Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
article

Sequencing with earliness and tardiness penalties: a review

Published: 01 February 1990 Publication History

Abstract

No abstract available.

Cited By

View all
  • (2019)On the parameterized tractability of the just-in-time flow-shop scheduling problemJournal of Scheduling10.1007/s10951-019-00617-722:6(663-676)Online publication date: 1-Dec-2019
  • (2019)Single-machine common due date total earliness/tardiness scheduling with machine unavailabilityJournal of Scheduling10.1007/s10951-018-0585-x22:5(543-565)Online publication date: 1-Oct-2019
  • (2019)A unified heuristic and an annotated bibliography for a large class of earliness---tardiness scheduling problemsJournal of Scheduling10.1007/s10951-017-0549-622:1(21-57)Online publication date: 1-Feb-2019
  • Show More Cited By

Recommendations

Comments

Information & Contributors

Information

Published In

Publisher

INFORMS

Linthicum, MD, United States

Publication History

Published: 01 February 1990

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 04 Oct 2024

Other Metrics

Citations

Cited By

View all
  • (2019)On the parameterized tractability of the just-in-time flow-shop scheduling problemJournal of Scheduling10.1007/s10951-019-00617-722:6(663-676)Online publication date: 1-Dec-2019
  • (2019)Single-machine common due date total earliness/tardiness scheduling with machine unavailabilityJournal of Scheduling10.1007/s10951-018-0585-x22:5(543-565)Online publication date: 1-Oct-2019
  • (2019)A unified heuristic and an annotated bibliography for a large class of earliness---tardiness scheduling problemsJournal of Scheduling10.1007/s10951-017-0549-622:1(21-57)Online publication date: 1-Feb-2019
  • (2019)Minmax scheduling problems with common due-date and completion time penaltyJournal of Combinatorial Optimization10.1007/s10878-018-0365-838:1(50-71)Online publication date: 1-Jul-2019
  • (2017)Incentive Alignment and Coordination of Project Supply ChainsManagement Science10.5555/3217051.321705763:4(1011-1025)Online publication date: 1-Apr-2017
  • (2017)Integrated Production, Inventory and Delivery ProblemsINFORMS Journal on Computing10.1287/ijoc.2016.072629:2(232-250)Online publication date: 1-May-2017
  • (2017)Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penaltiesComputers and Operations Research10.1016/j.cor.2016.12.02481:C(203-215)Online publication date: 1-May-2017
  • (2017)Hybrid Genetic Bees Algorithm applied to single machine scheduling with earliness and tardiness penaltiesComputers and Industrial Engineering10.1016/j.cie.2017.07.018113:C(842-858)Online publication date: 1-Nov-2017
  • (2017)Machine scheduling problems in productionComputers and Industrial Engineering10.1016/j.cie.2017.06.026111:C(403-416)Online publication date: 1-Sep-2017
  • (2016)Efficient constructive and composite heuristics for the Permutation Flowshop to minimise total earliness and tardinessComputers and Operations Research10.1016/j.cor.2016.05.00675:C(38-48)Online publication date: 1-Nov-2016
  • Show More Cited By

View Options

View options

Get Access

Login options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media