Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
article

The manager-analyst interface in systems development

Published: 01 March 1982 Publication History

Abstract

The user-analyst liaison function in system development was studied in thirty-eight large firms using a structured interviewing process. The study revealed that the most prevalent form of liaison is still the traditional systems representative and that the liaison function is generally performed much less formally than the IS literature would suggest. However, a trend toward greater formalism was detected. Other aspects of the liaison function, such as perceptions of the role, relevant career paths, and attitudes toward function were also studied.

References

[1]
Andersen, W.S. "The Expectation Gap," Journal of Systems Management, Volume 29, Number 6, June 1978, pp. 6-10.
[2]
Ashenhurst, R.L., ed. "Curriculum Recommendations for Graduate Professional Program in Information Systems," Communications of the ACM, Volume 15, Number 5, May 1972, pp. 363-398.
[3]
Austin, J.E. "Educating Management in the Use of Information Systems," Advanced Management Journal, Volume 40, Number 2, New York, New York, Spring 1975, pp.37-42.
[4]
Bartol, K.M. "Building Synergistic EDP Teams," in Willoughby, T. ed., Proceedings of the 15th Annual Computer Personnel Research Conference, August 18-19, 1977, Association for Computing Machinery, New York, New York, 1977, pp. 18-30.
[5]
Benbasat, I., Dexter, A.S., and Mantha, R.W. "Impact of Organizational Maturity of Information System Skill Needs," MIS Quarterly, Volume 4, Number 1, March 1980, pp. 21-34.
[6]
Benjamin, R.1. Control of the Information System Development Cycle, Wiley-Interscience, New York, New York, 1971.
[7]
Bostrom, R.P. and Heinen, J.S. "MIS Problems and Failures: A Socio-Technical Perspective, Part I: The Causes," MIS Quarterly, Volume 1, Number 3, September 1977, pp. 17-32.
[8]
Burack, E. and McNichols, T.J. "Human Resource Planning Technology, Policy and Change," Technology, Computers, and Manpower, CARl, Kent, Ohio, 1973.
[9]
Churchill, N.C., Kempter, J., and Uretsky, M. Computer-Based Information Systems for Management: A Survey, National Association of Accountants, New York, New York, 1969.
[10]
Cleland, D.I. and King, W.R. Systems Analysis and Project Management, McGraw-Hill, New York, New York, 1975.
[11]
Cotterman, W.W. Computers in Perspective, Wadsworth Publishing Company, Belmont, California, 1974.
[12]
Couger, D.J., ed. "Curriculum Recommendations for Undergraduate Programs in Information Systems," Communications of the ACM, Volume 16, Number 12, December 1973, pp. 727-749.
[13]
Coverdale, S. "A New Method for Improving Communications Between User Groups and Systems Specialists and Its Impact on Systems Development Efforts," in Willoughby, T., ed., Proceedings of the 15th Annual Computer Personnel Research Conference, August 18-19, 1977, Association for Computing Machinery, New York, New York, 1977, pp.80-93.
[14]
Crane, J. "The Changing Role of the DP Manager," Datamation, Volume 28, Number 1, January 1982, pp. 97-108.
[15]
Dickson, G. and Simmons, J. "The Behavioral Side of MIS," Business Horiions, Volume 13, Number 4, August 1970, pp. 59-71.
[16]
Gibson, C.F. and Nolan, R.L. "Managing the Four Stages of EDP Growth," Harvard Business Review, Volume 52, Number 1, January-February 1874, pp. 76-88.
[17]
Glaser, G. "The Centralization vs. Decentralization Issue: Arguments, Alternatives and Guidelines," Data Base, Volume 2, Number 3, Spring 1973, pp. 1-7.
[18]
Henry, R.M., Dickson, G., and LaSalle, J. "Human Resources for MIS: A report of Research," MISRC-WP-074 -01, University of Minnesota, Minneapolis, Minnesota, May 1974.
[19]
King, W.R. "Methodological Optimality in OR," in Feedback, OMEGA, Volume 4, Number 1, February 1976, pp. 9-12.
[20]
Kintisch, R.S. and Weisbrod, M. "Getting Computer People and Users to Understand Each Other," SAM Advanced Management Journal, Volume 42, Number 2, Spring 1977, pp. 4-14.
[21]
Lucas, H.C., Jr. Why Information Systems Fail, New York, New York, Columbia University Press, 1975.
[22]
Lucas, H.C., Jr. The Analysis, Design, and Implementation of Information Systems," McGraw-Hill Book Co., New York, New York, 1976.
[23]
Lundell, E.D., Jr. "DPer's Need for Socialization Found Very Low," Computerworld, Volume 12, Number 24, June 12, 1978, p.31.
[24]
Manley, J. H. "Implementation Attitudes: A Model and Measurement Methodology," in Schultz, R. and Slevin, D., eds., Implementing Operations Research/Management Science, American Elsevier Publishing Company, New York, New York, 1975.
[25]
Moskowitz, H., Schaeger R.E., and Borcherding, K. "'Irrationality' of Managerial Judgments: Implications for Information Systems," OMEGA, Volume 4, Number 2, April 1976, pp. 125-140.
[26]
Mumford, E. "Designing Systems for Job Satisfaction," OMEGA, Volume 1, Number 4, August 1973, pp. 493-498.
[27]
Nolan, R.L. "Managing the Crises in Dataprocessing," Harvard Business Review, Volume 56, Number 2, March/April 1979, pp. 115-126.
[28]
Richards, M.D. "Some Research Needs in MIS," in Smith, RD., ed., Management Information Systems for the 1970's, Center for Business and Economic Research, Kent, Ohio, 1970.
[29]
Schonberger, R.J. "MIS DeSign: A Contingency Approach," MIS Quarterly, Volume 4, Number 1. March 1980, pp. 13-20.
[30]
Senn, JA "A Management View of Systems Analysts: Failures and Shortcomings," MIS Quarterly, Volume 2, Number 3, September 1978, pp 25-42.
[31]
Stone, J. and Mason, I. "Too Much Jargon Hurts DPer's Credibility," Computer-world, Volume 12, Number 10, March 6, 1978, P 23.
[32]
Wall Street Journal, "Labor Letter: Computer Managers Require More Status and Responsibility at Many Concerns," March 3,1981, p. 1.
[33]
Werner, R. "The Business Systems Professional," MIS Quarterly, Volume 3, Number 1, March 1979, pp 65-66.

Cited By

View all
  • (2010)A Project Staffing Model to Enhance the Effectiveness of Knowledge Transfer in the Requirements Planning Phase for Multi-Project EnvironmentsInternational Journal of Knowledge Management10.4018/jkm.20100401016:2(1-21)Online publication date: 1-Apr-2010
  • (2007)Development of HR module in ERP for IB thermal power station: a case studyInternational Journal of Business Information Systems10.1504/IJBIS.2007.0114182:1(99-125)Online publication date: 1-Nov-2007
  • (2003)A User-Oriented Model of Factors that Affect Information Requirements Determination Process QualityInformation Resources Management Journal10.4018/irmj.200310010216:4(15-32)Online publication date: 1-Oct-2003
  • Show More Cited By

Recommendations

Comments

Information & Contributors

Information

Published In

cover image MIS Quarterly
MIS Quarterly  Volume 6, Issue 1
March 1982
75 pages

Publisher

Society for Information Management and The Management Information Systems Research Center

United States

Publication History

Published: 01 March 1982

Author Tags

  1. information analyst
  2. liaison
  3. project teams
  4. systems development
  5. user involvement

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 16 Oct 2024

Other Metrics

Citations

Cited By

View all
  • (2010)A Project Staffing Model to Enhance the Effectiveness of Knowledge Transfer in the Requirements Planning Phase for Multi-Project EnvironmentsInternational Journal of Knowledge Management10.4018/jkm.20100401016:2(1-21)Online publication date: 1-Apr-2010
  • (2007)Development of HR module in ERP for IB thermal power station: a case studyInternational Journal of Business Information Systems10.1504/IJBIS.2007.0114182:1(99-125)Online publication date: 1-Nov-2007
  • (2003)A User-Oriented Model of Factors that Affect Information Requirements Determination Process QualityInformation Resources Management Journal10.4018/irmj.200310010216:4(15-32)Online publication date: 1-Oct-2003
  • (1998)An empirical validation of a contingency model for information require-ments determinationACM SIGMIS Database: the DATABASE for Advances in Information Systems10.1145/313310.31333329:3(31-51)Online publication date: 1-Jun-1998
  • (1998)Differences between novice and expert systems analystsJournal of Management Information Systems10.1080/07421222.1998.1151819515:1(9-50)Online publication date: 1-Jun-1998
  • (1994)The relationship between user participation and user satisfactionMIS Quarterly10.2307/24952318:4(427-451)Online publication date: 1-Dec-1994
  • (1992)A synthesis of research on requirements analysis and knowledge acquisition techniquesMIS Quarterly10.2307/24970416:1(117-138)Online publication date: 1-Mar-1992
  • (1991)Influencing users to obtain cooperation and compliance in the context of systems design and implementationProceedings of the 1991 conference on SIGCPR10.1145/111084.111102(174-176)Online publication date: 1-Mar-1991
  • (1986)The selection, training, tasks and careers of microcomputer support personnelProceedings of the twenty-second annual computer personnel research conference on Computer personnel research conference10.1145/317210.317231(136-142)Online publication date: 16-Oct-1986
  • (1984)Project management considerations for distributed processing applicationsMIS Quarterly10.2307/2486638:3(161-170)Online publication date: 1-Sep-1984
  • Show More Cited By

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media