Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
article

Ant Colony System algorithm solving a Thermal Generator Maintenance Scheduling Problem

Published: 01 July 2013 Publication History

Abstract

The maintenance scheduling problem of thermal generators is a large-scale combinatorial optimization with constraints. In this paper an Ant Colony System ACS algorithm, one of the Ant Colony Optimization ACO algorithms, is proposed for the maintenance scheduling problem. This ant colony optimization method allows the “agents” of an ant colony to deposit a small amount of pheromone trail to every path that has been explored, thus passing on to the other agents the information concerning the best solution. With the iterations we construct the final solution. This method is called “positive feedback”. The basic optimization routine is reinforced with the introduction of elitist ants who make the best solution stronger. The algorithm is applied to a real-scale system, and further experimenting leads to results that are commented.

References

[1]
E.K. Burke, J.A. Clark and A.J. Smith, Four methods for maintenance scheduling, in: Proceedings of the International Conference on Artificial Neural Networks and Genetic Algorithms, Springer 1997, pp. 264-269.
[2]
M. Charest and J.A. Ferland, Preventative maintenance scheduling of power generation units, Annals of Operations Research 41 (1993), 185-206.
[3]
K.P. Dahal and J.R. McDonald, Generational and steady state genetic algorithms for generator maintenance scheduling problems, Proceedings of the International Conference on Artificial Neural Networks and Genetic Algorithms (1997), 260-264.
[4]
K.P. Dahal and J.R. McDonald, Generator maintenance scheduling of electric power systems using genetic algorithms with integer representation, Submitted to GALESIA'97 (1997).
[5]
J.F. Dopazo and H.M. Merrill, Optimal generator maintenance scheduling using integer programming, IEEE Transactions on Power Apparatus and Systems PAS-94(5) (1975), 1537-1545.
[6]
M. Dorigo and L.M. Gambardella, Ant Colonies for the travellong salesman problem, Bio Systems 43 (1997), 73-81.
[7]
I. El-Amin, S. Duffuaa and M. Abbas, A tabu search algorithm for maintenance scheduling of generating units, King Fahd University of Petroleum and Minerals, (1998-1999).
[8]
J. Gruhl, Electric generation production scheduling using a quasioptimal sequential technique, Research Note MIT-EL 73-003, MIT Energy Lab, April 1973.
[9]
J. Gruhl, Electric power unit commitment scheduling using a dynamically evolving mixed integer program, Research Note MIT-EL 73-007, MIT Energy Lab, January 1973.
[10]
H. Kim, Y. Hayashi and K. Nara, An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TS, IEEE Transactions on Power Systems 12(1) (1997), 329-335.
[11]
H. Kim, K. Nara and M. Gen, A method for maintenance scheduling using GA combined with SA, Comput Industrial Eng 27 (1994), 477-480.
[12]
T. Satoh and K. Nara, Maintenance scheduling by using the simulated annealing method, IEEE Transactions on Power Systems 6 (1991), 850-857.
[13]
A.J. Wood, B.F. Wood and B.F. Woolenberg, Power Generation, Operation, and Control, John Wiley 1984.
[14]
Z.A. Yamayee, K. Sidenblad and M. Yoshimura, A computationally efficient optimal maintenance scheduling method, IEEE Transactions on Power Apparatus and Systems 102(2) (1983), 330-338.
[15]
H.H. Zurn and V.H. Quintana, Generator maintenance scheduling via successive approximations dynamic programming, IEEE Transactions on Power Apparatus and Systems 94(2) (1975), 665-671.

Cited By

View all
  • (2019)A Bio-inspired Datacenter Selection Scheduler for Federated Clouds and Its Application to Frost PredictionJournal of Network and Systems Management10.1007/s10922-018-9481-027:3(688-729)Online publication date: 17-Jul-2019
  • (2017)Joint optimization of preventive maintenance and production scheduling for parallel machines systemJournal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology10.3233/JIFS-16138532:1(913-923)Online publication date: 1-Jan-2017

Recommendations

Comments

Information & Contributors

Information

Published In

cover image Journal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology
Journal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology  Volume 24, Issue 4
July 2013
226 pages

Publisher

IOS Press

Netherlands

Publication History

Published: 01 July 2013

Author Tags

  1. Ant Colony Optimization
  2. Ant Colony System
  3. Thermal Generator Maintenance Scheduling Problem

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 01 Jan 2025

Other Metrics

Citations

Cited By

View all
  • (2019)A Bio-inspired Datacenter Selection Scheduler for Federated Clouds and Its Application to Frost PredictionJournal of Network and Systems Management10.1007/s10922-018-9481-027:3(688-729)Online publication date: 17-Jul-2019
  • (2017)Joint optimization of preventive maintenance and production scheduling for parallel machines systemJournal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology10.3233/JIFS-16138532:1(913-923)Online publication date: 1-Jan-2017

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media