digital Assets
Human-Centered Design, Operation and Evaluation of Mobile CommunicationsPages 106–118https://doi.org/10.1007/978-3-031-60487-4_9AbstractIn recent years, with the development of Internet and other technologies and the popularization of smart phone mobile terminals, people’s ideas and shopping methods have changed, and the mobile commerce market has developed rapidly. In this ...
- ArticleJune 2024
Research on Tax Collection and Administration of Mobile Commerce Under Smart Taxation
Human-Centered Design, Operation and Evaluation of Mobile CommunicationsPages 76–86https://doi.org/10.1007/978-3-031-60487-4_6AbstractWith the rapid development of the internet industry and the widespread use of mobile devices, mobile commerce has gradually become an important way of consumption in people’s daily lives. Due to the characteristics of mobility, virtuality, real-...
- research-articleNovember 2020
Model Predictive Current Control with Sliding Mode Speed Control for Brushless DC Motor
2020 IEEE 9th International Power Electronics and Motion Control Conference (IPEMC2020-ECCE Asia)Pages 2234–2238https://doi.org/10.1109/IPEMC-ECCEAsia48364.2020.9367634In this paper, a model predictive current control (MPCC) method based on pseudo-dq transformation is proposed for maximum torque per ampere (MTPA) control of the brushless dc motor (BLDCM). A current predictive model of BLDCM in discrete steps is built. A ...
- ArticleAugust 2017
Mechanism design for strategic project scheduling
IJCAI'17: Proceedings of the 26th International Joint Conference on Artificial IntelligencePages 4433–4439Organizing large scale projects (e.g., Conferences, IT Shows, F1 race) requires precise scheduling of multiple dependent tasks on common resources where multiple selfish entities are competing to execute the individual tasks. In this paper, we consider ...
- ArticleJune 2016
Robust partial order schedules for RCPSP/max with durational uncertainty
In this work, we consider RCPSP/max with durational uncertainty. We focus on computing robust Partial Order Schedules (or, in short POS) which can be executed with risk controlled feasibility and optimality, i.e., there is stochastic posteriori quality ...
- ArticleFebruary 2016
A proactive sampling approach to project scheduling under uncertainty
Uncertainty in activity durations is a key characteristic of many real world scheduling problems in manufacturing, logistics and project management. RCPSP/max with durational uncertainty is a general model that can be used to represent durational ...
- articleDecember 2015
Robust execution strategies for project scheduling with unreliable resources and stochastic durations
Journal of Scheduling (KLU-JOSH), Volume 18, Issue 6Pages 607–622https://doi.org/10.1007/s10951-015-0425-1The resource-constrained project scheduling problem with minimum and maximum time lags (RCPSP/max) is a general model for resource scheduling in many real-world problems (such as manufacturing and construction engineering). We consider RCPSP/max ...
- research-articleMay 2015
DIRECT: A Scalable Approach for Route Guidance in Selfish Orienteering Problems
AAMAS '15: Proceedings of the 2015 International Conference on Autonomous Agents and Multiagent SystemsPages 483–491We address the problem of crowd congestion at venues like theme parks, museums and world expos by providing route guidance to multiple selfish users (with budget constraints) moving through the venue simultaneously. To represent these settings, we ...
- ArticleNovember 2013
Budgeted Personalized Incentive Approaches for Smoothing Congestion in Resource Networks
AbstractCongestion occurs when there is competition for resources by selfish agents. In this paper, we are concerned with smoothing out congestion in a network of resources by using personalized well-timed incentives that are subject to budget ...
- doctoral_thesisJanuary 2012
Robust execution strategy for scheduling under uncertainty
Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max) provides a general model for resource scheduling in many real-world problems (such as manufacturing and construction engineering). Due to its practical ...
- articleJanuary 2012
Robust local search for solving RCPSP/max with durational uncertainty
Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the importance of these ...
- ArticleJanuary 2011
Improving Service through Just-in-Time Concept in a Dynamic Operational Environment
HICSS '11: Proceedings of the 2011 44th Hawaii International Conference on System SciencesPages 1–9https://doi.org/10.1109/HICSS.2011.237This paper is concerned with the problem of Just-In-Time (JIT) job scheduling in a dynamic environment under uncertainty to attain timely service. We provide an approach, based on robust scheduling concepts, to analytically evaluate the expected cost of ...
- ArticleMay 2010
Towards finding robust execution strategies for RCPSP/max with durational uncertainty
Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max) have been studied extensively in the literature. However, the more realistic RCPSP/max problems - ones where durations of activities are not known with ...
- research-articleMay 2009
A method for member selection of R&D teams using the individual and collaborative information
Expert Systems with Applications: An International Journal (EXWA), Volume 36, Issue 4Pages 8313–8323https://doi.org/10.1016/j.eswa.2008.10.020The member selection is an important decision problem in the formation of R&D teams. Selecting suitable members will facilitate the success of R&D projects. In the existing methods for partner selection, the individual information to measure the ...
- ArticleSeptember 2008
Generating Robust Schedules subject to resource and duration uncertainties
We consider the Resource-Constrained Project Scheduling Problem with minimal and maximal time lags under resource and duration uncertainties. To manage resource uncertainties, we build upon the work of Lambrechts et al 2007 and develop a method to ...