Scheduling Post-disaster Repairs in Electricity Distribution Networks with Uncertain Repair Times
Abstract
References
Index Terms
- Scheduling Post-disaster Repairs in Electricity Distribution Networks with Uncertain Repair Times
Recommendations
Parallel Machine Scheduling with Batch Setup Times
<P>We consider a problem of scheduling several batches of jobs on two identical parallel machines to minimize the total completion time of jobs. A setup time is incurred whenever there is a switch from processing a job in one batch to a job in another ...
Single-machine scheduling with past-sequence-dependent delivery times and release times
This paper studies the problem of single-machine scheduling with past-sequence-dependent delivery times, which was introduced in Koulamas and Kyparisis (2010) [5]. We focus on the scenario with release times such that any job is available for processing ...
On the Complexity of Scheduling with Batch Setup Times
Many practical scheduling problems involve processing several batches of related jobs on common facilities where a setup time is incurred whenever there is a switch from processing a job in one batch to a job in another batch. We extend various ...
Comments
Information & Contributors
Information
Published In
Publisher
Association for Computing Machinery
New York, NY, United States
Publication History
Check for updates
Qualifiers
- Research-article
Contributors
Other Metrics
Bibliometrics & Citations
Bibliometrics
Article Metrics
- 0Total Citations
- 109Total Downloads
- Downloads (Last 12 months)13
- Downloads (Last 6 weeks)0
Other Metrics
Citations
View Options
Get Access
Login options
Check if you have access through your login credentials or your institution to get full access on this article.
Sign in