Macaé-class patrol vessel

The Macaé class are a series of offshore patrol vessels being built for the Brazilian Navy by Arsenal de Marinha do Rio de Janeiro.

Class overview
NameMacaé class
BuildersAMRJ, INACE
Operators Brazilian Navy
Preceded byGrajaú class
Succeeded byNavio Patrulha de 500 Toneladas
In commission2009–present
Building2
Completed3
Active3
General characteristics
TypeOffshore patrol vessel
Displacement500 tons
Length55.6 m (182 ft 5 in)
Beam9.3 m (30 ft 6 in)
Draught2.5 m (8 ft 2 in)
Propulsion2 × MTU 16V 4000 M90
Speed21 knots (39 km/h; 24 mph)
Range2,500 nmi (4,600 km; 2,900 mi) at 15 knots (28 km/h; 17 mph)
Complement35
Sensors and
processing systems
  • Sperry Marine VisionMaster FT Integrated Bridge Navigation System
  • FT250 X band and S band radars
Armament
NotesSources:[1][2]

History

edit

The class was based on the CMN Vigilante 400 CL54 design.[3] The first two Macaé-class ships were built by INACE, following a 2006 contract. It was delivered in 2012, while the second ship was delivered in 2010.[4]

The construction of Maracanã and Mangaratiba was halted in the mid-2010s, and restarted in the early 2020s. The laid down of Miramar took place in November 2024.[5]

Ships of the class

edit
Name Hull no. Builder Laid down Commissioned
Macaé P70 INACE 24 November 2006 13 December 2009
Macau P71 17 July 2007 30 November 2010
Maracanã P72 AMRJ 25 November 2009 7 September 2022[6]
Mangaratiba P75 19 December 2013[7] Planned 2025[5]
Miramar P76 28 November 2024[5] Planned 2028[5]

References

edit
  1. ^ "Integrated Bridge Systems for New Brazil Navy Patrol Boats". Sperry Marine. Archived from the original on 25 July 2011. Retrieved 6 February 2010.
  2. ^ "Brazil set to procure BAE Systems Bofors 40 mm weapons". Janes. Retrieved 6 May 2015.
  3. ^ Salles, Felipe. "Novos NPas de 500 toneladas já tem nomes e designadores definidos". www.alide.com.br. Retrieved 23 August 2022.
  4. ^ "Macaé-Class Patrol Vessels, Brazil". Naval Technology. Retrieved 23 August 2022.
  5. ^ a b c d "Com verbas do PAC, Marinha inicia construção do 5º navio-patrulha da classe Macaé". Agência Brasil (in Portuguese). 28 November 2024.
  6. ^ Padilha, Luiz (4 May 2022). "NPa Maracanã (P 72) será entregue em 7 de setembro". defesaaereanaval.com.br (in Portuguese). Retrieved 7 September 2022.
  7. ^ Padilha, Luiz (19 December 2013). "Marinha do Brasil vai realizar o Batimento de Quilha do NPa 'Magé'". defesaaereanaval.com.br (in Portuguese). Retrieved 26 November 2024.