Benefit Evaluation in IT Project Portfolio Management at Austrian Financial Service Providers

Published: 05 April 2020 Publication History

Abstract

IT is a crucial competitive factor for financial service providers. Thus IT and business have to be aligned continuously on a strategic, tactical and operative level. IT investments are usually managed through projects and project portfolios. The evaluation methods and criteria used for decision support have an impact on which projects are implemented and to what extent. In order to manage IT project portfolios based on value and to support strategically aligned IT investment decisions, structured evaluation not only of monetary but also of qualitative benefits is crucial. There exist numerous business benefit evaluation models in scientific literature, but the implementation in practice is problematic. Five Austrian financial service providers are examined to identify the implementation status, challenges and good practices of benefit evaluation in IT project portfolio management. The observations are set in context to current literature. The findings partly constitute new insights and partly reaffirm existing theories or add additional details to them.

References

[1]
COOPER, R.G., EDGETT, S.J., and KLEINSCHMIDT, E.J., 1997. Portfolio management in new product development: Lessons from the leaders-II. Research-Technology Management 40, 6, 43--52.
[2]
MORRIS, P.W. and JAMIESON, A., 2005. Moving from corporate strategy to project strategy. Project Management Journal 36, 4, 5.
[3]
COOPER, R.G., EDGETT, S.J., and KLEINSCHMIDT, E.J., 1997. Portfolio management in new product development: Lessons from the leaders-I. Research-Technology Management 40, 5, 16--28.
[4]
TIEMEYER, E., 2017. Handbuch IT-Management: Konzepte, Methoden, Lösungen und Arbeitshilfen für die Praxis. Hanser, München; Wien.
[5]
ARCHER, N. and GHASEMZADEH, F., 2007. Project portfolio selection and management. In Morris, P./Pinto, JK (2007), The Wiley Guide to Project, Program & Portfolio Management John Wiley & Sons Inc., Hoboken, New Jersey, 94--112.
[6]
NICHOLAS, J.M. and STEYN, H., 2012. Project management for engineering, business and technology. Routledge, London.
[7]
ZIMMERMANN, S., 2008. Governance im IT-Projektportfoliomanagement - Ein Ansatz zur Berücksichtigung von Strategic Alignment bei der Bewertung von IT. Wirtschaftsinformatik 50, 5, 357--365.
[8]
SHOLLO, A., CONSTANTIOU, I., and KREINER, K., 2015. The interplay between evidence and judgment in the IT project prioritization process. The Journal of Strategic Information Systems 24, 3, 171--188.
[9]
HOWCROFT, D. and MCDONALD, R., 2007. An ethnographic study of IS investment appraisal. International Journal of Technology and Human Interaction (IJTHI) 3, 3, 69--102.
[10]
AFFLERBACH, P., 2015. The Business Value of IT in Light of Prospect Theory. Business & Information Systems Engineering 57, 5, 299--310. DOI= http://dx.doi.org/10.1007/s12599-015-0400-6.
[11]
BUCHTA, D., EUL, M., and SCHULTE-CROONENBERG, H., 2009. Strategisches IT-Management: Wert steigern, Leistung steuern, Kosten senken. Gabler, Wiesbaden.
[12]
LITTKEMANN, J., DERFUß, K., REINBACHER, P., and BESSE, D., 2011. Einsatz von Bewertungsverfahren im IT-Projektcontrolling: Eine Analyse für die Finanzdienstleistungsbranche. Controlling & Management 55, 4, 252--261.
[13]
WALTER, S.G. and SPITTA, T., 2004. Approaches to the Ex-ante Evaluation of Investments into Information Systems. Wirtschaftsinformatik 46, 3, 171--180.
[14]
PAPP, R., 1999. Business-IT alignment: productivity paradox payoff? Industrial Management & Data Systems 99, 8, 367--373.
[15]
PIETSCH, T., 2003. Bewertung von Informations-und Kommunikationssystemen: Ein Vergleich betriebswirtschaftlicher Verfahren. Erich Schmidt Verlag.
[16]
MARTINSUO, M. and KILLEN, C., 2014. Value Management in Project Portfolios: Identifying and Assessing Strategic Value. Project Management Journal 45. DOI= http://dx.doi.org/10.1002/pmj.21452.
[17]
PMA - PROJEKT MANAGEMENT AUSTRIA, P., 2016. Projektportfoliomanagement in österreichsichen Unternehmen - Österreich - Studie 2016 PMA - Projekt Management Austria, Planview.
[18]
COOPER, R.G., EDGETT, S.J., and KLEINSCHMIDT, E.J., 2001. Portfolio Management for New Product Development: Results of an Industry Practices Study. R&D Management (Industrial Research Inst., Inc.) 31, 4.
[19]
GADATSCH, A., KÜTZ, M., and FREITAG, S., 2017. Ergebnisse der 5. Umfrage zum Stand des IT-Controllings im deutschsprachigen Raum 2017. Schriftenreihe des Fachbereiches Wirtschaft Sankt Augustin, FH Bonn-Rhein-Sieg Band 34, 9--53.
[20]
BAUMÖL, U. and ICKLER, H., 2008. Wertorientiertes IT-Controlling: Projektselektion als Werkzeug der Projektportfolio-Steuerung. In Proceedings of the Multikonferenz Wirtschaftsinformatik (München, 26. - 28.02.2008-2008), GITO- Verlag, 975--987.
[21]
LAUX, H., GILLENKIRCH, R.M., and SCHENK-MATHES, H.Y., 2012. Entscheidungstheorie: mit 69 Tabellen. Springer Gabler, Berlin [u.a.].
[22]
COOPER, R.G., EDGETT, S.J., and KLEINSCHMIDT, E.J., 2004. Benchmarking Best NPD Practices-III. Research-Technology Management 47, 6, 43--55. DOI= http://dx.doi.org/10.1080/08956308.2004.11671662.
[23]
MESKENDAHL, S., 2010. The influence of business strategy on project portfolio management and its success -a conceptual framework. International Journal of Project Management 28, 8, 807--817.
[24]
FILIPPOV, S., MOOI, H., and VAN DER WEG, R., 2012. Strategic project portfolio management: An empirical investigation. Journal on Innovation and Sustainability. RISUS ISSN 2179-3565 3, 1.
[25]
WENDLER, R. and LEUPOLD, S., 2011. Alignment als Entscheidungsgrundlage für die IT-Projektauswahl. HMD Praxis der Wirtschaftsinformatik 48, 4, 94--103.
[26]
DICKINSON, M.W., THORNTON, A.C., and GRAVES, S., 2001. Technology portfolio management: optimizing interdependent projects over multiple time periods. IEEE Transactions on engineering management 48, 4, 518--527.
[27]
PADOVANI, M., MUSCAT, A., CAMANHO, R., and CARVALHO, M., 2008. Looking for the right criteria to define projects portfolio: multiple case study analysis. Product: Management & Development 6, 2, 127--134.
[28]
WEHRMANN, A., HEINRICH, B., and SEIFERT, F., 2006. Quantitatives IT-Portfoliomanagement - Risiken von IT-Investitionen wertorientiert steuern. Wirtschaftsinformatik 48, 4, 234--245.
[29]
TINGLING, P.M. and BRYDON, M.J., 2010. Is decision-based evidence making necessarily bad. MIT Sloan Management Review 51, 4, 71--76.
[30]
PROJECT MANAGEMENT INSTITUTE, I., 2008. A guide to the project management body of knowledge (PMBOK guide). Newtown Square, Pa.: PMI, Project Management Inst., Newtown Square, Pa.
[31]
CHIASSON, M.W. and DAVIDSON, E., 2005. Taking industry seriously in information systems research. MIS Q. 29, 4, 591--605.
[32]
LIN, K.H., LIN, C., and TSAO, H.-Y., 2006. IS/IT investment evaluation and benefit realization practices in Taiwanese SMEs. Journal of Information Science & Technology 2, 4.
[33]
DEWAN, S., SHI, C., and GURBAXANI, V., 2007. Investigating the Risk-Return Relationship of Information Technology Investment: Firm-Level Empirical Analysis. Management Science 53(12/01), 1829--1842. DOI= http://dx.doi.org/10.1287/mnsc.1070.0739.
[34]
PRICEWATERHOUSE COOPERS, 2011. Lohnen sich ihre Projekte wirklich? Pricewaterhouse Coopers.
[35]
UNGER, B.N., KOCK, A., GEMÜNDEN, H.G., and JONAS, D., 2012. Enforcing strategic fit of project portfolios by project termination: An empirical study on senior management involvement. International Journal of Project Management 30, 6, 675--685.
[36]
ZWIKAEL, O. and SMYRK, J., 2012. A general framework for gauging the performance of initiatives to enhance organizational value. British Journal of Management 23, S1.
[37]
WARD, J. and DANIEL, E., 2006. Benefits management: Delivering value from IS & IT investments. John Wiley & Sons, Chichester, GB.
[38]
MESSERSCHMIDT, M., SCHÜLEIN, P., and MURNLEITNER, M., 2008. Der Wertbeitrag der IT zum Unternehmenserfolg. Manage IT as a business. PricewaterhouseCoopers AG WPG.

Cited By

View all
  • (2023)The Use of Benefits Management in E-Government ProjectsPublic Policy’s Role in Achieving Sustainable Development Goals10.4018/978-1-6684-8903-1.ch016(279-295)Online publication date: 30-Jun-2023

Index Terms

  1. Benefit Evaluation in IT Project Portfolio Management at Austrian Financial Service Providers

    Recommendations

    Comments

    Information & Contributors

    Information

    Published In

    cover image ACM Other conferences
    ICCMB '20: Proceedings of the 2020 the 3rd International Conference on Computers in Management and Business
    January 2020
    303 pages
    ISBN:9781450376778
    DOI:10.1145/3383845
    Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

    In-Cooperation

    • Univ. of Manchester: University of Manchester
    • The Hong Kong Polytechnic: The Hong Kong Polytechnic University

    Publisher

    Association for Computing Machinery

    New York, NY, United States

    Publication History

    Published: 05 April 2020

    Permissions

    Request permissions for this article.

    Check for updates

    Author Tags

    1. IT project portfolio management
    2. benefit evaluation criteria
    3. financial service providers
    4. management information system

    Qualifiers

    • Research-article
    • Research
    • Refereed limited

    Conference

    ICCMB 2020

    Contributors

    Other Metrics

    Bibliometrics & Citations

    Bibliometrics

    Article Metrics

    • Downloads (Last 12 months)27
    • Downloads (Last 6 weeks)1
    Reflects downloads up to 12 Jan 2025

    Other Metrics

    Citations

    Cited By

    View all
    • (2023)The Use of Benefits Management in E-Government ProjectsPublic Policy’s Role in Achieving Sustainable Development Goals10.4018/978-1-6684-8903-1.ch016(279-295)Online publication date: 30-Jun-2023

    View Options

    Login options

    View options

    PDF

    View or Download as a PDF file.

    PDF

    eReader

    View online with eReader.

    eReader

    Media

    Figures

    Other

    Tables

    Share

    Share

    Share this Publication link

    Share on social media