Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
skip to main content
10.1145/3659211.3659294acmotherconferencesArticle/Chapter ViewAbstractPublication PagesbdeimConference Proceedingsconference-collections
research-article

A New Economic Evaluation Method for Big Data Technology of Power Grid Engineering in the Background of Power System Based on Network Analysis Method

Published: 29 May 2024 Publication History

Abstract

With the hot construction of the new power system, the power load is steadily increasing. At the same time, China's resource and environmental constraints are becoming increasingly severe, and various pressures on power grid construction are constantly emerging. This has led to an increasing demand and data volume for the construction of the new power system in China. This article proposes a big data technology and economic level evaluation method for power grid engineering projects based on the Network Analysis Method (ANP). This method can effectively overcome the problems of too many influencing factors and complex data forms in the evaluation process.

References

[1]
Zhou Qinyong, “How to build a new type of power system that meets the "dual carbon” goal” [J]. Energy, 2021, No.153 (10): 28-32
[2]
Hossain M A, Pota H R, Hossain M J,et al.Evolution of microgrids with converter-interfaced generations: Challenges and opportunities[J].International Journal of Electrical Power & Energy Systems, 2019, 109(JUL.):160-186.
[3]
Chu Xiaojie, “Research on the Evaluation Method of Technology and Economy under Power Grid Companies and Their Market Operations” [D]. Changsha University of Technology, 2008
[4]
Jiang Peng, “Research on Technical and Economic Evaluation Methods for Power Grid Planning Schemes [D]. Shanghai Jiao Tong University, 2010
[5]
Han Xiaoqing, Li Tingjun, Zhang Dongxia, “New Issues and Key Technologies in the Planning of New Power Systems under the Dual Carbon Target ”[J]. High Voltage Technology, 2021, 47 (09): 3036-3046.
[6]
Chicco G, Mancarella P. Distributed multi-generation: A comprehensive view[J]. Renewable and sustainable energy reviews, 2009, 13(3): 535-551.
[7]
Gouareh A, Settou B, Settou N. A new geographical information system approach based on best worst method and analytic hierarchy process for site suitability and technical potential evaluation for large-scale CSP on-grid plant: An application for Algeria territory[J]. Energy Conversion and Management, 2021, 235: 113963.
[8]
Tang Yafang, “Optimization Model for Annual Investment Decision of Distribution Network Based on Annual Expected Maximum Return” [J] Grid and Clean Energy, 2015, 31 (09): 6-11
[9]
Zhang Wenhua, Yan Qingyou, He Gang, and Yuan Jiahai, “The low-carbon transformation path and strategy of China's power system under climate change constraints” [J]. Progress in Climate Change Research, 2021, 17 (01): 18-26

Index Terms

  1. A New Economic Evaluation Method for Big Data Technology of Power Grid Engineering in the Background of Power System Based on Network Analysis Method

        Recommendations

        Comments

        Information & Contributors

        Information

        Published In

        cover image ACM Other conferences
        BDEIM '23: Proceedings of the 2023 4th International Conference on Big Data Economy and Information Management
        December 2023
        917 pages
        ISBN:9798400716669
        DOI:10.1145/3659211
        Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than the author(s) must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected].

        Publisher

        Association for Computing Machinery

        New York, NY, United States

        Publication History

        Published: 29 May 2024

        Permissions

        Request permissions for this article.

        Check for updates

        Qualifiers

        • Research-article
        • Research
        • Refereed limited

        Funding Sources

        • State Gird Jiangsu Electric Power CO., LTD. Economic Research Institute

        Conference

        BDEIM 2023

        Contributors

        Other Metrics

        Bibliometrics & Citations

        Bibliometrics

        Article Metrics

        • 0
          Total Citations
        • 10
          Total Downloads
        • Downloads (Last 12 months)10
        • Downloads (Last 6 weeks)1
        Reflects downloads up to 06 Feb 2025

        Other Metrics

        Citations

        View Options

        Login options

        View options

        PDF

        View or Download as a PDF file.

        PDF

        eReader

        View online with eReader.

        eReader

        HTML Format

        View this article in HTML Format.

        HTML Format

        Figures

        Tables

        Media

        Share

        Share

        Share this Publication link

        Share on social media