1. Introduction
The world has seen a surge in the construction of hydropower dams in recent decades. At least 3700 big dams, each with an installed hydroelectric capacity of more than 1 MW, are now planned or under construction, mostly in developing nations. For example, 8507 dams are planned in Europe, with 278 now under construction, primarily in the Balkans [
1]. Because of its high altitudes in the upper Indus region and abundant water, the Indus basin has a large hydropower potential to be developed. It is extremely difficult to use water efficiently because the region continues to face one of the world’s most significant water management challenges of water storage infrastructure, or inefficient water use as a result of water losses in obsolete irrigation systems [
2]. Nearly 2000 TWh of theoretical potential available annually in the upper Indus can be deceiving because the vast majority of it is technically and economically unviable. When we account for the various sustainability constraints that vary spatially, the potential becomes even lower [
3]. The Indus basin is a trans-boundary and the most vulnerable basin shared by Pakistan, India, Afghanistan and China, causing considerable hydro-political tensions [
4]. Integrated approaches are required to achieve Sustainable Development Goals (SDGs) for water, energy and food requirements for the Indus basin [
5]. The global warming in the region is also a big threat towards water and food security. The upper Indus basin exhibits that the global pace of warming as the region is expected to reach the 1.5 °C and 2.0 °C thresholds almost a decade earlier than the corresponding warming at the global scale [
6].
Indus basin is a trans-boundary basin unique composition. Its total area is about 1,120,000 km
, which constitutes about 54% of the Southeast Asia. It runs through four countries Pakistan, India, China and Afghanistan with an area of 520,000, 440,000, 88,000 and 72,000 km
, respectively. Pakistan and India are using 60% and 25% water of the Indus basin, respectively [
7]. In order to use this water judiciously, both countries signed “The Indus Waster Treaty” in 1960 [
8]. Under this treaty, India gained control of the Beas, Ravi, and Sutlej rivers, while Pakistan gained control of the Indus, Chenab, and Jhelum rivers. The water distribution amongst provinces in Pakistan is according to Provincial Water Accord 1991 [
9]. In Pakistan, there is a broad agribusiness and water system framework, alluded to as the Indus Basin Irrigation System (IBIS). This is the biggest bordering water system framework on the planet. The normal yearly stream of the Indus bowl is around 146 MAF. It has two noteworthy capacity repositories, specifically Mangla and Tarbela. It consists of 19 barrages, 12 interface canals, and 45 noteworthy canal commands. The aggregate length of canals is around 60,000 km and around 120,000 watercourses to irrigate farms. It inundates 16.2 million hectare and contributes about 25% of Gross Domestic Product (GDP). It wins about 70% of the export income and utilizes 50% of the workforce straightforwardly and another 20% in a roundabout way [
10].
The study of the Indus Basin of Pakistan carries a long legacy of planning and research. In order to manage the Indus Basin River System (IBRS), the work on the Indus Basin Model started in 1976 by the World Bank and the Water and Power Development Authority (WAPDA) jointly with a view to address the water dependent economy of Pakistan. The preliminary work on Indus Basin Model by Johannes Bisschop et al. [
11] proposed a high level Indus Basin Model based on linear programming. The goal was to maximize the overall basin income aggregating the individual fifty-three polygons income using multi-level programming [
12]. Instead of presenting mathematical details of IBMR, the author focused on the multi-decision-making aspect of model and posed it as a hierarchical decision-making problem.
The work on the Indus Basin Model (IBM) started by O’Mara et al. [
13]. This paper comprehensively describes the Indus Basin Model (IBM) family, structure, model validation and simulation results to access the conjunctive use in the Indus irrigation system for alternative policies (
Figure 1). Alexander Meeraus and Masood Ahmad launched an Agricultural Impact Study (AIS) [
14] in September 1985 to assess the impact of the Kalabagh Dam on Pakistan’s Agriculture sector and the first draft of the report was completed in July 1986. In this report, the Indus Basin Model using linear programming was used with computer implementation in the FORTRAN language to run on a main frame computer environment. This first version focused on farm level water distribution, and income assessment. Later on, all other versions were developed in GAMS [
10,
15] and used for the management of water resources distribution in different polygons, crops production, demand and supply of provinces, livestock, etc. The subsequent refined version is called the Indus Basin Model Revised (IBMR), jointly developed WAPDA of Pakistan and World Bank Development Research Center for Water [
16]. In IBMR, the mathematical complexities were simplified by reducing the number of equations, constraints, and, at the same time, replacing polygons into Agro Climatic Zones (ACZ). The whole country has been divided into 12 ACZ zones 5 in Punjab, 4 in Sindh, 2 in Khyper Pakhtunkhwa and 1 in Baluchistan.
The Indus Water System can be categorized in three eras, namely Pre Indus Water Treaty (1947–1960) period; Post Indus Water Treaty (1960–1975); and the Management era (1975–2000). It describes a half century perspective on management of the Indus basin focusing crisis planning, multi strategies planning to achieve governance goals, plantation at multiple topographical levels for water management, regional water management to variation patterns and scientific planning to explore alternatives [
18]. The Indus River System Model (IRSM) was developed in parallel to the Indus Basin Model and is used as a planning tool for water management options in Pakistan. This model is discussed in the report published in 14 August 2018 and jointly prepared by the Commonwealth Scientific and Industrial Research Organization (CSIRO) Australia and the Sustainable Development Policy Institute (SDPI) Pakistan. The project was funded by the Australian Government and supported by the Government of Pakistan. The main purpose of the project was to build capacity and knowledge management in water resources management with the prime focus on Integrated Water Resources Management [
19].
1.1. The Indus Basin and Hydro-Electric Power
Indus River also plays an important role in hydropower generation of Pakistan. The total existing installed power capacity by all means as of March 2017 was about 29,945 MW, thermal being the largest share (68.4% of capacity), hydro stands at second position (23.8%), renewable about 4.1%, and a small share of nuclear power plants approximately 3.6% [
20]. The generated power at any specific time is considerably underneath the available generation capacity and shows up at its trough all through the winter when low water levels decline the hydropower yield. Pakistan has a huge hydropower potential of 60,000 MW and currently only about 8300 MW of power is being generated as per Energy Book of 2018. Therefore, there is a considerable room for expansion in the area. According to Pakistan’s 2040 indicative generation mix, hydropower would take the largest share of about 40% of total generation [
21]. The results obtained from research reflect that, by 2040, the share of renewable and hydropower is expected to be about 16% and 40% of the total generation mix of Pakistan, respectively. To increase reliance on wind and solar energy, the government started the Jhimpir wind station in Karachi and Quaid-e-Azam Solar Park, in Bahawalpur [
22,
23]. Tarbela and the Mangla are the two major hydroelectric power stations using water spared from agriculture needs. These power stations coordinate with thermal generations for minimum cost of production of electrical energy subject to the satisfaction of constraints.
The prosperity index of a country is gauged by its per capita energy consumption. The world’s average per capita energy consumption is about 2516 kWh, which is six times higher than Pakistan’s consumption. In 2008, the reported shortfall was 4500 MW, which is 40% of the demand. The reason behind this gap is depletion of local reserves of oil and gas. The country has a huge estimated potential of 42 GW hydropower, out of which only 6.5 GW has been exploited so far [
24]. The period of 1975–2010 exhibits a log-linear relationship between electricity production and economic growth. On the basis of a lot of research in the power sector, Pakistan has a huge potential for hydropower. Based on this fact, hydropower plants are beneficial for two reasons. First, they produce clean energy. Second, the production cost would also decrease, resulting in lower tariff rates [
25]. Pakistan has a unique natural resources distribution as compared to developed countries. These resources include solar energy, wind energy, coal and hydropower [
26,
27,
28,
29].
The IBMR purely deals with optimal utilization of water for irrigation needs only. However, it cannot handle the optimal use of water for both agriculture and power generation requirements. This paper presents a hybrid IBMR model addressing optimal utilization of water for both agriculture and power generation needs. The philosophy of this model is that it maximizes the CPS considering the exceedance probabilities for inflows subject to the satisfaction of constraints. The objective function has been modified by incorporating control parameter alpha
and integrating the energy cost of hydropower generation. The proposed model is implemented in GAMS and has been tested for scenarios with and without hydropower generation. The rest of the paper is organized as follows:
Section 2 covers the literature.
Section 3 is dedicated to the system modeling.
Section 4 explains methodology.
Section 5 elaborates the case studies, economic analysis of the proposed system and related discussions.
Section 6 concludes the study and finally
Section 7 discusses a few ideas for future work.
1.2. Contributions
The summary of main contributions to the paper is given below:
The main objective function of the IBMR is modified and the impact of hydropower generation is incorporated in CPS calculation.
A control parameter has been introduced to control the water allocation for agriculture and power sector.
Mapping of the proposed model in GAMS to run on Dell Latitude Core i7 laptop with 7820HQ 2.9 GHz processor and 16 GB of RAM in order to obtain results: CPS calculation and optimized energy generation mix for year 2040 and yearly energy generation up to 2040.
2. Literature Review
River basins are the planet’s hydrological units, and they play a crucial role in the planet’s natural functioning. These are the backbone of agriculture and have a lion share towards economy. There are 263 river basins in the world ranging from small, medium to large [
30]. Lakshmi et al. [
31] discussed the 10 major basins namely Amazon, California, Colorado, Congo, Danube, Ganga Brahmaputa, Mekong, Mississippi, Murray–Darling, Nile and Yangtze in the context of precipitation, vegetation, evapotranspiration, total water, soil moisture and runoff with reference to their variations and impacts on the basins economy. The basin model is used to represent the relevant processes in a river basin, predicts the behavior of the basin under different circumstances or management scenarios and helps decision-makers to make rational water allocation among various users and sectors. The key issues for river basins users include water resources allocation, maintaining water quality, and rapidly growing demand [
32,
33].
Dhaubanjar et al. [
34] provides the first theoretical framework that can assess the sustainable hydropower potential of the Indus basin. The selection of the Indus basin for this study is due to its high theoretical potential that combines with transboundary water issues, socio economic challenges, landscape vulnerability and high-water demand. For this study, hydropower potential is classified into four main classes, which is theoretical potential, technical potential, economic potential and sustainable exploitable potential (sustainably achievable potential that links hydropower with other SDGs). This framework is developed based on three main factors. Firstly, it incorporates the tools related to the hydropower development and associated SDGs that are available in the literature. Secondly, it incorporates local consideration of hydropower design. Thirdly, it includes thirty novel datasets to parameterize real world constraints like natural, legal, disaster and social constraints into mathematical models. This framework evaluates the hydropower potential at a basin scale considering two runs of river hydropower configurations. It is useful in combining the SDG 7 (energy) with S (food and water).
Hairaan et al. [
35] conducted a detailed critical review of the literature related to the basin of some important rivers of southeast Asia. This study assesses the current status of environmental flow and river sustainability of Mekong River, Brahmaputra River, Citarum River and Muda River. The data are extracted from the literature related to the river hydrology, water quality, river alteration and restoration variables, which are then correlated for the assessment. Based on this study, it is concluded that, due to unsustainable utilization of the resources, stream flow of rivers is degrading with respect to both quantity and quality. Therefore, environmental flow assessment is a demanding approach of the time to attain river sustainability.
Shirast et al. [
36] studied the effect of ten climate change scenarios on water availability and hydropower production of two contrasting small hydropower plants (SHP) in the upper Beas basin in the 21st century. The WEAP (Water Evaluation and Planning) model is used to combine cryosphere hydrology and hydropower production for this study. Simulated streamflow shows a complex relationship between hydrological response and future climate with uncertainties. The study shows that large flow hydropower plants are more sensitive to climate change than SHPs, and these have low flow and large heads. The assessment of glacio- hydrological changes and their impact on the power production using this framework is helpful in the planning of SHPs in the Himalayan region. Grover et al. [
37] studied the impact of temperature and precipitation on hydrological factors that include discharge, ice melt, snow contribution and seasonal discharge in the high altitude scarcely gauged Chenab basin. The impact of major climatic variables on hydrological processes are quantified using biased corrected GCM (General Circulation Models) coupled with the HBV hydrological model for Chenab River. The study shows that climate change factors under RCP 8.5 and RCP 4.5 will increase the discharge throughout the century. A shift in annual discharge pattern is also observed. Furthermore, temperature increase will enhance snow meltdown, which would result in further increase of the flow of Chenab River. This whole scenario would affect basin water management, irrigation, storage and hydropower plants.
The Water Resources Management in South Asia is important with reference to present and future scenarios. Some important facts related to regional per capita water availability, population growth vs. per capita water availability, decreasing live storage capacity of reservoirs and province wise soil salinity status have been discussed. Mathematical Modeling of the Upper-Indus Glaciers and governing equation are discussed [
38]. Pakistan’s water profile has shifted dramatically, from one of abundance to one of scarcity. Per capita water availability decreased from 2172 m
per tenant to 1306 m
per occupant between 1990 and 2015. Pakistan takes out 74.3% of its freshwater yearly, subsequently applying gigantic weight on inexhaustible water resources [
39].
Assessments of global water bargains recommend that riparian states are not paying attention to the counsel to receive Integrated Water Resources Management (IWRM). Speculations propose that the bigger the quantity of arranging states, the lower the expense (per condition) of the joint activity of arrangements, yet the higher the exchange expenses of arranging and looking after them. The model exchanges between advantages and expenses related to the quantity of bargain signatories and apply it to a worldwide settlement informational index. Discoveries affirm that the exchange expenses of arrangement and the economies of scale are significant in deciding the scarcity of bowl wide understandings, the bargains’ substance, and their degree [
40].
“Pakistan’s Water Economy: Running Dry”, a notable study [
41] by the World Bank received global attention on the Indus Basin Water Resources issues. In the recent past, the WAPDA and the World Bank analyzed to update the IBMR with reference to climate change impact on the Indus Basin. In [
42], Yang et al. analyze the impact of climate change in the Indus Basin. The author studied the impact of climate changes in the basin. They also worked on Indus Basin Model Revision after 1992, and the revised version is known as Indus Basin Model Revised 2012 (IBMR-2012). IBMR-2012 was used to explore the impact of climate change for food security and water allocation in the Indus Basin. Hydro-climatic parameters’ sensitivity analysis for the provinces showed that Punjab would be impacted with the least climate change in the future, whereas Sindh would suffer the most. According to the World Bank’s 2020–2021 report, Pakistan may face a severe food shortage in the near future. The water shortage will increase to 32% by 2025, resulting in a food deficiency of nearly 70 million tonnes [
43].
In 2015, the UN conceived the 2030 Agenda for Sustainable Development Goals [
44]. The government of Pakistan adopted Sustainable Development Goals (SDGs) through National Assembly Resolution in 2016 and became the first country in the world to do so. The national and provincial assemblies of the country formed specific task forces for implantation of SDGs. These steps are the reflection of national commitment to the SDGs. The national commitment to these priorities favors the 2030 Agenda. Pakistan is a fortunate country having 60,000 MW potential sites for hydropower generation. Tarbela and the Mangla are the two major hydroelectric power stations using water spared from agriculture needs. These power stations coordinate with thermal generations for the minimum cost of production of electrical energy subject to the satisfaction of constraints.
Pakistan wants to reduce its reliance on imported resources over the next five years. To direct the sector towards sustainability, it will steadily and significantly increase the share of indigenous, renewable resources in the nation’s energy generation mix. A newly developed road map for a competitive power market will also be introduced. The Punjab government has planned to solarize 20,000 campuses, with an emphasis on rural areas. Solar panels will be installed in 10,800 schools in South Punjab as part of the first step of the “Ujala” initiative. The ‘energy benchmarking’ of public buildings is currently underway, with the goal of facilitating energy conservation, solar energy conversion, and energy efficiency improvements. The Sustainable Energy for All (SE4All) initiative aims to provide universal access to energy, while doubling the pace of energy quality change and increasing the share of renewable energy in the generation mix. Through the consultative process, a related National Action Plan 2018–2030 was finalized and released in 2019 [
45].
3. System Modeling
IBMR is an hydro economic model jointly developed by the World Bank and WAPDA. It has many inputs and outputs related to water distribution and agricultural yields. The main objective function of IBMR is Consumer Producer Surplus (CPS), which is an indicator of basin-wide income. The Model is implemented in GAMS language and based upon the GRG optimization method. In this paper, we have used nonlinear demand and supply for IBMR. The objective function of IBMR-2012 does not account for the hydropower contribution in CPS. In the current paper, hydropower contribution is also incorporated in CPS calculation. A control parameter has been introduced in the newly proposed objective function to control the multi-sectoral water distribution.
The operational conceptual model of IBMR is shown in
Figure 2 indicating the standard inputs/outputs.
3.1. Objective Function
The Consumer Producer Surplus (CPS) [
42] calculates the basin-wide income in the following way:
In the objective function, the Slackvariables reflect a penalty for not having enough water in the network flow model or not having enough produce to meet on-farm consumption. In actuality, there is an insufficient supply of irrigation water, output does not necessarily halt. As a result, this variable prevents infeasibilities under low-flow conditions and imposes constraints.This also implies that the objective value may not accurately reflect the true basin-wide net economic profits that would be observed in the event of a water shortage.
The newly proposed objective function includes energy costs that are given below:
This newly proposed objective function includes energy costs, and the control parameter is given below:
where
Z is the Agro Climatic Zone (ACZ) index,
G is the groundwater type index,
C is the crop index,
M is the month index, and
N is the node or reservoir index. The control
is a control parameter, and it varies from 0 to 1. Zero means all water is utilized for hydropower generation, whereas one shows that all water is allocated for agricultural purposes.
3.2. Cost Function
The basin wide cost [
42] includes the cost of seed, tube well operating cost, fertilizer cost, protein cost, labor cost and misc costs, and it is given by:
where
SEA is the season index (rabi and kharif).
W is the water application index (for example, standard, mild, or high stress, where stress application uses less water and labor and yields less production).
S is the cropping sequence index (e.g., standard, late, or early planting).
3.3. Hydro Electric Power Generation
Power generation is calculated by using the potential energy of stored water in reservoir, and it is given by [
46]:
where
P—the generated power in kVA
Q—water flow rate
—water density
H—height of waterfall (m)
—the efficiency ratio (usually between 0.7 and 0.9)
g—acceleration due to gravity
The maximum available energy generated within 24 h in (GWh) is given using the following formula:
3.4. Major Constraints and Limitations
Although all the equations and constraints of IBMR are very large in number and not possible to mention here, few important constraints are given below:
where
i and
jare indexes for node
i and
j,
Z is the Agro climatic Zone (ACZ) index,
G is the groundwater type index,
CE refers to the commodity index and
M is the month index. These constraints are related to inflows in the canal, canal capacity, exports, canal diversions, slakeland and upper (Up) and lower (Lo) limits of volume in the reservoir.
Major constraints include the following:
Canal Commands: 42 canal commands are used to represent the whole irrigation system.
The Inter-Provincial Accord 1991: IRSA Rules are used for water allocation to the provinces.
Reservoir Operating Rule: Monthly lower and upper boundaries of reservoir capacity are used as upper and lower bounds. No complex, operating rules are defined for this purpose.
Turbine efficiency: 80% efficiency is used.
Only fifteen crops are the part of current IBMR.
Aquifer behavior is not considered in the modeling.
5. Results and Discussion
This section contains case studies dealing with the analysis of the proposed scenarios, and their results with discussion.
5.1. Scenario1
Whole Water Is Utilized for Agriculture If the whole water is used for agriculture purposes, the net basin-wide economic benefit calculated by using IBMR-2021 is 33,605.85 million dollars. This number is very close to economic benefits of agriculture income calculated using IBMR 2012.
5.2. Scenario2: Whole Water Is Utilized for Power Generation
If the whole water is used for electricity generation purposes, the net basin-wide economic benefit calculated by using IBMR-2021 is 9,567,606.66 million dollars. This number is very large and gives rise to a huge economic benefit apparently but is not practical because, if there is no agriculture, then there is no concept of life.
5.3. Scenario3: Water Is Utilized Both for Agricultural Purposes and Power Generation
The option to use water for both agriculture and power generation fulfills both food and power needs. This can be achieved using the parameter
introduced in Equation (
2). If 50% water is used for agriculture and the remaining 50% is used for power generation, about 2.73 billion dollars in benefits is increased. Please note that all the calculations are performed using an updated Indus Basin Model Revised 2021 (IBMR-2021) with 50% inflow exceedance probability.
5.4. Impact of on Agriculture and Power Generation
The parameter
controls the usage of water for both agriculture and power generation in IBMR. The value of
= 1 means that the whole water is used for agriculture purposes, whereas the value of
= 0 shows the total water potential for hydropower generation.
Figure 5 shows the impact of
on agriculture and power generation.
From
Figure 5, it can be observed that
= 0.5 is the equilibrium point for both agriculture and energy monitory values. For
= 0.1, the maximum increase in CPS is around 11.83%, and it gradually decreases with the increase of
. When
is 0.9, the minimum increase in CPS is 1.29%, as shown in
Table 3. The results show that, the greater the water allocation for hydropower, the greater the economic benefit. The variation of CPS for different values of
is shown in
Figure 5.
5.5. Impact of Hydropower on Basin Wide Income
Using the proposed formulation for CPS and hydropower generation, basin wide income (CPS) has been calculated using the IBMR-2021 model. Results are shown in the
Table 3 and
Table 4: Please note that we have used 50% and 80% exceedance probabilities for these calculations. It is observed that basin wide income increases by about 11.83% with the inclusion of power generation in CPS. For details, please see the
Table 3 and
Table 4.
5.6. Cost Comparison of Hydro Energy with Other Energy Sources
Table 5 shows price comparison among different sources of energy. From the table, it is evident that hydropower has the lowest Per Kilowatt Hour cost as compared to other sources.
5.7. Pakistan’s Water Budget and Associated Problem
Figure 6 depicts Pakistan’s water budget and associated problems i.e., the mean annual River inflows (140 MAF), flows to Arabian (27 MAF), total water available water (140 + 50 + 13 = 203 MAF), total losses (10 + 26 + 23 + 10 + 24 + 27 = 120), total available water for crops consumption is 83 MAF. Thus, the total available water for agricultural use is about 40.89% and total losses are 59.11% [
59]. Therefore, it is recommended to take necessary actions for infrastructure maintenance to avoid this large amount of loss and increase productivity.
5.8. Output Data
The outputs from the proposed IBMR are of great importance for policymakers and researchers. It provides a great insight to policymakers for future planning in the field of agriculture and hydropower generation. The main objective function provides the basin-wide income and net profit from agricultural production and power generation. It also provides the value of water stored in reservoirs, agricultural imports and exports, the economic benefits, and the flow of water to the sea.
5.9. Pakistan’s Energy Mix by the Year 2040
The energy mix composition calculated by the proposed IBMR model is shown in
Figure 7. The pie chart shows that the hydro power will take a major share of about 40% followed by 25% local coal and renewable being the third largest contributor of about 16%. By 2040, we would have around 56% of the hydro and renewable energy share in accordance with the SDG 7 initiative by the government of Pakistan. The obtained results are in close agreement with results given in the indicative generation plan 2040 by NTDC. This indicates the promise of the approach.
5.10. Indicative Generation Plan for the Year 2040
An exponential model has been derived using the data from NTDC to obtain a yearly indicative generation plan.
Table 6 shows the comparison between the Indicative Generation Plan for the year 2040 by NTDC [
21] and that calculated using the proposed IBMR-2021. The estimated values from both NTDC and IBMR-2021 are 370,348.00 GWh and 367,549.84 GWh, respectively, and in good agreement with the reference energy estimated by NTDC.
5.11. Government Initiatives under SDG 7 for Hydropower Generation
Maintaining uninterrupted energy sources needs a high level of energy integration. Pakistan’s renewable energy policy is being improved in order to attract investment in a safe, renewable, and affordable energy mix. In order to reduce gas shortages, the country is also looking for ways to tap into its unconventional gas resource potential.
Table 7 shows the hydropower projects under construction and their expected time of completion,
$/kw cost and generation capacity.
6. Conclusions
This paper presents the modified IBMR-2021 dealing optimal usage of water for both agriculture and electrical power generation. This model is a valuable addition for both IRSA and NTDC and supports government commitment towards SDG. The main objective function of IBMR-2012 that calculates CPS has been modified to incorporate the optimal share of water for electrical power generation. In the current research, an enhanced version of IBMR has been proposed which accounts for hydropower generation along with agriculture. The aim was to study the impact of hydropower on basin wide income by incorporating hydropower generation in IBMR modified version. The following three cases studies have been analyzed, and results are presented. The current research broadens the use of IBMR not only for agriculture but also for hydropower generation and planning, aiming to reduce the energy costs and effective utilization of water:
Scenario1: Currently, the IBMR accounts for this scenario, i.e., the whole water is used for agriculture and basin wide income is purely rely on agriculture income.
Scenario2: Explains an extreme scenario when all of the water is utilized for hydropower. In this case, the net basin income goes very high, but practically we cannot spare all of the water for hydropower.
Scenario3: This scenario covers both agriculture and hydropower generation income simultaneously in one objective function. If 50% water is allocated for agriculture and the rest of the 50% for power generation, about 2.73 billion dollars in benefit is increased.
The analysis of these case studies show that basin-wide income increases by 11.83% using 50% exceedance probability with the inclusion of power generation. The results are in agreement with reference to power generation estimated by NTDC. Green energy due to technological breakthroughs has gained a lot of attention and provides cost-effective solutions for power needs. The Government initiatives for a hydropower project and NTDC year 2040 plan both emphasize hydropower, which is clean and affordable energy. Hence, pushing for and ensuring delivery of SDG 7 in full letter and spirit. In order to exploit the hydropower potential of the Indus River System, the incorporation of the hydrothermal coordination aspect in this modified version could be another exciting and innovative dimension for future work.Traditionally, IBMR has been used by WAPDA and other policy makers for agriculture and irrigation related planning.